NPDES UTRH10144 · Clean Water Act
DEAN HOME, Smithfield, UT: NPDES UTRH10144 discharge permit, effluent exceedances, inspections, penalties
DEAN HOME, Smithfield, Utah: General permit coverage UTRH10144, held by Mitchell Dean; Construction stormwater; Effective; issued August 12, 2025, term to August 11, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 10,119 were issued before UTRH10144.
Coverages issued nearest UTRH10144
- 2025-08-12: CREEK RIDGE COVE, Herriman: UTRC11429, held by Richmond American Homes
- 2025-08-12: 8495 E COBABE CT, Eden: UTRC11430, held by Cardinal Peaks LLC
- 2025-08-12: MARYSVALE ELEMENTARY, Marysvale: UTRC11431, held by BHI
- 2025-08-12: CIRCLEVILLE ELEMENTARY SCHOOL, Circleville: UTRC11432, held by BHI
- 2025-08-12: VINEYARD GATEWAY, Vineyard: UTRC11433, held by AFP West
- 2025-08-12: MICKLES RESIDENCE, Ogden: UTRH10145, held by Valley Design & Construction
- 2025-08-12: CLAWSON RESIDENCE, Provo: UTRH10147, held by JAG Construction
- 2025-08-12: SCENIC POINTE #36, Hurricane: UTRH10148, held by Ernie Beacham
- 2025-08-12: SCENIC POINT 38, Hurricane: UTRH10149, held by Urban Desert Homes
- 2025-08-13: VENTANA RESORT-PHASE I, Kanab: UTRC09374, held by Allied Construction
DEAN HOME among its neighbors
35 discharge permits are in the Nebo Creek-Bear River subwatershed (HUC 160102020703); UTRH10144 is one.
Other permits in the Nebo Creek-Bear River subwatershed (HUC 160102020703)
- 160 E. 200 N., Smithfield: UTRH06159, minor, term to 2023-12-29
- 265 N 300 E SMITHFIELD TRIPLEX, Smithfield: UTRH08380, minor, term to 2025-07-31
- 38 SMITHFIELD, Smithfield: UTRH10969, minor, term to 2027-02-08
- 540 E ROADWAY SMITHFIELD POINTE, Smithfield: UTRL00285
- CLINT & LESLIE WARD RESIDENCE, Richmond: UTRH02158, minor, term to 2022-01-27
- DAIRY FARMERS OF AMERICA, INC., Smithfield: UTR263863, minor, term to 2023-12-31
- ES7, Smithfield: UTRH11844, minor, term to 2027-08-09
- FOX MEADOWS, Smithfield: UTR394667, minor, term to 2020-07-10
- FOX MEADOWS, Smithfield: UTRC02354, minor, term to 2022-03-17
- GOLDEN FOREST, Smithfield: UTRC06341, minor, term to 2025-02-05
What stands out
- Its term runs 364 days, August 12, 2025 to August 11, 2026; the term ended 35 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DEAN HOME |
|---|---|
| Permittee | Mitchell Dean |
| NPDES ID | UTRH10144 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 12, 2025 |
| Expires | August 11, 2026 |
| Agency | UTDEQ |
| Address | Smithfield, UT 84335 |
| Subwatershed | Nebo Creek-Bear River (HUC 160102020703) |
NPDES UTRH10144: effluent limits and exceedances
DEAN HOME (NPDES UTRH10144): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH10144: no pollutant row on file.
NPDES UTRH10144: inspections, violations and enforcement
NPDES UTRH10144 (DEAN HOME): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH10144
NPDES UTRH10144: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH10144
NPDES UTRH10144: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.