NPDES UTRC09791 · Clean Water Act
MOUNTAIN GATE PHASE 5D - VERTICAL, Hyde Park, UT: NPDES UTRC09791 discharge permit, effluent exceedances, inspections, penalties
MOUNTAIN GATE PHASE 5D - VERTICAL, Hyde Park, Utah: General permit coverage UTRC09791, held by Sierra Homebuilders, LLC; Construction stormwater; Effective; issued October 25, 2024, term to October 24, 2025, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 7,978 were issued before UTRC09791. Sierra Homebuilders, LLC holds 15 permits in Utah.
Other permits held by Sierra Homebuilders, LLC
- COTTONWOOD LANDING - VERTICAL, Elwood: UTRC03778, issued 2022-11-02
- HARVEST ACRES - VERTICAL, Tremonton: UTRC03905, issued 2024-10-23
- SUNSET RIDGES - VERTICAL, Smithfield: UTRC08347, issued 2025-01-22
- TERAKEE - THE BARN - VERTICAL, Ogden: UTRC10218, issued 2025-01-31
- ESTATES AT RIVER VIEW (ELWOOD) - VERTICAL, Elwood: UTRC10681, issued 2025-04-14
- SMITHFIELD CREST - VERTICAL, Smithfield: UTRC11109, issued 2025-06-19
- RIVER VALLEY PHASE 10 - VERTICAL, Tremonton: UTRC12147, issued 2026-01-13
- VILLAGE AT THE GARDENS - VERTICAL, Ogden: UTRC12499, issued 2026-03-19
- CARDAMINE VILLAGE - VERTICAL, Brigham City: UTRC13007, issued 2026-06-12
- EAST HAVEN - VERTICAL, North Logan: UTRC13107, issued 2026-06-29
Coverages issued nearest UTRC09791
- 2024-10-24: CINEPOINTE 6 THEATER, Ogden: UTRC09781, held by Diamond Tree Experts
- 2024-10-24: PACIFIC STEEL SYRACUSE LEVELING LINE, Syracuse: UTRC09782, held by Dawson Development
- 2024-10-24: SNOW CANYON RESTROOM & PARKING ADDITION, Ivins: UTRC09786, held by Harward & Rees
- 2024-10-24: SCHMITT RESIDENCE, Washington: UTRH08801, held by Cody and Chandra Schmitt
- 2024-10-25: MAPLE MOUNTAIN, Spanish Fork: UTRC09787, held by Salisbury Homes
- 2024-10-28: TELEGRAPH EXCHANGE, Salt Lake City: UTRC03575, held by Clearwater Homes
- 2024-10-28: SLCDPU NEW WRF PROJECT, Salt Lake City: UTRC03715, held by Sundt/PCL A Joint Venture
- 2024-10-28: LEHI SANCTUARY, Lehi: UTRC03892, held by Rimrock Construction
- 2024-10-28: NORTH TEMPLE LANDFILL/AIRPORT WEST VOLUNTARY CLEANUP PROGRAM SITE, Salt Lake City: UTRC05998, held by NT Development
- 2024-10-28: THE VILLAS @ LAVA KNOLLS BLDG 1, 2, 7 & 8, Hurricane: UTRC06096, held by Interstate Homes, LLC
MOUNTAIN GATE PHASE 5D - VERTICAL among its neighbors
185 discharge permits are in the Hopkins Slough subwatershed (HUC 160102020702); UTRC09791 is one.
Other permits in the Hopkins Slough subwatershed (HUC 160102020702)
- 101 MTN GATE, Hyde Park: UTRH04429, minor, term to 2022-12-26
- 1030 EAST 612 SOUTH, Smithfield: UTRH06622, minor, term to 2024-05-16
- 1185 E 2560 N, North Logan: UTRH06734, minor, term to 2024-06-14
- 1200 EAST ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09446, minor, term to 2025-08-25
- 2600 N EXTENSION, North Logan: UTRL00556
- 2850 NORTH LOGAN, North Logan: UTRC13138, minor, term to 2027-07-01
- 2850 NORTH ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09380, minor, term to 2025-08-12
- 3100 NORTH ROADWAY, Hyde Park: UTRC00148, minor, term to 2021-03-17
- 3100 NORTH ROADWAY 1200 EAST TO 1600 EAST, North Logan: UTRC00813, minor, term to 2021-07-13
- 3300 HYDE PARK, Hyde Park: UTRC05622, minor, term to 2026-08-14
What stands out
- Its term runs 364 days, October 25, 2024 to October 24, 2025; the term ended 355 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | MOUNTAIN GATE PHASE 5D - VERTICAL |
|---|---|
| Permittee | Sierra Homebuilders, LLC |
| NPDES ID | UTRC09791 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 25, 2024 |
| Expires | October 24, 2025 |
| Agency | UTDEQ |
| Address | Hyde Park, UT 84318 |
| Subwatershed | Hopkins Slough (HUC 160102020702) |
NPDES UTRC09791: effluent limits and exceedances
MOUNTAIN GATE PHASE 5D - VERTICAL (NPDES UTRC09791): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC09791: no pollutant row on file.
NPDES UTRC09791: inspections, violations and enforcement
NPDES UTRC09791 (MOUNTAIN GATE PHASE 5D - VERTICAL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC09791
NPDES UTRC09791: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC09791
NPDES UTRC09791: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.