BLACK RIDGE COVE LOT 708, St. George, Utah: General permit coverage UTRH09574, held by 1/43200ut LLC; Construction stormwater; Administratively continued; issued April 18, 2025, term to April 17, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 9,107 were issued before UTRH09574.
Coverages issued nearest UTRH09574
- 2025-04-18: NA-23-G53 UTAH SCATTERED, Aneth: AZR10I1BN, held by Navajo Area Indian Health Service
- 2025-04-18: EXCELSIOR WAY - ROAD DESIGN, Erda: UTRC08625, held by Ironwood Real Estate LLC
- 2025-04-18: BRIGHAM CITY CONNECTION PROJECT, Brigham City: UTRC10715, held by Wadsworth Brothers Construction
- 2025-04-18: ASHCRAFT RESIDENCE BY E BUILDERS, Alpine: UTRC10717, held by E Builders
- 2025-04-18: RIDGEVIEW LDS CHAPEL, Herriman: UTRC10719, held by Headwaters Construction Co
- 2025-04-18: OLSON CUSTOM BEAR LAKE - VERTICAL, Garden City: UTRH09578, held by Sierra Homebuilders, LLC
- 2025-04-18: NOKES RESIDENCE, Riverton: UTRH09579, held by Trent Nokes
- 2025-04-19: SOUTH VILLAGE AT BLACK DESERT, Santa Clara: UTRH09580, held by Split Rock Construction
- 2025-04-21: MAGNA TOWNHOMES, Magna: UTRC06593, held by Huckleberry Holdings
- 2025-04-21: PCMR CANYONS SNOWMAKING INSTALLATION, Park City: UTRC08867, held by VR CPC Holdings, INC.
BLACK RIDGE COVE LOT 708 among its neighbors
115 discharge permits are in the Cove Wash-Santa Clara River subwatershed (HUC 150100080809); UTRH09574 is one.
Other permits in the Cove Wash-Santa Clara River subwatershed (HUC 150100080809)
- 1240 VALLEY PARK DR, Santa Clara: UTRH10728, minor, term to 2026-12-07
- 698 ST GEORGE, St. George: UTRC04863, minor, term to 2023-04-18
- 7 BREW ST. GEORGE (SUNSET), St. George: UTRC12985, minor, term to 2027-06-14
- ASCESA, St. George: UTRC07298, minor, term to 2024-07-24
- ASCESA AT DIVARIO, St. George: UTRC04973, minor, term to 2023-05-03
- ASCESA COURT, St. George: UTRC10128, minor, term to 2026-01-13
- ASCESA COURT BUILDING #8, St. George: UTRC07181, minor, term to 2024-07-04
- BECCO CREEK, St. George: UTRC06814, minor, term to 2026-05-02
- BEEBE SOUTHGATE HILLS DR, St. George: UTRH00945, minor, term to 2021-08-03
- BLACK HILL TRAIL, St. George: UTRL00600
What stands out
- Its term runs 364 days, April 18, 2025 to April 17, 2026; the term ended 151 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BLACK RIDGE COVE LOT 708 |
|---|---|
| Permittee | 1/43200ut LLC |
| NPDES ID | UTRH09574 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 18, 2025 |
| Expires | April 17, 2026 |
| Agency | UTDEQ |
| Address | St. George, UT 84790 |
| Subwatershed | Cove Wash-Santa Clara River (HUC 150100080809) |
NPDES UTRH09574: effluent limits and exceedances
BLACK RIDGE COVE LOT 708 (NPDES UTRH09574): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH09574: no pollutant row on file.
NPDES UTRH09574: inspections, violations and enforcement
NPDES UTRH09574 (BLACK RIDGE COVE LOT 708): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH09574
NPDES UTRH09574: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH09574
NPDES UTRH09574: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.