Clean Water Act discharge permit · NPDES UTRH07089
WRIDE PROPERTY, Mapleton, UT: NPDES UTRH07089 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
WRIDE PROPERTY, held by Capozzoli Construction, holds NPDES permit UTRH07089. EPA’s file records it issued September 19, 2023 and expiring September 18, 2024. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for WRIDE PROPERTY: its NPDES ID, its permit type and status, its dates, its address in Mapleton, Utah. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES UTRH07089.
What stands out
- Its term runs 365 days, September 19, 2023 to September 18, 2024; the term ended 756 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | WRIDE PROPERTY |
|---|---|
| Permittee as filed | Capozzoli Construction |
| NPDES ID | UTRH07089 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | September 19, 2023 |
| Expiration date | September 18, 2024 |
| Issuing agency | UTDEQ |
| Address | Mapleton, UT 84664 |
| Subwatershed | Outlet Hobble Creek (HUC 160202020405) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES UTRH07089.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES UTRH07089.
Inspections
EPA’s inspection file holds no inspection for NPDES UTRH07089.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES UTRH07089.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, UTRH07089.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID UTRH07089 there.
WRIDE PROPERTY, Mapleton, Utah: Coverage under a general permit UTRH07089, held by Capozzoli Construction; Construction stormwater; Effective; issued September 19, 2023, term to September 18, 2024, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 6,132 were issued before UTRH07089. Capozzoli Construction holds 4 permits in Utah.
Other permits held by Capozzoli Construction
- HENSTRA PROPERTY, Spanish Fork: UTRC05114, issued 2022-05-24
- CLEGG PROPERTY, Mapleton: UTRC07474, issued 2023-08-23
- WRIGHT HOME, Springville: UTRH11263, issued 2026-04-15
Coverages issued nearest UTRH07089
- 2023-09-18: BECKSTROM RESIDENCE, Riverton: UTRH07088, held by Jeff Beckstrom
- 2023-09-19: SILVER CREEK SINGLE FAMILY, Park City: UTRC03700, held by Hamlet Homes
- 2023-09-19: BRIDLE WALK PHASE 4 (GTM), Lake Point: UTRC07599, held by GTM Builders
- 2023-09-19: COLONY LOT 300, Park City: UTRC07601, held by Bart Carlson
- 2023-09-19: RED BRIDGE STATION, Payson: UTRC07606, held by Armour Construction
- 2023-09-19: 127 WINSTON PARK 1942 FITZROY, Ogden: UTRH07090, held by Justin Tolman
- 2023-09-19: 145 WINSTON PARK 1898 S FITZROY, Ogden: UTRH07091, held by Justin Tolman
- 2023-09-19: 1302 SUNSET CT., Ogden: UTRH07094, held by CK Construction & Roofing, Inc.
- 2023-09-19: 15 MATTERHORN CIRCLE, Park City: UTRH07096, held by Ryan Keller
- 2023-09-19: CARPENTER, Smithfield: UTRH07097, held by Brian Carlson
WRIDE PROPERTY among its neighbors
130 discharge permits are in the Outlet Hobble Creek subwatershed (HUC 160202020405); UTRH07089 is one.
Other permits in the Outlet Hobble Creek subwatershed (HUC 160202020405)
- 200 NORTH, Springville: UTRH09161, minor, term to 2026-02-02
- 247 NORTH 650 EAST, Springville: UTRH11112, minor, term to 2027-03-10
- 2499 POOL, Springville: UTRL00627
- 288 E CENTER (TRAVELLER), Springville: UTRH05840, minor, term to 2023-09-18
- 425 W FRONTAGE, Springville: UTRC12077, minor, term to 2026-12-28
- 499 W STETSON AV SARATOGA SPRINGS, Saratoga Springs: UTRH07177, minor, term to 2024-10-03
- 53 SOUTH 950 EAST, Springville: UTRH06303, minor, term to 2024-02-20
- 8 SPRING CANYON, Springville: UTRH11443, minor, term to 2027-05-20
- 927 WILLOW BROOK, Springville: UTRC11700, minor, term to 2026-09-30
- ALLRED RESIDENCE - CHERRINGTON HEIGHTS LOT 1, Springville: UTRH11824, minor, term to 2027-08-04
Nearby on the register
- Discharge permits in Mapleton
- Every permit record in Mapleton, A to Z
- Discharge permits in Utah
- Every permit record in Utah, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
Violations are on file for 0.0% of the 169 storm water construction permits in Mapleton. Of the 165 storm water construction permits in Mapleton, including WRIDE PROPERTY, 29.7% were issued before it. The Outlet Hobble Creek subwatershed holds 130 NPDES permits, WRIDE PROPERTY included.