NPDES UTRC10448 · Clean Water Act
GROUSE CREEK BRIDGE REPLACEMENT, Grouse Creek, UT: NPDES UTRC10448 discharge permit, effluent exceedances, inspections, penalties
GROUSE CREEK BRIDGE REPLACEMENT, Grouse Creek, Utah: General permit coverage UTRC10448, held by MIchael Davies; Construction stormwater; Administratively continued; issued March 11, 2025, term to March 10, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 8,785 were issued before UTRC10448.
Coverages issued nearest UTRC10448
- 2025-03-11: STAGECOACH ESTATES, Ogden: UTRC08580, held by McArthur Homes
- 2025-03-11: I-15; 1800 NORTH INTERCHANGE & CORRIDOR WIDENING, Sunset: UTRC10440, held by RLW/Whitaker, a Joint Venture
- 2025-03-11: COLEMAN VU, Riverdale: UTRC10441, held by Alpine Homes LLC
- 2025-03-11: TAYLOR LANDING PHASE 1B, West Haven: UTRC10442, held by Next Construction
- 2025-03-11: JUNIPER TRAILS 32, Hyde Park: UTRC10446, held by Brandon Merritt
- 2025-03-12: THE RIDGE, Saratoga Springs: UTR385489, held by EDGEhomes
- 2025-03-12: HIGHRIDGE, Saratoga Springs: UTRC04679, held by Edge Homes
- 2025-03-12: COMMERCE POINT WEST, St. George: UTRC08360, held by JMI Constructors
- 2025-03-12: AFCU - MASS GRADING PACKAGE, Riverdale: UTRC08420, held by Layton Construction
- 2025-03-12: SERENITY ESTATES, Ivins: UTRC10444, held by S & S Homes
GROUSE CREEK BRIDGE REPLACEMENT among its neighbors
1 discharge permits are in the Rabbit Spring subwatershed (HUC 160203080601); UTRC10448 is one.
What stands out
- Its term runs 364 days, March 11, 2025 to March 10, 2026; the term ended 189 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GROUSE CREEK BRIDGE REPLACEMENT |
|---|---|
| Permittee | MIchael Davies |
| NPDES ID | UTRC10448 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 11, 2025 |
| Expires | March 10, 2026 |
| Agency | UTDEQ |
| Address | Grouse Creek, UT 84313 |
| Subwatershed | Rabbit Spring (HUC 160203080601) |
NPDES UTRC10448: effluent limits and exceedances
GROUSE CREEK BRIDGE REPLACEMENT (NPDES UTRC10448): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC10448: no pollutant row on file.
NPDES UTRC10448: inspections, violations and enforcement
NPDES UTRC10448 (GROUSE CREEK BRIDGE REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC10448
NPDES UTRC10448: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC10448
NPDES UTRC10448: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.