NPDES UTRC08252 · Clean Water Act
ESTATES @ BURKE SPRINGS PHASE 2, Washington, UT: NPDES UTRC08252 discharge permit, effluent exceedances, inspections, penalties
ESTATES @ BURKE SPRINGS PHASE 2, Washington, Utah: General permit coverage UTRC08252, held by New Trend Construction; Construction stormwater; Effective; issued February 4, 2024, term to February 3, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 6,640 were issued before UTRC08252. New Trend Construction holds 12 permits in Utah.
Other permits held by New Trend Construction
- RESERVE AT RIVER HOLLOW LOT 34, St. George: UTG072116, issued 2026-03-27
- NORTHGATE PEAKS PHASE 4, St. George: UTRC01104, issued 2020-08-25
- CRIMSON FIELDS PHASE 4 & 5, Washington: UTRC02196, issued 2021-03-01
- MOORLAND PARK PHASE 3, St. George: UTRC04740, issued 2022-04-03
- THE ARBORS PHASE 12, St. George: UTRC04741, issued 2022-04-03
- PINE VIEW COMMERCIAL CENTER LOT 9, St. George: UTRC06375, issued 2023-02-12
- QUEENS RIDGE PHASE 2 & 3, Washington: UTRC06859, issued 2023-05-10
- MAJESTIC FIELDS, Washington: UTRC07490, issued 2023-08-27
- FINLEY FARMS PHASES 1B, 2 & 4, Washington: UTRC11103, issued 2025-06-19
- BURKE SPRINGS PH. 3, Washington: UTRC11687, issued 2025-09-29
Coverages issued nearest UTRC08252
- 2024-02-01: BLUFFDALE MEDICAL OFFICE, Bluffdale: UTRC08248, held by Somerset Construction LLC
- 2024-02-02: HILL CREST AT THE LEDGES, St. George: UTRC04247, held by The Ledges at Snow Canyon LLC
- 2024-02-02: GRANARY APARTMENTS, Salt Lake City: UTRC06151, held by Roers Pentalon Joint Venture, LLC
- 2024-02-02: FL007 PIPELINE RELOCATION PROJECT, Draper: UTRC08250, held by Questar Gas Company dba Enbridge Gas Utah
- 2024-02-02: QUAIL RIDGE LOT 4, Bluffdale: UTRH07539, held by Construct Builders
- 2024-02-05: DEVON II, Orem: UTRC04348, held by Ivory Commercial
- 2024-02-05: 13000 S MVC CRUSHING SITE, Herriman: UTRC08254, held by RLW/Clyde a Joint Venture
- 2024-02-05: RICKS RESIDENCE - LOT 2 SUMMIT POINTE PLAT A, Alpine: UTRC08258, held by Raykon Construction
- 2024-02-05: TALON ADAMS, Paradise: UTRH07542, held by Talon Adams
- 2024-02-05: BUHRMANN RESIDENCE, Kamas: UTRH07545, held by Big-D Signature
ESTATES @ BURKE SPRINGS PHASE 2 among its neighbors
214 discharge permits are in the Cottonwood Wash-Virgin River subwatershed (HUC 150100080909); UTRC08252 is one.
Other permits in the Cottonwood Wash-Virgin River subwatershed (HUC 150100080909)
- 1837 E SCENIC VIEW CIRCLE, WASHINGTON UTAH 84780, Washington: UTRH01574, minor, term to 2021-10-23
- 1840 E SCENIC VIEW CIRCLE WASHINGTON UT 84780, Washington: UTRC01480, minor, term to 2021-10-21
- 2645 EAST WASHINGTON DAM ROAD, St. George: UTRC00868, minor, term to 2021-07-21
- 321 N OLD HWY 91, Hurricane: UTRI00229, minor, term to 2023-12-31
- 5 PAINTED HILLS @ RLINGTON HEIGHTS, Hurricane: UTRH04046, minor, term to 2022-10-13
- 90TH NORTH ROADWAY, Hurricane: UTRC12859, minor, term to 2027-05-19
- AMARA AT CORAL CANYON, Washington: UTRC12979, minor, term to 2027-06-08
- ARROYO AT SIENNA HILLS PHASE 4&5, Washington: UTR392695, minor, term to 2021-04-18
- ARROYO AT SIENNA HILLS PHASE 7, Washington: UTR396861, minor, term to 2020-10-17
- ARROYO PHASE 6 (LOTS 96-114 & 123-166), ARROYO PHASE 8 (196-223), Washington: UTR392267, minor, term to 2021-03-29
Identity
| Facility | ESTATES @ BURKE SPRINGS PHASE 2 |
|---|---|
| Permittee | New Trend Construction |
| NPDES ID | UTRC08252 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 4, 2024 |
| Expires | February 3, 2025 |
| Agency | UTDEQ |
| Address | Washington, UT 84780 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Cottonwood Wash-Virgin River (HUC 150100080909) |
NPDES UTRC08252: effluent limits and exceedances
ESTATES @ BURKE SPRINGS PHASE 2 (NPDES UTRC08252): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC08252: no pollutant row on file.
NPDES UTRC08252: inspections, violations and enforcement
NPDES UTRC08252 (ESTATES @ BURKE SPRINGS PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC08252
NPDES UTRC08252: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC08252
NPDES UTRC08252: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.