Velarion Records
Free: one email when NPDES UTRH03208 changes. Unsubscribe any time.

NPDES UTRH03208 · Clean Water Act

ASHWORTH SWPPP, Midway, UT: NPDES UTRH03208 discharge permit, effluent exceedances, inspections, penalties

ASHWORTH SWPPP, Midway, Utah: General permit coverage UTRH03208, held by Kevin Brooks; Construction stormwater; Administratively continued; issued June 8, 2021, term to June 7, 2022, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 2,167 were issued before UTRH03208. Kevin Brooks holds 3 permits in Utah.

Other permits held by Kevin Brooks

Coverages issued nearest UTRH03208

  • 2021-06-08: PINNACLE 15, Park City: UTRH02830, held by Richard W Milne
  • 2021-06-08: BANDED HILLS LOT 4, St. George: UTRH03192, held by Richardson Brothers Custom Homes
  • 2021-06-08: LH33, Smithfield: UTRH03195, held by Immaculate Construction
  • 2021-06-08: LH37, Smithfield: UTRH03199, held by Immaculate Construction
  • 2021-06-08: RUSSELL SWPPP, Midway: UTRH03207, held by Kevin Brooks
  • 2021-06-09: WOODWARD PARK, Park City: UTRC00388, held by Jacobsen Construction
  • 2021-06-09: PEAK MEADOWS, American Fork: UTRC00700, held by Sunset Mountain Machinery
  • 2021-06-09: THE EXCHANGE AT 140TH BUILDING C, Draper: UTRC02934, held by SIRQ, Inc.
  • 2021-06-09: SPANISH SPRINGS LOT 2, Spanish Fork: UTRC02936, held by Tom Stuart Construction
  • 2021-06-09: EAGLE POINTE PHASE 20, North Salt Lake: UTRC02937, held by Rock Images

ASHWORTH SWPPP among its neighbors

26 discharge permits are in the Snake Creek subwatershed (HUC 160202030305); UTRH03208 is one.

Other permits in the Snake Creek subwatershed (HUC 160202030305)

What stands out

  • Its term runs 364 days, June 8, 2021 to June 7, 2022; the term ended 1,561 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • No event of any of the four kinds is dated in the 365 days before EPA's file was loaded on September 15, 2026.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityASHWORTH SWPPP
PermitteeKevin Brooks
NPDES IDUTRH03208
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJune 8, 2021
ExpiresJune 7, 2022
AgencyUTDEQ
AddressMidway, UT 84049
Receiving water impaired303(D) Listed
SubwatershedSnake Creek (HUC 160202030305)

NPDES UTRH03208: effluent limits and exceedances

ASHWORTH SWPPP (NPDES UTRH03208): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRH03208: no pollutant row on file.

NPDES UTRH03208: inspections, violations and enforcement

NPDES UTRH03208 (ASHWORTH SWPPP): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRH03208

NPDES UTRH03208: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRH03208

NPDES UTRH03208: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.