NPDES UTRC01441 · Clean Water Act
VARANO VISTAS, St. George, UT: NPDES UTRC01441 discharge permit, effluent exceedances, inspections, penalties
VARANO VISTAS, St. George, Utah: General permit coverage UTRC01441, held by Kolby Ence; Construction stormwater; Effective; issued October 14, 2024, term to October 14, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,897 were issued before UTRC01441. Kolby Ence holds 6 permits in Utah.
Other permits held by Kolby Ence
- SUGAR PLUM PHASES 1, 2, 4, 5, & 6, Washington: UTR374143, issued 2019-06-29
- WHITE SANDS, St. George: UTR386953, issued 2019-06-06
- ARROYO PHASE 6 (LOTS 96-114 & 123-166), ARROYO PHASE 8 (196-223), Washington: UTR392267, issued 2020-03-27
- POCKET MESA, St. George: UTR392423, issued 2024-05-06
- ASPEN ESTATES, St. George: UTR395397, issued 2019-08-13
Coverages issued nearest UTRC01441
- 2024-10-11: HIMOFF RESIDENCE, Park City: UTRH07298, held by Landmarks West
- 2024-10-11: CLAYTON AND JULIE HOUSLEY HOME, North Logan: UTRH08731, held by Vista Homes
- 2024-10-11: MCINTIRE RESIDENCE, Hideout: UTRH08733, held by McNulty Construction
- 2024-10-11: GOLDEN EAGLE 79, Hideout: UTRH08737, held by Landmarks West
- 2024-10-11: GREEN VALLEY PHASE 5 LOT 13,14, St. George: UTRH08740, held by CAPLIN CUSTOM HOMES
- 2024-10-14: RED TRAILS, Washington: UTRC03757, held by Ence Construction
- 2024-10-14: NORTH POINT SUBDIVISION, Brigham City: UTRC06050, held by Visionary Homes
- 2024-10-14: PARRISH CREEK YARD A, Centerville: UTRC07725, held by Tom Stuart Construction
- 2024-10-14: NICHOLS RESIDENCE, Pleasant Grove: UTRC09711, held by Silver Fox Construction
- 2024-10-14: WASHINGTON DAM INDUSTRIAL #6, Washington: UTRC09721, held by Roxon Homes LLC
VARANO VISTAS among its neighbors
115 discharge permits are in the Cove Wash-Santa Clara River subwatershed (HUC 150100080809); UTRC01441 is one.
Other permits in the Cove Wash-Santa Clara River subwatershed (HUC 150100080809)
- 1240 VALLEY PARK DR, Santa Clara: UTRH10728, minor, term to 2026-12-07
- 698 ST GEORGE, St. George: UTRC04863, minor, term to 2023-04-18
- 7 BREW ST. GEORGE (SUNSET), St. George: UTRC12985, minor, term to 2027-06-14
- ASCESA, St. George: UTRC07298, minor, term to 2024-07-24
- ASCESA AT DIVARIO, St. George: UTRC04973, minor, term to 2023-05-03
- ASCESA COURT, St. George: UTRC10128, minor, term to 2026-01-13
- ASCESA COURT BUILDING #8, St. George: UTRC07181, minor, term to 2024-07-04
- BECCO CREEK, St. George: UTRC06814, minor, term to 2026-05-02
- BEEBE SOUTHGATE HILLS DR, St. George: UTRH00945, minor, term to 2021-08-03
- BLACK HILL TRAIL, St. George: UTRL00600
Identity
| Facility | VARANO VISTAS |
|---|---|
| Permittee | Kolby Ence |
| NPDES ID | UTRC01441 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 14, 2024 |
| Expires | October 14, 2025 |
| Agency | UTDEQ |
| Address | St. George, UT 84770 |
| Subwatershed | Cove Wash-Santa Clara River (HUC 150100080809) |
NPDES UTRC01441: effluent limits and exceedances
VARANO VISTAS (NPDES UTRC01441): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC01441: no pollutant row on file.
NPDES UTRC01441: inspections, violations and enforcement
NPDES UTRC01441 (VARANO VISTAS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC01441
NPDES UTRC01441: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC01441
NPDES UTRC01441: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.