NPDES TXR1553WO · Clean Water Act
ALLENS CREEK STORMWATER MITIGATION SECTOR 2, Sealy, TX: NPDES TXR1553WO discharge permit, effluent exceedances, inspections, penalties
ALLENS CREEK STORMWATER MITIGATION SECTOR 2, Sealy, Texas: General permit coverage TXR1553WO, held by SOLID BRIDGE CONSTRUCTION, LLC; Construction stormwater; Effective; issued November 25, 2025, term to March 4, 2028; discharges to BRAZOS RIVER BELOW NAVASOTA RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 17,266 were issued before TXR1553WO. SOLID BRIDGE CONSTRUCTION, LLC holds 23 permits in Texas.
Other permits held by SOLID BRIDGE CONSTRUCTION, LLC
- BRAZOS COUNTY BRIDGE SCOUR REPAIR PROJECT CIP 24-614, Bryan: TXR1507RQ, issued 2024-07-30
- FOSTERS RIDGE CHANNEL REHAB PHASE 1, Conroe: TXR1516ON, issued 2023-09-28
- SMITHVILLE SOUTHEAST DRAINATE IMPROVEMENTS, Smithville: TXR1517YC, issued 2026-04-29
- LAKE TRISTAN DAM, Woodville: TXR1518YC, issued 2026-04-29
- INTERCONTINENTAL CENTER DR OFFSITE WATERLINE & DETENTION 2, Houston: TXR1528PH, issued 2023-12-14
- WAVERLY PLACE SECTION 3, New Waverly: TXR1531SL, issued 2024-10-15
- HOMESTEAD HILL DRAINAGE AND PAVING, New Waverly: TXR1533QC, issued 2024-03-01
- GT BARS, Montgomery: TXR1545UD, issued 2025-04-02
- G105-04-01 CHANNEL REHABILITATION, Deer Park: TXR1546ZB, issued 2026-08-06
- GLO CDBG-MIT DRAINAGE IMPROVEMENTS, Somerville: TXR1547TB, issued 2024-12-19
Coverages issued nearest TXR1553WO
- 2025-11-25: EXXONMOBIL GREENBELT DEMOLITION PRIORITY B, Baytown: TXR1546WO, held by Exxon Mobil Corporation
- 2025-11-25: HANOVER SUGAR LAND, Sugar Land: TXR1548WO, held by Sugar Land Mf Owner LLC
- 2025-11-25: KISSING TREE AKA PASO ROBLES PHS 3E 6C AND 8A, San Marcos: TXR1549WO, held by Weekley Homes, LLC
- 2025-11-25: SUNRISE RD REPAIR, Wilmer: TXR1550WO, held by Structure Tone Southwest, LLC
- 2025-11-25: ELECTRICAL DUCT BANK ALONG COMMON DOCK DRIVE, Houston: TXR1552WO, held by HARPER BROTHERS CONSTRUCTION LLC
- 2025-11-25: POTRANCO CENTER, San Antonio: TXR1554WO, held by Nooner Holdings, Ltd.
- 2025-11-25: CARAWAY TRACT PUBLIC IMPROVEMENTS, Kyle: TXR1556WO, held by Liberty Civil Construction, LLC
- 2025-11-25: PARKSIDE ON THE RIVER GTII PHASE 2, Georgetown: TXR1557WO, held by Liberty Civil Construction, LLC
- 2025-11-25: CAPELLA COTTAGES, Dallas: TXR1558WO, held by Tdjrev Construction, LLC
- 2025-11-25: SUNSET RANCH OFFSITE & MARILEE MEASURING STATION, Celina: TXR1559WO, held by Mission Site Services LLC
ALLENS CREEK STORMWATER MITIGATION SECTOR 2 among its neighbors
18 discharge permits are in the Lower Allens Creek subwatershed (HUC 120701040305); TXR1553WO is one. Its county: 72, 0 major; TXR1553WO is minor permit.
Other permits in the Lower Allens Creek subwatershed (HUC 120701040305)
- 07036-1010 SEALY TX WALMART DISTRIBUTION CENTER, Sealy: TXR1507YI, minor, term to 2028-03-04
- 7036 - WALMART DISTRIBUTION CENTER SEALY TX, Sealy: TXR1523ZB, minor, term to 2028-03-04
- ALLENS CREEK GRANT FLOOD CONTROL & DRAINAGE IMPROVEMENTS, Sealy: TXR1581RY, minor, term to 2028-03-04
- ALLENS CREEK WWTP, Sealy: TX0025054, minor, term to 2024-11-15
- AMERIFORGE SEALY, Sealy: TXR05GG97, minor, term to 2026-08-13
- HENDRIX INDUSTRIES, Sealy: TXR05HC19, minor, term to 2026-08-13
- KOY CONCRETE SEALY PLANT, Sealy: TXG110364, minor, term to 2021-11-07
- OFFSITE DRAINAGE EASEMENT FOR WESTWARD POINTE, Sealy: TXR1573SD, minor, term to 2028-03-04
- SEALY CONCRETE, Sealy: TXG113104, minor, term to 2026-11-06
- SEALY HWY 36, Sealy: TXR1514QO, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 100 days, November 25, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ALLENS CREEK STORMWATER MITIGATION SECTOR 2 |
|---|---|
| Permittee | SOLID BRIDGE CONSTRUCTION, LLC |
| NPDES ID | TXR1553WO |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 25, 2025 |
| Expires | March 4, 2028 |
| Address | Sealy, TX 77474 |
| Receiving water | BRAZOS RIVER BELOW NAVASOTA RIVER |
| Subwatershed | Lower Allens Creek (HUC 120701040305) |
NPDES TXR1553WO: effluent limits and exceedances
ALLENS CREEK STORMWATER MITIGATION SECTOR 2 (NPDES TXR1553WO): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1553WO: no pollutant row on file.
NPDES TXR1553WO: inspections, violations and enforcement
NPDES TXR1553WO (ALLENS CREEK STORMWATER MITIGATION SECTOR 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1553WO
NPDES TXR1553WO: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1553WO
NPDES TXR1553WO: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.