NPDES UTRC11256 · Clean Water Act
HYDE PARK GATEWAY PHASE 1, Hyde Park, UT: NPDES UTRC11256 discharge permit, effluent exceedances, inspections, penalties
HYDE PARK GATEWAY PHASE 1, Hyde Park, Utah: General permit coverage UTRC11256, held by Capco LLC; Construction stormwater; Effective; issued July 14, 2025, term to July 13, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 9,850 were issued before UTRC11256.
Coverages issued nearest UTRC11256
- 2025-07-11: PETERSON RESIDENCE, Pleasant Grove: UTRH09984, held by Aero Development
- 2025-07-14: EDEN 11 CONSTRUCTION, Eden: UTRC08941, held by Kiewit Transmission Services - 1884
- 2025-07-14: VILLAS AT JDC RANCH, Plain City: UTRC09123, held by Leisure Villas LLC
- 2025-07-14: LAHWRAN RESIDENCE, Salt Lake City: UTRC09216, held by Steve Dubell Construction
- 2025-07-14: PARK CITY SD TREASURE MOUNTAIN SPORTS, Park City: UTRC11237, held by Hogan & Associates
- 2025-07-14: UNIVERSITY OF UTAH HEALTH: WEST VALLEY HEALTH CENTER AND HOSPITAL PHASE -1A, West Valley City: UTRC11259, held by Okland Construction
- 2025-07-14: LAYTON AMBULATORY SURGICAL CENTER - EXPANSION, Layton: UTRC11260, held by Big-D Construction
- 2025-07-14: JIB #1334 MARRIOTT-SLATERVILLE, Marriott-Slaterville: UTRC11261, held by Magellan Architects
- 2025-07-14: PARK CITY COMMUNITY CENTER BY OKLAND CONSTRUCTION, Park City: UTRC11262, held by Okland Construction
- 2025-07-14: ENTRADA CHACO LOT 24, St. George: UTRH09938, held by C. Blake Homes Inc.
HYDE PARK GATEWAY PHASE 1 among its neighbors
185 discharge permits are in the Hopkins Slough subwatershed (HUC 160102020702); UTRC11256 is one.
Other permits in the Hopkins Slough subwatershed (HUC 160102020702)
- 101 MTN GATE, Hyde Park: UTRH04429, minor, term to 2022-12-26
- 1030 EAST 612 SOUTH, Smithfield: UTRH06622, minor, term to 2024-05-16
- 1185 E 2560 N, North Logan: UTRH06734, minor, term to 2024-06-14
- 1200 EAST ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09446, minor, term to 2025-08-25
- 2600 N EXTENSION, North Logan: UTRL00556
- 2850 NORTH LOGAN, North Logan: UTRC13138, minor, term to 2027-07-01
- 2850 NORTH ROADWAY AND UTILITY IMPROVEMENTS, North Logan: UTRC09380, minor, term to 2025-08-12
- 3100 NORTH ROADWAY, Hyde Park: UTRC00148, minor, term to 2021-03-17
- 3100 NORTH ROADWAY 1200 EAST TO 1600 EAST, North Logan: UTRC00813, minor, term to 2021-07-13
- 3300 HYDE PARK, Hyde Park: UTRC05622, minor, term to 2026-08-14
What stands out
- Its term runs 364 days, July 14, 2025 to July 13, 2026; the term ended 93 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HYDE PARK GATEWAY PHASE 1 |
|---|---|
| Permittee | Capco LLC |
| NPDES ID | UTRC11256 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 14, 2025 |
| Expires | July 13, 2026 |
| Agency | UTDEQ |
| Address | Hyde Park, UT 84318 |
| Subwatershed | Hopkins Slough (HUC 160102020702) |
NPDES UTRC11256: effluent limits and exceedances
HYDE PARK GATEWAY PHASE 1 (NPDES UTRC11256): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC11256: no pollutant row on file.
NPDES UTRC11256: inspections, violations and enforcement
NPDES UTRC11256 (HYDE PARK GATEWAY PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC11256
NPDES UTRC11256: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC11256
NPDES UTRC11256: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.