NPDES TXR1557WO · Clean Water Act
PARKSIDE ON THE RIVER GTII PHASE 2, Georgetown, TX: NPDES TXR1557WO discharge permit, effluent exceedances, inspections, penalties
PARKSIDE ON THE RIVER GTII PHASE 2, Georgetown, Texas: General permit coverage TXR1557WO, held by Liberty Civil Construction, LLC; Construction stormwater; Effective; issued November 25, 2025, term to March 4, 2028; discharges to SOUTH FORK SAN GABRIEL RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 17,266 were issued before TXR1557WO. Liberty Civil Construction, LLC holds 45 permits in Texas.
Other permits held by Liberty Civil Construction, LLC
- MARIGOLD - PHASE 3 - LD, Uhland: TXR1501YY, issued 2026-07-23
- VILLAGE AT SPRINKLE CUTOFF, Austin: TXR1504YC, issued 2026-04-29
- RIVINA PHASE 1, Georgetown: TXR1505XM, issued 2026-02-27
- LAS ENTRADAS, Manor: TXR1506ZJ, issued 2026-09-04
- LIDELL WALKER PH 2B, Hutto: TXR1507QC, issued 2024-03-01
- US FOOD SERVICE, Buda: TXR1507UP, issued 2025-05-14
- DRIPPING SPRINGS TARGET, Dripping Springs: TXR1507XW, issued 2026-04-07
- CASCADES AT ONION CREEK PH 4, Austin: TXR1508WP, issued 2025-12-01
- PARKSIDE ON THE RIVER SECTIONS 9B AND 10B, Georgetown: TXR1510VH, issued 2025-07-21
- NORTHLINE BLOCKS O & Y, Leander: TXR1510XZ, issued 2026-04-17
Coverages issued nearest TXR1557WO
- 2025-11-25: SUNRISE RD REPAIR, Wilmer: TXR1550WO, held by Structure Tone Southwest, LLC
- 2025-11-25: ELECTRICAL DUCT BANK ALONG COMMON DOCK DRIVE, Houston: TXR1552WO, held by HARPER BROTHERS CONSTRUCTION LLC
- 2025-11-25: ALLENS CREEK STORMWATER MITIGATION SECTOR 2, Sealy: TXR1553WO, held by SOLID BRIDGE CONSTRUCTION, LLC
- 2025-11-25: POTRANCO CENTER, San Antonio: TXR1554WO, held by Nooner Holdings, Ltd.
- 2025-11-25: CARAWAY TRACT PUBLIC IMPROVEMENTS, Kyle: TXR1556WO, held by Liberty Civil Construction, LLC
- 2025-11-25: CAPELLA COTTAGES, Dallas: TXR1558WO, held by Tdjrev Construction, LLC
- 2025-11-25: SUNSET RANCH OFFSITE & MARILEE MEASURING STATION, Celina: TXR1559WO, held by Mission Site Services LLC
- 2025-11-25: STREAM DFWC1, Wilmer: TXR1560WO, held by DPR Construction, Inc.
- 2025-11-25: DAVID JORDAN HOMES RED FEATHER ESTATES, Lubbock: TXR1562WO, held by David Jordan Homes LLC
- 2025-11-25: SILVERLEAF, Cedar Creek: TXR1567WO, held by SARATOGA HOMES OF TEXAS AUSTIN, LLC
PARKSIDE ON THE RIVER GTII PHASE 2 among its neighbors
89 discharge permits are in the Lower South Fork San Gabriel River subwatershed (HUC 120702050203); TXR1557WO is one. Its county: 965, 17 major; TXR1557WO is minor permit.
Other permits in the Lower South Fork San Gabriel River subwatershed (HUC 120702050203)
- 183 258 LIBERTY HILL WWTP, Liberty Hill: TX0145882
- ALAMO CONCRETE PRODUCTS GEORGETOWN PLANT 75, Georgetown: TXG110064, minor, term to 2021-11-07
- ALAMO CONCRETE PRODUCTS WEIR QUARRY 1300, Georgetown: TXR05FB88, minor, term to 2026-08-13
- BAGDAD ROAD ROW CLEARING PROJECT, Liberty Hill: TXR1533TY, minor, term to 2028-03-04
- BAGDAD ROAD ROW CLEARING PROJECT, Liberty Hill: TXR1582UB, minor, term to 2028-03-04
- BLUEBONNET PLAZA LOT 2, Georgetown: TXR1531UV, minor, term to 2028-03-04
- BLUEBONNET WWTP, City Of Leander: TX0149535
- BLUFF HAVEN BLUFFVIEW, Georgetown: TXR1506YQ, minor, term to 2028-03-04
- BLUFFVIEW PHASE 1, Georgetown: TXR1522SC, minor, term to 2028-03-04
- BLUFFVIEW PHASE 1, Georgetown: TXR1568WV, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 100 days, November 25, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PARKSIDE ON THE RIVER GTII PHASE 2 |
|---|---|
| Permittee | Liberty Civil Construction, LLC |
| NPDES ID | TXR1557WO |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 25, 2025 |
| Expires | March 4, 2028 |
| Address | Georgetown, TX 78628 |
| Receiving water | SOUTH FORK SAN GABRIEL RIVER |
| Subwatershed | Lower South Fork San Gabriel River (HUC 120702050203) |
NPDES TXR1557WO: effluent limits and exceedances
PARKSIDE ON THE RIVER GTII PHASE 2 (NPDES TXR1557WO): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1557WO: no pollutant row on file.
NPDES TXR1557WO: inspections, violations and enforcement
NPDES TXR1557WO (PARKSIDE ON THE RIVER GTII PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1557WO
NPDES TXR1557WO: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1557WO
NPDES TXR1557WO: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.