THE RESERVE PHASES 4-6, Tooele, UT: NPDES UTR384135 discharge permit, effluent exceedances, inspections, penalties
THE RESERVE PHASES 4-6, Tooele, Utah: General permit coverage UTR384135, held by Perry Homes; Construction stormwater; Administratively continued; issued January 18, 2024, term to January 15, 2025, by UTDEQ.
- September 28, 2026: Reconnaissance without Sampling (S).
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 6,584 were issued before UTR384135. Perry Homes holds 32 permits in Utah.
Other permits held by Perry Homes
- MAJOR ESTATES PH 1-2, Layton: UTR369247, issued 2020-11-13
- OVERLAKE ESTATES, Tooele: UTR371441, issued 2025-06-19
- HARMONY PLACE PRUD PHASES 1-5, Layton: UTR374005, issued 2021-02-18
- BEACON HILL PLAT G PHASES 1, 2, AND 4, Highland: UTR376217, issued 2020-07-16
- DEERFIELD COVE, Provo: UTR378967, issued 2021-02-18
- LA RINGHIERA, PHASES A, B, AND C, Lehi: UTR379641, issued 2024-03-13
- RIDGVIEW TOWNHOMES PHASE 1-3, Lehi: UTR379771, issued 2025-03-11
- RESIDENCES IN THE BURKE SPRINGS SUBDIVISION, Washington: UTR380029, issued 2020-04-03
- PERGRINE POINTE PHASE 4A, 4B, AND 4C, Hurricane: UTR380067, issued 2020-04-06
- RESIDENCES IN THE PERRY LANDING SUBDIVISION, Washington: UTR380085, issued 2020-04-03
Coverages issued nearest UTR384135
- 2024-01-16: 1115 EAGLENEST DR, Woodland Hills: UTRH07467, held by Eaglenest Development LLC
- 2024-01-17: RESERVE AT SKY RANCH, Herriman: UTRC06261, held by Freiss Development
- 2024-01-17: ROBERT SHAW SUBDIVISION, Elwood: UTRC08171, held by Grover Excavation
- 2024-01-17: CITIZENS WEST 2/3, Salt Lake City: UTRC08172, held by Bonneville Builders
- 2024-01-17: 1309 S 3200 W ZAK - SFD, Logan: UTRH07487, held by Zak Loosle
- 2024-01-18: WASHINGTON COUNTY LANDFILL PHASE 5B EXPANSION, Washington: UTRC08175, held by Brown Brothers Construction
- 2024-01-18: TRAILHEAD CONDO RESORT, Richfield: UTRC08176, held by Todd Riches
- 2024-01-18: WELLS CROSSING, Grantsville: UTRC08179, held by Richmond American Homes
- 2024-01-18: MUEHLMANN RESIDENCE, Lehi: UTRH07490, held by Michael Muehlmann
- 2024-01-19: FRONTIER PHASE 2 LOTS 22-26, Washington: UTRC08183, held by Dennett Construction INC
THE RESERVE PHASES 4-6 among its neighbors
24 discharge permits are in the Bates Canyon-Frontal Great Salt Lake subwatershed (HUC 160203040403); UTR384135 is one.
Other permits in the Bates Canyon-Frontal Great Salt Lake subwatershed (HUC 160203040403)
- COYOTE PIT, Tooele: UTR294883, minor, term to 2023-12-31
- ECHO SUBDIVISION PHASES 4-6, Erda: UTRC13195, minor, term to 2027-07-12
- ERDA ASPHALT PLANT, Erda: UTR000830, minor, term to 2016-12-31
- ERDA PIT, Erda: UTRI00018, minor, term to 2023-12-31
- HERITAGE ACRES SUBDIVISION, Tooele: UTRC03839, minor, term to 2022-11-10
- I-80; EB AUXILIARY LANE AND SR-36 NB LANE, Tooele: UTRC11041, minor, term to 2026-06-08
- LEGACY ESTATES SUBDIVISION, Stansbury Park: UTRC01994, minor, term to 2022-01-26
- MAJESTIC VIEW SUBDIVISION, Erda: UTRC10576, minor, term to 2026-03-30
- MAJESTIC VIEW SUBDIVISION 109, 110, 112, 113, 121, AND 122, Erda: UTRC12774, minor, term to 2027-05-03
- MAPLEWOOD LANE, Tooele: UTR397969, minor, term to 2023-12-06
What stands out
- Its term runs 363 days, January 18, 2024 to January 15, 2025; the term ended 637 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on September 28, 2026, 16 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE RESERVE PHASES 4-6 |
|---|---|
| Permittee | Perry Homes |
| NPDES ID | UTR384135 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 18, 2024 |
| Expires | January 15, 2025 |
| Agency | UTDEQ |
| Address | Tooele, UT 84074 |
| Subwatershed | Bates Canyon-Frontal Great Salt Lake (HUC 160203040403) |
NPDES UTR384135: effluent limits and exceedances
THE RESERVE PHASES 4-6 (NPDES UTR384135): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTR384135: no pollutant row on file.
NPDES UTR384135: inspections, violations and enforcement
NPDES UTR384135: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| September 28, 2026 | Reconnaissance without Sampling | S |
NPDES UTR384135 (THE RESERVE PHASES 4-6): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES UTR384135
NPDES UTR384135: one email when its EPA record changes — $99/month.
Permits near NPDES UTR384135
NPDES UTR384135: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.