NPDES UTG071771 · Clean Water Act
MILLVILLE SEWER SYSTEM, Millville City, UT: NPDES UTG071771 discharge permit, effluent exceedances, inspections, penalties
MILLVILLE SEWER SYSTEM, Millville City, Utah: General permit coverage UTG071771, held by Whitaker Construction; Administratively continued; issued July 15, 2024, term to November 28, 2024, by Utah Division of Water Quality.
- Solids, total suspended: 3 limits, 27 violations of any kind.
- Flow rate: 2 limits, 18 violations of any kind.
- pH: 2 limits, 18 violations of any kind.
- Oil and grease: 1 limit, 9 violations of any kind.
- Oil and grease visual: 1 limit, 9 violations of any kind.
Other permits held by Whitaker Construction
- MONTEC PUMPING STATION REPLACEMENT, West Valley City: UTG070742, issued 2015-03-17
- 3000 W SEWER REHAB, Syracuse: UTG071842, issued 2024-05-10
- PROVO WESTSIDE SEWER OUTFALL PHASE 2, Provo: UTG072021, issued 2025-08-11
- COLD SPRINGS PIPELINE REHABILITATION PHASE II, Spanish Fork: UTG072164, issued 2026-08-04
- NDSD 5600 S. SEWER, Roy: UTRC00280, issued 2020-04-06
- 6200 SOUTH ZONE C PUMP STATION, Kearns: UTRC02168, issued 2021-02-24
- SOLACE AT SANTA CLARA, Santa Clara: UTRC04462, issued 2022-02-22
- WHITAKER ST. GEORGE OFFICE, St. George: UTRC05144, issued 2022-05-26
- WEBER HYDROELECTRIC DAM AND POWER PLANT, Ogden: UTRC06946, issued 2023-05-25
- SLVSWF MODULE 8, Salt Lake City: UTRC07102, issued 2023-06-20
MILLVILLE SEWER SYSTEM among its neighbors
72 discharge permits are in the Millville Canyon-Blacksmith Fork subwatershed (HUC 160102030209); UTG071771 is one.
Other permits in the Millville Canyon-Blacksmith Fork subwatershed (HUC 160102030209)
- 542 E. 1080 S. PROVIDENCE UT., Providence: UTRH00730, minor, term to 2021-06-30
- ALTITUDE TOWNHOUSE IRRRIGATIONS, Logan: UTRL00679
- APPLE CREEK SUBDIVISION, Nibley: UTR386851, minor, term to 2020-05-30
- BASSETT HOME, Providence: UTRH03348, minor, term to 2022-06-29
- BASSETT RETAINING WALL, Providence: UTRH08500, minor, term to 2025-08-21
- BENTLEY ESTATES, Providence: UTRL00399
- BENTLEY ESTATES, Providence: UTRL00401
- BINGHAM RESIDENCE - LOT 7, JOHNSON POINT MEADOWS, Nibley: UTRH11442, minor, term to 2027-05-19
- BLACKSMITH FORK VILLAS INTERSTATE COMMERCIAL PROPERTIES, Hyrum: UTG070739, minor, term to 2016-02-03
- BLACKSTONE HEADQUARTERS, Providence: UTRC07581, minor, term to 2025-09-13
Identity
| Facility | MILLVILLE SEWER SYSTEM |
|---|---|
| Permittee | Whitaker Construction |
| NPDES ID | UTG071771 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | July 15, 2024 |
| Expires | November 28, 2024 |
| Agency | Utah Division of Water Quality |
| Address | Millville City, UT 84332 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Millville Canyon-Blacksmith Fork (HUC 160102030209) |
NPDES UTG071771: effluent limits and exceedances
MILLVILLE SEWER SYSTEM (NPDES UTG071771): 5 pollutants on file, 5 limited; 5 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Solids, total suspended | 3 | 27 | 0 | ||
| Flow rate | 2 | 18 | 0 | ||
| pH | 2 | 18 | 0 | ||
| Oil and grease | 1 | 9 | 0 | ||
| Oil and grease visual | 1 | 9 | 0 |
NPDES UTG071771: inspections, violations and enforcement
NPDES UTG071771 (MILLVILLE SEWER SYSTEM): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTG071771
NPDES UTG071771: one email when its EPA record changes — $99/month.
Permits near NPDES UTG071771
NPDES UTG071771: 5 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.