NPDES UTRC13246 · Clean Water Act
REGIONAL CENTER, Richfield, UT: NPDES UTRC13246 discharge permit, effluent exceedances, inspections, penalties
REGIONAL CENTER, Richfield, Utah: General permit coverage UTRC13246, held by Tushar Contracting; Construction stormwater; Effective; issued July 21, 2026, term to July 20, 2027, by UTDEQ.
- September 10, 2026: Evaluation (S).
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 13,114 were issued before UTRC13246. Tushar Contracting holds 5 permits in Utah.
Other permits held by Tushar Contracting
- NORTHEASTERN COUNSELING CENTER, Roosevelt: UTRC08361, issued 2024-02-26
- PRA MAINTENANCE HANGER, Price: UTRC09531, issued 2024-09-13
- FERRON AC, Ferron: UTRC12187, issued 2026-01-21
- ADMIN BUILDING, Wellington: UTRC13478, issued 2026-09-04
Coverages issued nearest UTRC13246
- 2026-07-21: SHADOW CREST COVE, Draper: UTRC13241, held by Cooper Con
- 2026-07-21: POWDER HAVEN, Eden: UTRC13242, held by Think Construction
- 2026-07-21: ZIONS GATES CONDOS, Hurricane: UTRC13243, held by 3 Dimensional Contractors, Inc
- 2026-07-21: PASEO THEATER, St. George: UTRC13244, held by Tom Stuart Construction
- 2026-07-21: F-R399(497) ROOSEVELT SAFE ROUTES TO SCHOOL FY26, Roosevelt: UTRC13245, held by Riley Cherrington
- 2026-07-21: HARTMAN RESIDENCE, Sandy: UTRH11741, held by Lucent Development
- 2026-07-21: CECITA CREST AT DIVARIO 142, St. George: UTRH11742, held by Novelty Homes
- 2026-07-21: SANDS COVE 25, Hurricane: UTRH11743, held by Rose Bradley Homes
- 2026-07-21: LOT 206 RAWSON RANCH, Hooper: UTRH11744, held by RYO CONSTRUCTION
- 2026-07-21: OAKLEY SINGLE FAMILY HOME, West Jordan: UTRH11745, held by Kimball Pugmire
REGIONAL CENTER among its neighbors
27 discharge permits are in the Maple Creek-Sevier River subwatershed (HUC 160300030309); UTRC13246 is one.
Other permits in the Maple Creek-Sevier River subwatershed (HUC 160300030309)
- ALLEN COMMERCIAL BUILDING, Richfield: UTRC12832, minor, term to 2027-05-13
- COTTONWOOD CORNER SUBDIVISION, Richfield: UTRC10886, minor, term to 2026-05-14
- COVE JUNCTION PHASE II, Richfield: UTRC11938, minor, term to 2026-11-17
- COVE MOUNTAIN VILLAGE PROJECT, Richfield: UTRC09490, minor, term to 2025-09-05
- CPF WATER IMPROVEMENTS, Richfield: UTRL00685
- CSS COMPOSITES - RICHFIELD, Richfield: UTRC02323, minor, term to 2022-03-14
- FISHLAKE NATIONAL FOREST, Richfield: UTG170081, minor, term to 2016-10-30
- HOLT OIL PRODUCTS CMPANY, Richfield: UTR000456, minor, term to 1998-12-31
- JDE OFFICE EXPANSION, Richfield: UTRC07420, minor, term to 2024-08-15
- NEWBY HOLT OIL CO INC, Richfield: UTR000387, minor, term to 1997-09-30
Identity
| Facility | REGIONAL CENTER |
|---|---|
| Permittee | Tushar Contracting |
| NPDES ID | UTRC13246 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 21, 2026 |
| Expires | July 20, 2027 |
| Agency | UTDEQ |
| Address | Richfield, UT 84701 |
| Subwatershed | Maple Creek-Sevier River (HUC 160300030309) |
NPDES UTRC13246: effluent limits and exceedances
REGIONAL CENTER (NPDES UTRC13246): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC13246: no pollutant row on file.
NPDES UTRC13246: inspections, violations and enforcement
NPDES UTRC13246: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| September 10, 2026 | Evaluation | S |
NPDES UTRC13246 (REGIONAL CENTER): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC13246
NPDES UTRC13246: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC13246
NPDES UTRC13246: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.