NPDES UTRC12228 · Clean Water Act
SPRING RUN PHASE D, Eagle Mountain, UT: NPDES UTRC12228 discharge permit, effluent exceedances, inspections, penalties
SPRING RUN PHASE D, Eagle Mountain, Utah: General permit coverage UTRC12228, held by Rino Excavating; Construction stormwater; Effective; issued January 29, 2026, term to January 28, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 11,406 were issued before UTRC12228. Rino Excavating holds 20 permits in Utah.
Other permits held by Rino Excavating
- FENN FARMS, American Fork: UTRC01674, issued 2020-11-20
- VILLA D 'ESTE, Orem: UTRC02677, issued 2021-04-29
- ARROWHEAD SPRINGS PHASES 4-6, Salem: UTRC04909, issued 2022-04-26
- LONGVIEW MEADOWS, Elk Ridge: UTRC05870, issued 2022-09-23
- PROVO AIRPORT HANGER, Provo: UTRC05944, issued 2023-01-09
- HIGHLANDS AT ELK RIDGE, Elk Ridge: UTRC06091, issued 2022-11-21
- KEYSTONE SUBDIVISION, Provo: UTRC06430, issued 2023-02-22
- CHERRYPOINT ESTATES, Alpine: UTRC06610, issued 2023-03-27
- ARROWHEAD SPRINGS 4-6, Salem: UTRC07263, issued 2023-07-19
- ARROWHEAD SPRINGS 1-3, Salem: UTRC07287, issued 2023-07-21
Coverages issued nearest UTRC12228
- 2026-01-28: OMARA GALENA TWO LOT 55, Midway: UTRH10919, held by Mark Wintzer Company
- 2026-01-28: JENKINS HOME, Providence: UTRH10920, held by Tyler Gessel Hensel inc dba unique custom homes
- 2026-01-28: SOUTHERN SHORES LOT 8, Hurricane: UTRH10921, held by Immaculate Homes
- 2026-01-29: OVERLAND WEST OFFICE BUILDING, Washington Terrace: UTRC12226, held by Pentalon Construction
- 2026-01-29: NAVAJO STREET RECONSTRUCTION, Salt Lake City: UTRC12227, held by Jordan Valley Construction
- 2026-01-29: FINLEY FARMS LOT 88, Washington: UTRH10922, held by Novelty Homes
- 2026-01-29: HOLLY HOME, Huntsville: UTRH10923, held by Kastlerock Excavation
- 2026-01-29: PINTO LOT 6, Virgin: UTRH10924, held by Fahrenkamp Inc.
- 2026-01-29: ORCHARD RIDGE LOT 408, Kaysville: UTRH10925, held by Squires Construction
- 2026-01-29: LOT 30 PEACH SPRINGS, Hurricane: UTRH10927, held by Blake Jones
SPRING RUN PHASE D among its neighbors
588 discharge permits are in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002); UTRC12228 is one.
Other permits in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002)
- 10267 MOUNTAIN RIDGE (HANSEN), Highland: UTRH05540, minor, term to 2023-07-08
- 10665 N ALPINE HWY, Highland: UTRH00976, minor, term to 2021-08-06
- 10700 COMMERCIAL LOT 43 AND LOT 44, Highland: UTRC13181, minor, term to 2027-07-08
- 1100 WEST 350 SOUTH, American Fork: UTR397831, minor, term to 2020-12-02
- 130 SEASONS EST, Lehi: UTRH07171, minor, term to 2024-10-02
- 200 SERIES MANEUVER REPAIR (FY25), Bluffdale: UTRL00647
- 2022-23 ASD SCHOOL HOUSE, American Fork: UTRC05336, minor, term to 2023-06-26
- 2100 N MVC TO I-15, Lehi: UTRC12155, minor, term to 2027-01-13
- 2100 N MVC TO I-15 EXTERNAL SITES, Lehi: UTRC12174, minor, term to 2027-01-15
- 2645 N CENTER ST, Lehi: UTRH08574, minor, term to 2025-09-09
Identity
| Facility | SPRING RUN PHASE D |
|---|---|
| Permittee | Rino Excavating |
| NPDES ID | UTRC12228 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 29, 2026 |
| Expires | January 28, 2027 |
| Agency | UTDEQ |
| Address | Eagle Mountain, UT 84005 |
| Subwatershed | Outlet Dry Creek-Jordan River (HUC 160202011002) |
NPDES UTRC12228: effluent limits and exceedances
SPRING RUN PHASE D (NPDES UTRC12228): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC12228: no pollutant row on file.
NPDES UTRC12228: inspections, violations and enforcement
NPDES UTRC12228 (SPRING RUN PHASE D): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC12228
NPDES UTRC12228: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC12228
NPDES UTRC12228: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.