Velarion Records
Free: one email when NPDES UTRC04909 changes. Unsubscribe any time.

NPDES UTRC04909 · Clean Water Act

ARROWHEAD SPRINGS PHASES 4-6, Salem, UT: NPDES UTRC04909 discharge permit, effluent exceedances, inspections, penalties

ARROWHEAD SPRINGS PHASES 4-6, Salem, Utah: General permit coverage UTRC04909, held by Rino Excavating; Construction stormwater; Administratively continued; issued April 26, 2022, term to April 25, 2023, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 3,842 were issued before UTRC04909. Rino Excavating holds 20 permits in Utah.

Other permits held by Rino Excavating

Coverages issued nearest UTRC04909

ARROWHEAD SPRINGS PHASES 4-6 among its neighbors

400 discharge permits are in the Beer Creek subwatershed (HUC 160202020603); UTRC04909 is one.

Other permits in the Beer Creek subwatershed (HUC 160202020603)

Identity

FacilityARROWHEAD SPRINGS PHASES 4-6
PermitteeRino Excavating
NPDES IDUTRC04909
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedApril 26, 2022
ExpiresApril 25, 2023
AgencyUTDEQ
AddressSalem, UT 84653
Receiving water impaired303(D) Listed
SubwatershedBeer Creek (HUC 160202020603)

NPDES UTRC04909: effluent limits and exceedances

ARROWHEAD SPRINGS PHASES 4-6 (NPDES UTRC04909): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC04909: no pollutant row on file.

NPDES UTRC04909: inspections, violations and enforcement

NPDES UTRC04909 (ARROWHEAD SPRINGS PHASES 4-6): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC04909

NPDES UTRC04909: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC04909

NPDES UTRC04909: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.