NPDES UTRC02937 · Clean Water Act
EAGLE POINTE PHASE 20, North Salt Lake, UT: NPDES UTRC02937 discharge permit, effluent exceedances, inspections, penalties
EAGLE POINTE PHASE 20, North Salt Lake, Utah: General permit coverage UTRC02937, held by Rock Images; Construction stormwater; Administratively continued; issued June 9, 2021, term to June 8, 2022, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 2,178 were issued before UTRC02937.
Coverages issued nearest UTRC02937
- 2021-06-08: ASHWORTH SWPPP, Midway: UTRH03208, held by Kevin Brooks
- 2021-06-09: WOODWARD PARK, Park City: UTRC00388, held by Jacobsen Construction
- 2021-06-09: PEAK MEADOWS, American Fork: UTRC00700, held by Sunset Mountain Machinery
- 2021-06-09: THE EXCHANGE AT 140TH BUILDING C, Draper: UTRC02934, held by SIRQ, Inc.
- 2021-06-09: SPANISH SPRINGS LOT 2, Spanish Fork: UTRC02936, held by Tom Stuart Construction
- 2021-06-09: WOODS CROSS LOT 3 - 301 SS EQUITIES/MADDOX, Woods Cross: UTRC02938, held by One West Construction
- 2021-06-09: TURNER HAVEN, Sandy: UTRC02944, held by Axe Construction
- 2021-06-09: ANTELOPES’S EDGE, Syracuse: UTRC02945, held by Antelopes’s Edge LLC
- 2021-06-09: HM15, North Logan: UTRH03213, held by Immaculate Construction
- 2021-06-09: LOT 140 - NIELSON, West Bountiful: UTRH03218, held by SI Builders, LLC
EAGLE POINTE PHASE 20 among its neighbors
14 discharge permits are in the Provo Deer Creek subwatershed (HUC 160202030501); UTRC02937 is one.
Other permits in the Provo Deer Creek subwatershed (HUC 160202030501)
- ALPLA INC., Salt Lake City: UTNX00229, minor, term to 2024-11-06
- BALCHEM CORPORATION, Salt Lake City: UTNX00188, minor, term to 2024-06-25
- CM WATER SYSTEM IMPROVEMENTS, Provo: UTRC00611, minor, term to 2023-06-08
- L3 TECHNOLOGIES, INC. - PACIFIC LANDING, Salt Lake City: UTNX00120, minor, term to 2023-09-14
- MIT R&D PARK, Salt Lake City: UTRC09894, minor, term to 2025-11-13
- MIT R&D PARK, West Valley City: UTRC12199, minor, term to 2027-01-22
- SILOS L1HTC, Salt Lake City: UTRC07591, minor, term to 2025-09-16
- SILOS PARK LANE, Salt Lake City: UTRC08358, minor, term to 2025-02-25
- SILOS PARK LANE (A), Salt Lake City: UTRC09054, minor, term to 2025-06-19
- THE BOEING COMPANY-NORTHPORT LOCATION, Salt Lake City: UTNX00192
What stands out
- Its term runs 364 days, June 9, 2021 to June 8, 2022; the term ended 1,560 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | EAGLE POINTE PHASE 20 |
|---|---|
| Permittee | Rock Images |
| NPDES ID | UTRC02937 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 9, 2021 |
| Expires | June 8, 2022 |
| Agency | UTDEQ |
| Address | North Salt Lake, UT 84054 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Provo Deer Creek (HUC 160202030501) |
NPDES UTRC02937: effluent limits and exceedances
EAGLE POINTE PHASE 20 (NPDES UTRC02937): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC02937: no pollutant row on file.
NPDES UTRC02937: inspections, violations and enforcement
NPDES UTRC02937 (EAGLE POINTE PHASE 20): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC02937
NPDES UTRC02937: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC02937
NPDES UTRC02937: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.