NPDES UTRC10446 · Clean Water Act
JUNIPER TRAILS 32, Hyde Park, UT: NPDES UTRC10446 discharge permit, effluent exceedances, inspections, penalties
JUNIPER TRAILS 32, Hyde Park, Utah: General permit coverage UTRC10446, held by Brandon Merritt; Construction stormwater; Administratively continued; issued March 11, 2025, term to March 10, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 8,785 were issued before UTRC10446. Brandon Merritt holds 2 permits in Utah.
Other permits held by Brandon Merritt
- WEST RIDGE LOT 18, West Haven: UTRC13185, issued 2026-07-09
Coverages issued nearest UTRC10446
- 2025-03-10: VELVAERE E02, Heber City: UTRH09339, held by H2 Homes
- 2025-03-11: STAGECOACH ESTATES, Ogden: UTRC08580, held by McArthur Homes
- 2025-03-11: I-15; 1800 NORTH INTERCHANGE & CORRIDOR WIDENING, Sunset: UTRC10440, held by RLW/Whitaker, a Joint Venture
- 2025-03-11: COLEMAN VU, Riverdale: UTRC10441, held by Alpine Homes LLC
- 2025-03-11: TAYLOR LANDING PHASE 1B, West Haven: UTRC10442, held by Next Construction
- 2025-03-11: GROUSE CREEK BRIDGE REPLACEMENT, Grouse Creek: UTRC10448, held by MIchael Davies
- 2025-03-12: THE RIDGE, Saratoga Springs: UTR385489, held by EDGEhomes
- 2025-03-12: HIGHRIDGE, Saratoga Springs: UTRC04679, held by Edge Homes
- 2025-03-12: COMMERCE POINT WEST, St. George: UTRC08360, held by JMI Constructors
- 2025-03-12: AFCU - MASS GRADING PACKAGE, Riverdale: UTRC08420, held by Layton Construction
JUNIPER TRAILS 32 among its neighbors
185 discharge permits are in the Hopkins Slough subwatershed (HUC 160102020702); UTRC10446 is one.
Other permits in the Hopkins Slough subwatershed (HUC 160102020702)
- 101 MTN GATE, Hyde Park: UTRH04429, minor, term to 2022-12-26
- 1030 EAST 612 SOUTH, Smithfield: UTRH06622, minor, term to 2024-05-16
- 1185 E 2560 N, North Logan: UTRH06734, minor, term to 2024-06-14
- 1200 EAST ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09446, minor, term to 2025-08-25
- 2600 N EXTENSION, North Logan: UTRL00556
- 2850 NORTH LOGAN, North Logan: UTRC13138, minor, term to 2027-07-01
- 2850 NORTH ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09380, minor, term to 2025-08-12
- 3100 NORTH ROADWAY, Hyde Park: UTRC00148, minor, term to 2021-03-17
- 3100 NORTH ROADWAY 1200 EAST TO 1600 EAST, North Logan: UTRC00813, minor, term to 2021-07-13
- 3300 HYDE PARK, Hyde Park: UTRC05622, minor, term to 2026-08-14
What stands out
- Its term runs 364 days, March 11, 2025 to March 10, 2026; the term ended 189 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | JUNIPER TRAILS 32 |
|---|---|
| Permittee | Brandon Merritt |
| NPDES ID | UTRC10446 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 11, 2025 |
| Expires | March 10, 2026 |
| Agency | UTDEQ |
| Address | Hyde Park, UT 84318 |
| Subwatershed | Hopkins Slough (HUC 160102020702) |
NPDES UTRC10446: effluent limits and exceedances
JUNIPER TRAILS 32 (NPDES UTRC10446): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC10446: no pollutant row on file.
NPDES UTRC10446: inspections, violations and enforcement
NPDES UTRC10446 (JUNIPER TRAILS 32): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC10446
NPDES UTRC10446: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC10446
NPDES UTRC10446: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.