NPDES TXR15408W · Clean Water Act
CEDAR PORT PHASE III BUILDING 4, Baytown, TX: NPDES TXR15408W discharge permit, effluent exceedances, inspections, penalties
CEDAR PORT PHASE III BUILDING 4, Baytown, Texas: General permit coverage TXR15408W, held by Clay Development & Construction, Inc.; Construction stormwater; Administratively continued; issued April 1, 2019, term to March 4, 2023; discharges to UNNAMED DRAINAGE CHANNEL.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 240 were issued before TXR15408W. Clay Development & Construction, Inc. holds 8 permits in Texas.
Other permits held by Clay Development & Construction, Inc.
- NW99 DC II, Tomball: TXR1506YS, issued 2026-06-29
- SOUTH MAIN DISTRIBUTION CENTER I, Houston: TXR1528NZ, issued 2023-08-14
- ABLE INDUSTRIAL, Houston: TXR1537AO, issued 2019-11-01
- TWINWOOD DISTRIBUTION CENTER IV, Brookshire: TXR1537YI, issued 2026-05-21
- TWINWOOD DISTRIBUTION CENTER V, Brookshire: TXR1538YI, issued 2026-05-21
- PEDERSON WEST SPEC 1, Katy: TXR1543XZ, issued 2026-04-20
- KENNEDY GREENS DC V, Houston: TXR1544XZ, issued 2026-04-20
Coverages issued nearest TXR15408W
- 2019-03-01: WATER DISTRIBUTION IMROVEMENTS PHASE II, Cameron: TXR15733V, held by Elliott Construction, LLC
- 2019-03-01: 10-ACRE COMMERCIAL DEVELOPMENT, Baytown: TXR15735V, held by Bovay Engineers, Inc.
- 2019-04-01: CHERRY PEAK OFFICE CONDOS LOT 1 BLOCK B, Lakeway: TXR15405W, held by Peak Design Build LLC
- 2019-04-01: NORTH PARK 18, Odessa: TXR15406W, held by Betenbough Homes, LLC
- 2019-04-01: HARRIS COUNTY CSCD EXPANSION AT ATASCOCITA, Humble: TXR15407W, held by THE GONZALEZ GROUP, LP
- 2019-04-01: PARADIGM METALS INC, Hutto: TXR15409W, held by Harley Blackburn Holdings, LLC
- 2019-04-01: PROPOSED CLEARING & GRUBBING TO SERVE HIGHLAND MEADOWS, Rosenberg: TXR15412W, held by Fort Bend Excavation, Inc.
- 2019-04-01: EAST MONTGOMERY COUNTY MUD 5, New Caney: TXR15413W, held by East Montgomery County Municipal Utility District 5
- 2019-04-01: 2635-05-001 ABC PHASE 2, Amarillo: TXR15414W, held by Texas Department of Transportation
- 2019-04-01: VALVOLINE INSTANT OIL CHANGE - RICHMOND TX, Richmond: TXR15415W, held by Valvoline LLC
CEDAR PORT PHASE III BUILDING 4 among its neighbors
97 discharge permits are in the Cedar Point Lateral-Cedar Bayou subwatershed (HUC 120402030106); TXR15408W is one.
Other permits in the Cedar Point Lateral-Cedar Bayou subwatershed (HUC 120402030106)
- 230042 DRAINAGE IMPROVEMENTS IN THE CEDAR BAYOU, Baytown: TXR1502NG, minor, term to 2028-03-04
- 99 BARGE TERMINAL, Baytown: TXR05GE48, minor, term to 2026-08-13
- ABUNDIA GLOBAL IMPACT GROUP, Baytown Etj: TXR1502XJ, minor, term to 2028-03-04
- ALAMO CONCRETE PRODUCTS PLANT #104, Baytown: TXG111449, minor, term to 2021-11-07
- AMERIPORT 13, Baytown: TXR1522YF, minor, term to 2028-03-04
- BAYER BAYTOWN PLANT, Chambers County: TX0002798, major, term to 2022-07-01
- BAYTOWN 146 AKA VELOCIS BAYTOWN, Baytown: TXR1503YG, minor, term to 2028-03-04
- BAYTOWN AREA WATER AUTHORITY EAST SURFACE WTP PHASE 2 EXPAN, Baytown: TXR1542XF, minor, term to 2028-03-04
- BAYTOWN GROVE, Baytown: TXR1530TV, minor, term to 2028-03-04
- BAYTOWN PLANT, Chambers County: TXG110890, minor, term to 2011-11-07
What stands out
- Its term runs 3 years and 337 days, April 1, 2019 to March 4, 2023; the term ended 1,291 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CEDAR PORT PHASE III BUILDING 4 |
|---|---|
| Permittee | Clay Development & Construction, Inc. |
| NPDES ID | TXR15408W |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 1, 2019 |
| Expires | March 4, 2023 |
| Address | Baytown, TX 77803 |
| Receiving water | UNNAMED DRAINAGE CHANNEL |
| Subwatershed | Cedar Point Lateral-Cedar Bayou (HUC 120402030106) |
NPDES TXR15408W: effluent limits and exceedances
CEDAR PORT PHASE III BUILDING 4 (NPDES TXR15408W): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR15408W: no pollutant row on file.
NPDES TXR15408W: inspections, violations and enforcement
NPDES TXR15408W (CEDAR PORT PHASE III BUILDING 4): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR15408W
NPDES TXR15408W: one email when its EPA record changes — $99/month.
Permits near NPDES TXR15408W
NPDES TXR15408W: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.