Velarion Records
Free: one email when NPDES UTRC08183 changes. Unsubscribe any time.

NPDES UTRC08183 · Clean Water Act

FRONTIER PHASE 2 LOTS 22-26, Washington, UT: NPDES UTRC08183 discharge permit, effluent exceedances, inspections, penalties

FRONTIER PHASE 2 LOTS 22-26, Washington, Utah: General permit coverage UTRC08183, held by Dennett Construction INC; Construction stormwater; Effective; issued January 19, 2024, term to January 18, 2025, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 6,589 were issued before UTRC08183.

Coverages issued nearest UTRC08183

FRONTIER PHASE 2 LOTS 22-26 among its neighbors

214 discharge permits are in the Cottonwood Wash-Virgin River subwatershed (HUC 150100080909); UTRC08183 is one.

Other permits in the Cottonwood Wash-Virgin River subwatershed (HUC 150100080909)

Identity

FacilityFRONTIER PHASE 2 LOTS 22-26
PermitteeDennett Construction INC
NPDES IDUTRC08183
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJanuary 19, 2024
ExpiresJanuary 18, 2025
AgencyUTDEQ
AddressWashington, UT 84780
Receiving water impaired303(D) Listed
SubwatershedCottonwood Wash-Virgin River (HUC 150100080909)

NPDES UTRC08183: effluent limits and exceedances

FRONTIER PHASE 2 LOTS 22-26 (NPDES UTRC08183): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC08183: no pollutant row on file.

NPDES UTRC08183: inspections, violations and enforcement

NPDES UTRC08183 (FRONTIER PHASE 2 LOTS 22-26): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC08183

NPDES UTRC08183: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC08183

NPDES UTRC08183: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.