NPDES UTRH05135 · Clean Water Act
ROBERTS HOOPER 4512 W 5500 S HOOPER, UTAH 84315, Hooper, UT: NPDES UTRH05135 discharge permit, effluent exceedances, inspections, penalties
ROBERTS HOOPER 4512 W 5500 S HOOPER, UTAH 84315, Hooper, Utah: General permit coverage UTRH05135, held by Kyle Roberts; Construction stormwater; Administratively continued; issued April 25, 2022, term to April 24, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 3,833 were issued before UTRH05135.
Coverages issued nearest UTRH05135
- 2022-04-25: TAGG N GO CARWASH - LEHI, Lehi: UTRC04904, held by Ace-High Builders
- 2022-04-25: RIVER VIEW, Saratoga Springs: UTRC04907, held by Bruder Inc
- 2022-04-25: KEMRY PLACE, Sandy: UTRC04908, held by Daniel Romero
- 2022-04-25: SUMMIT LOT 20, Park City: UTRH05127, held by Germania Construction
- 2022-04-25: LANCASTER, Santa Clara: UTRH05129, held by RGC Construction
- 2022-04-26: MAPLE HILLS ESTATES, Mapleton: UTRC02683, held by Sunset Mountain Machinery
- 2022-04-26: ICEBERG DRIVE INN - CANYON GATE, Spanish Fork: UTRC04880, held by Keller Construction
- 2022-04-26: ARROWHEAD SPRINGS PHASES 4-6, Salem: UTRC04909, held by Rino Excavating
- 2022-04-26: SHORELINE VIEW SUBDIVISION, Syracuse: UTRC04912, held by RJT Excavating
- 2022-04-26: SMITH RESIDENCE - SANTA CLARA HEIGHTS, PHASE P, LOT 20, Santa Clara: UTRH05138, held by Echelon Contracting
ROBERTS HOOPER 4512 W 5500 S HOOPER, UTAH 84315 among its neighbors
117 discharge permits are in the Howard Slough-Frontal Farmington Bay subwatershed (HUC 160201020506); UTRH05135 is one.
Other permits in the Howard Slough-Frontal Farmington Bay subwatershed (HUC 160201020506)
- 103 HARRISBURG COUNTRY ESTATES, Clinton: UTRH09416, minor, term to 2026-03-23
- 107 HARRISBURG COUNTRY ESTATES, Clinton: UTRH10083, minor, term to 2026-07-30
- 1300 NORTH - MAIN STREET TO 1285 WEST WATERLINE, Clinton: UTRC05467, minor, term to 2023-07-28
- 1681 N 3000 W, Clinton: UTRH01321, minor, term to 2021-09-16
- 1800 N GATE PACKAGE 1 & 2, Hill Afb: UTRC12986, minor, term to 2027-06-09
- 2093-3091 W 5600 S DEMO'S, Roy: UTRC06224, minor, term to 2025-01-05
- 4000 S SRTS RAIL CROSSING, Roy: UTRC12424, minor, term to 2027-03-09
- 44 RIVER CROSSINGS, Plain City: UTRH01041, minor, term to 2021-08-14
- 92-R HARRISBURG, Clinton: UTRH01576, minor, term to 2021-10-25
- 93-R HARRISBURG, Clinton: UTRH09020, minor, term to 2025-12-28
Identity
| Facility | ROBERTS HOOPER 4512 W 5500 S HOOPER, UTAH 84315 |
|---|---|
| Permittee | Kyle Roberts |
| NPDES ID | UTRH05135 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 25, 2022 |
| Expires | April 24, 2023 |
| Agency | UTDEQ |
| Address | Hooper, UT 84315 |
| Subwatershed | Howard Slough-Frontal Farmington Bay (HUC 160201020506) |
NPDES UTRH05135: effluent limits and exceedances
ROBERTS HOOPER 4512 W 5500 S HOOPER, UTAH 84315 (NPDES UTRH05135): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH05135: no pollutant row on file.
NPDES UTRH05135: inspections, violations and enforcement
NPDES UTRH05135 (ROBERTS HOOPER 4512 W 5500 S HOOPER, UTAH 84315): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH05135
NPDES UTRH05135: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH05135
NPDES UTRH05135: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.