Velarion Records
Free: one email when NPDES UTRC10521 changes. Unsubscribe any time.

NPDES UTRC10521 · Clean Water Act

PRIMROSE 1 STAKE CENTER, Saratoga Springs, UT: NPDES UTRC10521 discharge permit, effluent exceedances, inspections, penalties

PRIMROSE 1 STAKE CENTER, Saratoga Springs, Utah: General permit coverage UTRC10521, held by Headwaters Construction; Construction stormwater; Effective; issued March 25, 2025, term to March 24, 2026, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 8,907 were issued before UTRC10521. Headwaters Construction holds 6 permits in Utah.

Other permits held by Headwaters Construction

Coverages issued nearest UTRC10521

PRIMROSE 1 STAKE CENTER among its neighbors

588 discharge permits are in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002); UTRC10521 is one.

Other permits in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002)

Identity

FacilityPRIMROSE 1 STAKE CENTER
PermitteeHeadwaters Construction
NPDES IDUTRC10521
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMarch 25, 2025
ExpiresMarch 24, 2026
AgencyUTDEQ
AddressSaratoga Springs, UT 84045
SubwatershedOutlet Dry Creek-Jordan River (HUC 160202011002)

NPDES UTRC10521: effluent limits and exceedances

PRIMROSE 1 STAKE CENTER (NPDES UTRC10521): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC10521: no pollutant row on file.

NPDES UTRC10521: inspections, violations and enforcement

NPDES UTRC10521 (PRIMROSE 1 STAKE CENTER): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC10521

NPDES UTRC10521: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC10521

NPDES UTRC10521: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.