NPDES UTG072164 · Clean Water Act
COLD SPRINGS PIPELINE REHABILITATION PHASE II, Spanish Fork, UT: NPDES UTG072164 discharge permit, effluent exceedances, inspections, penalties
COLD SPRINGS PIPELINE REHABILITATION PHASE II, Spanish Fork, Utah: General permit coverage UTG072164, held by Whitaker Construction; Effective; issued August 4, 2026, term to August 4, 2027, by Utah Division of Water Quality.
No violation or effluent exceedance is on file for any of the 5 pollutants listed for NPDES UTG072164.
- Solids, total suspended: 9 limits.
- Flow rate: 6 limits.
- pH: 6 limits.
- Oil and grease: 3 limits.
- Oil and grease visual: 3 limits.
Other permits held by Whitaker Construction
- MONTEC PUMPING STATION REPLACEMENT, West Valley City: UTG070742, issued 2015-03-17
- MILLVILLE SEWER SYSTEM, Millville City: UTG071771, issued 2024-07-15
- 3000 W SEWER REHAB, Syracuse: UTG071842, issued 2024-05-10
- PROVO WESTSIDE SEWER OUTFALL PHASE 2, Provo: UTG072021, issued 2025-08-11
- NDSD 5600 S. SEWER, Roy: UTRC00280, issued 2020-04-06
- 6200 SOUTH ZONE C PUMP STATION, Kearns: UTRC02168, issued 2021-02-24
- SOLACE AT SANTA CLARA, Santa Clara: UTRC04462, issued 2022-02-22
- WHITAKER ST. GEORGE OFFICE, St. George: UTRC05144, issued 2022-05-26
- WEBER HYDROELECTRIC DAM AND POWER PLANT, Ogden: UTRC06946, issued 2023-05-25
- SLVSWF MODULE 8, Salt Lake City: UTRC07102, issued 2023-06-20
COLD SPRINGS PIPELINE REHABILITATION PHASE II among its neighbors
163 discharge permits are in the Middle Spanish Fork Creek subwatershed (HUC 160202020502); UTG072164 is one.
Other permits in the Middle Spanish Fork Creek subwatershed (HUC 160202020502)
- 346 CLEGG CANYON, Mapleton: UTRC10603, minor, term to 2026-04-02
- 3548 EAST 1800 SOUTH SPANISH FORK, Spanish Fork: UTRH07098, minor, term to 2024-09-19
- 478 MAPLE LAKES DRIVE, Mapleton: UTRH08538, minor, term to 2025-08-27
- 509 W 350 S, Mapleton: UTRH11553, minor, term to 2027-06-09
- 53 E TWIN HOLLOW, Mapleton: UTRH11827, minor, term to 2027-08-04
- 582 WEST BRUSH CANYON DRIVE, Mapleton: UTRH01851, minor, term to 2021-12-07
- 681 SLANT, Mapleton: UTRC11786, minor, term to 2026-10-15
- 72 E 400 SOUTH MAPLETON, UTAH, Mapleton: UTRH00928, minor, term to 2021-07-30
- 72 EAST 400 SOUTH MAPLETON, Mapleton: UTRH10704, minor, term to 2026-12-01
- ALLEN MAPLETON RESIDENCE, Mapleton: UTRH09350, minor, term to 2026-03-11
What stands out
- Its term runs 1 year, August 4, 2026 to August 4, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; the file names no program for it, and it is a minor discharger.
Identity
| Facility | COLD SPRINGS PIPELINE REHABILITATION PHASE II |
|---|---|
| Permittee | Whitaker Construction |
| NPDES ID | UTG072164 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | August 4, 2026 |
| Expires | August 4, 2027 |
| Agency | Utah Division of Water Quality |
| Address | Spanish Fork, UT 84660 |
| Subwatershed | Middle Spanish Fork Creek (HUC 160202020502) |
NPDES UTG072164: effluent limits and exceedances
COLD SPRINGS PIPELINE REHABILITATION PHASE II (NPDES UTG072164): 5 pollutants on file, 5 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Solids, total suspended | 9 | 0 | 0 | ||
| Flow rate | 6 | 0 | 0 | ||
| pH | 6 | 0 | 0 | ||
| Oil and grease | 3 | 0 | 0 | ||
| Oil and grease visual | 3 | 0 | 0 |
NPDES UTG072164: inspections, violations and enforcement
NPDES UTG072164 (COLD SPRINGS PIPELINE REHABILITATION PHASE II): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTG072164
NPDES UTG072164: one email when its EPA record changes — $99/month.
Permits near NPDES UTG072164
NPDES UTG072164: 5 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.