Clean Water Act discharge permit · NPDES UTRC10534
FL026 PHASE 3, Lehi, UT: NPDES UTRC10534 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
FL026 PHASE 3, held by Questar Gas Company Enbridge Gas Utah, holds NPDES permit UTRC10534. EPA’s file records it issued March 26, 2025 and expiring March 25, 2026. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for FL026 PHASE 3: its NPDES ID, its permit type and status, its dates, its address in Lehi, Utah. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES UTRC10534.
Identity
| Facility as filed | FL026 PHASE 3 |
|---|---|
| Permittee as filed | Questar Gas Company Enbridge Gas Utah |
| NPDES ID | UTRC10534 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | March 26, 2025 |
| Expiration date | March 25, 2026 |
| Issuing agency | UTDEQ |
| Address | Lehi, UT 84043 |
| Subwatershed | Outlet Dry Creek-Jordan River (HUC 160202011002) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES UTRC10534.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES UTRC10534.
Inspections
EPA’s inspection file holds no inspection for NPDES UTRC10534.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES UTRC10534.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, UTRC10534.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID UTRC10534 there.
FL026 PHASE 3, Lehi, Utah: Coverage under a general permit UTRC10534, held by Questar Gas Company Enbridge Gas Utah; Construction stormwater; Effective; issued March 26, 2025, term to March 25, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 8,914 were issued before UTRC10534.
Coverages issued nearest UTRC10534
- 2025-03-25: PRIMROSE 1 STAKE CENTER, Saratoga Springs: UTRC10521, held by Headwaters Construction
- 2025-03-25: PRESRV-3-84, Park City: UTRC10530, held by Aaron Bailey
- 2025-03-25: 2172 N SECOND TRY, North Logan: UTRC10531, held by Logan Brown
- 2025-03-25: KAY-BRAXTON 3741 W ALDER CT, Ogden: UTRH09427, held by Braxton Kay
- 2025-03-25: FARR RESIDENCE, Sandy: UTRH09429, held by Empress Homes LLC
- 2025-03-26: PRINCETON TERRACE, Sandy: UTRC10535, held by Elevation Construction LLC
- 2025-03-26: THE HIGHLANDS COMMERCE CENTER, Francis: UTRC10537, held by Harwood Development
- 2025-03-26: ALVEY TOWNHOMES, Clearfield: UTRC10538, held by Kastlerock Excavation
- 2025-03-26: BELTLINE 07 REPLACEMENT PHASE 3, Salt Lake City: UTRC10540, held by Questar Gas Company dba Enbridge Gas Utah
- 2025-03-26: HOLLADAY PEAKS LOTS 1, 2, & 5-10, Holladay: UTRC10541, held by Ivory Homes
FL026 PHASE 3 among its neighbors
588 discharge permits are in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002); UTRC10534 is one.
Other permits in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002)
- 10267 MOUNTAIN RIDGE (HANSEN), Highland: UTRH05540, minor, term to 2023-07-08
- 10665 N ALPINE HWY, Highland: UTRH00976, minor, term to 2021-08-06
- 10700 COMMERCIAL LOT 43 AND LOT 44, Highland: UTRC13181, minor, term to 2027-07-08
- 1100 WEST 350 SOUTH, American Fork: UTR397831, minor, term to 2020-12-02
- 130 SEASONS EST, Lehi: UTRH07171, minor, term to 2024-10-02
- 200 SERIES MANEUVER REPAIR (FY25), Bluffdale: UTRL00647
- 2022-23 ASD SCHOOL HOUSE, American Fork: UTRC05336, minor, term to 2023-06-26
- 2100 N MVC TO I-15, Lehi: UTRC12155, minor, term to 2027-01-13
- 2100 N MVC TO I-15 EXTERNAL SITES, Lehi: UTRC12174, minor, term to 2027-01-15
- 2645 N CENTER ST, Lehi: UTRH08574, minor, term to 2025-09-09
Nearby on the register
- Discharge permits in Lehi
- Every permit record in Lehi, A to Z
- Discharge permits in Utah
- Every permit record in Utah, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
Of the 256 storm water construction permits in Lehi, 0.0% have a violation recorded against them. FL026 PHASE 3 sits among 588 NPDES permits in the Outlet Dry Creek-Jordan River subwatershed.