NPDES UTRC06859 · Clean Water Act
QUEENS RIDGE PHASE 2 & 3, Washington, UT: NPDES UTRC06859 discharge permit, effluent exceedances, inspections, penalties
QUEENS RIDGE PHASE 2 & 3, Washington, Utah: General permit coverage UTRC06859, held by New Trend Construction; Construction stormwater; Effective; issued May 10, 2023, term to May 9, 2024, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 5,546 were issued before UTRC06859. New Trend Construction holds 12 permits in Utah.
Other permits held by New Trend Construction
- RESERVE AT RIVER HOLLOW LOT 34, St. George: UTG072116, issued 2026-03-27
- NORTHGATE PEAKS PHASE 4, St. George: UTRC01104, issued 2020-08-25
- CRIMSON FIELDS PHASE 4 & 5, Washington: UTRC02196, issued 2021-03-01
- MOORLAND PARK PHASE 3, St. George: UTRC04740, issued 2022-04-03
- THE ARBORS PHASE 12, St. George: UTRC04741, issued 2022-04-03
- PINE VIEW COMMERCIAL CENTER LOT 9, St. George: UTRC06375, issued 2023-02-12
- MAJESTIC FIELDS, Washington: UTRC07490, issued 2023-08-27
- ESTATES @ BURKE SPRINGS PHASE 2, Washington: UTRC08252, issued 2024-02-04
- FINLEY FARMS PHASES 1B, 2 & 4, Washington: UTRC11103, issued 2025-06-19
- BURKE SPRINGS PH. 3, Washington: UTRC11687, issued 2025-09-29
Coverages issued nearest UTRC06859
- 2023-05-09: 14 FENSTER FARM, Warren: UTRH06582, held by Jared Clark Construction
- 2023-05-09: EMMER RESIDENCE, Park City: UTRH06585, held by Trent Andersen
- 2023-05-10: BRINGHURST STATION, Bluffdale: UTR393853, held by EDGEhomes
- 2023-05-10: MIDTOWN VILLAGE - HORIZONTAL, Ogden: UTRC02899, held by Next Construction
- 2023-05-10: 7026-518 GRANTSVILLE WALMART DISTRIBUTION CENTER, Grantsville: UTRC06858, held by Rabine America
- 2023-05-10: WINDY RIVER LOT 4, Riverton: UTRH06589, held by Arrow Ridge Homes
- 2023-05-12: QUIET VALLEY, Spanish Fork: UTRC02921, held by DR Horton
- 2023-05-12: LOT 86R, Eden: UTRH05211, held by Pamela Russell
- 2023-05-12: MACDONALD RESIDENCE, Mapleton: UTRH06598, held by Scot M. Jones
- 2023-05-12: LOT 120 WINSTON PARK, West Haven: UTRH06599, held by Spencer Stephens
QUEENS RIDGE PHASE 2 & 3 among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRC06859 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
What stands out
- Its term runs 365 days, May 10, 2023 to May 9, 2024; the term ended 859 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | QUEENS RIDGE PHASE 2 & 3 |
|---|---|
| Permittee | New Trend Construction |
| NPDES ID | UTRC06859 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 10, 2023 |
| Expires | May 9, 2024 |
| Agency | UTDEQ |
| Address | Washington, UT 84780 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRC06859: effluent limits and exceedances
QUEENS RIDGE PHASE 2 & 3 (NPDES UTRC06859): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC06859: no pollutant row on file.
NPDES UTRC06859: inspections, violations and enforcement
NPDES UTRC06859 (QUEENS RIDGE PHASE 2 & 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC06859
NPDES UTRC06859: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC06859
NPDES UTRC06859: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.