NPDES UTRC10680 · Clean Water Act
LANARK SUBDIVISION, Hyde Park, UT: NPDES UTRC10680 discharge permit, effluent exceedances, inspections, penalties
LANARK SUBDIVISION, Hyde Park, Utah: General permit coverage UTRC10680, held by Trueline Contractors; Construction stormwater; Administratively continued; issued April 14, 2025, term to April 13, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 9,061 were issued before UTRC10680.
Coverages issued nearest UTRC10680
- 2025-04-14: ROCKLAND TOWNHOMES, St. George: UTRC08594, held by Colbalt Investments LLC
- 2025-04-14: PROMNTORY SAGE HILLS ESTATES SUBDIVISION, Park City: UTRC08658, held by Promontory HOMES
- 2025-04-14: TEAMWORKS, Logan: UTRC10674, held by KAMBR, LLC
- 2025-04-14: PROVIDENCE HIGHLANDS PHASE 5, Providence: UTRC10675, held by Alpine Excavation/Zack Loveland
- 2025-04-14: NICHOLS RESIDENCE BY WESTLAND RESERVE, Peterson: UTRC10676, held by Westland Reserve
- 2025-04-14: ESTATES AT RIVER VIEW (ELWOOD) - VERTICAL, Elwood: UTRC10681, held by Sierra Homebuilders, LLC
- 2025-04-14: SLCWRF REDWOOD CAMPUS STOREHOUSE, Salt Lake City: UTRC10683, held by Wasatch West Contractors
- 2025-04-14: LOT 107 THE RESERVE, West Valley City: UTRH09552, held by Shupe Builders, LLC.
- 2025-04-14: LOT 8 WEBER VIEW, Pleasant View: UTRH09553, held by C S Construction
- 2025-04-15: PROVO CITY REGIONAL SPORTS PARK, Provo: UTRC00260, held by Provo City Parks and Recreation
LANARK SUBDIVISION among its neighbors
185 discharge permits are in the Hopkins Slough subwatershed (HUC 160102020702); UTRC10680 is one.
Other permits in the Hopkins Slough subwatershed (HUC 160102020702)
- 101 MTN GATE, Hyde Park: UTRH04429, minor, term to 2022-12-26
- 1030 EAST 612 SOUTH, Smithfield: UTRH06622, minor, term to 2024-05-16
- 1185 E 2560 N, North Logan: UTRH06734, minor, term to 2024-06-14
- 1200 EAST ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09446, minor, term to 2025-08-25
- 2600 N EXTENSION, North Logan: UTRL00556
- 2850 NORTH LOGAN, North Logan: UTRC13138, minor, term to 2027-07-01
- 2850 NORTH ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09380, minor, term to 2025-08-12
- 3100 NORTH ROADWAY, Hyde Park: UTRC00148, minor, term to 2021-03-17
- 3100 NORTH ROADWAY 1200 EAST TO 1600 EAST, North Logan: UTRC00813, minor, term to 2021-07-13
- 3300 HYDE PARK, Hyde Park: UTRC05622, minor, term to 2026-08-14
What stands out
- Its term runs 364 days, April 14, 2025 to April 13, 2026; the term ended 155 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LANARK SUBDIVISION |
|---|---|
| Permittee | Trueline Contractors |
| NPDES ID | UTRC10680 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 14, 2025 |
| Expires | April 13, 2026 |
| Agency | UTDEQ |
| Address | Hyde Park, UT 84318 |
| Subwatershed | Hopkins Slough (HUC 160102020702) |
NPDES UTRC10680: effluent limits and exceedances
LANARK SUBDIVISION (NPDES UTRC10680): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC10680: no pollutant row on file.
NPDES UTRC10680: inspections, violations and enforcement
NPDES UTRC10680 (LANARK SUBDIVISION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC10680
NPDES UTRC10680: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC10680
NPDES UTRC10680: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.