NPDES UTRH10969 · Clean Water Act
38 SMITHFIELD, Smithfield, UT: NPDES UTRH10969 discharge permit, effluent exceedances, inspections, penalties
38 SMITHFIELD, Smithfield, Utah: General permit coverage UTRH10969, held by Jayden Gnehm; Construction stormwater; Effective; issued February 9, 2026, term to February 8, 2027, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 11,482 were issued before UTRH10969.
Coverages issued nearest UTRH10969
- 2026-02-09: KELLY AND KAY TAYLOR, River Heights: UTRH10884, held by Ballstaedt Builders
- 2026-02-09: ANDERSON RESIDENCE, Sandy: UTRH10964, held by RSDaw Building And Development
- 2026-02-09: PRESIDENTS PARK LOT 208, Grantsville: UTRH10966, held by Sunstone Homes Inc.
- 2026-02-09: HEIGHTS AT WASHINGTON BENCH LOT 92, Washington: UTRH10967, held by Johnathan Quinton
- 2026-02-09: DUMKE RESIDENCE, Salt Lake City: UTRH10968, held by Grove Homes
- 2026-02-10: MADISON MEADOWS, Heber City: UTRC12278, held by GRIFFIN MANAGEMENT
- 2026-02-10: RED CLIFFS CORNER, Washington: UTRC12279, held by Mountain View Investments & Construction, Inc
- 2026-02-10: LAYTON CANAL REPLACEMENT, Syracuse: UTRC12280, held by STAPP Construction
- 2026-02-10: GRANITE CONSTRUCTION COMPANY - DRAPER LANDSCAPE MATERIAL YARD, Draper: UTRC12281, held by Granite Construction Company
- 2026-02-10: JEREMY RANCH SEWER IMPROVEMENTS, Park City: UTRC12282, held by Spade Excavating
38 SMITHFIELD among its neighbors
35 discharge permits are in the Nebo Creek-Bear River subwatershed (HUC 160102020703); UTRH10969 is one.
Other permits in the Nebo Creek-Bear River subwatershed (HUC 160102020703)
- 160 E. 200 N., Smithfield: UTRH06159, minor, term to 2023-12-29
- 265 N 300 E SMITHFIELD TRIPLEX, Smithfield: UTRH08380, minor, term to 2025-07-31
- 540 E ROADWAY SMITHFIELD POINTE, Smithfield: UTRL00285
- CLINT & LESLIE WARD RESIDENCE, Richmond: UTRH02158, minor, term to 2022-01-27
- DAIRY FARMERS OF AMERICA, INC., Smithfield: UTR263863, minor, term to 2023-12-31
- DEAN HOME, Smithfield: UTRH10144, minor, term to 2026-08-11
- ES7, Smithfield: UTRH11844, minor, term to 2027-08-09
- FOX MEADOWS, Smithfield: UTR394667, minor, term to 2020-07-10
- FOX MEADOWS, Smithfield: UTRC02354, minor, term to 2022-03-17
- GOLDEN FOREST, Smithfield: UTRC06341, minor, term to 2025-02-05
Identity
| Facility | 38 SMITHFIELD |
|---|---|
| Permittee | Jayden Gnehm |
| NPDES ID | UTRH10969 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 9, 2026 |
| Expires | February 8, 2027 |
| Agency | UTDEQ |
| Address | Smithfield, UT 84335 |
| Subwatershed | Nebo Creek-Bear River (HUC 160102020703) |
NPDES UTRH10969: effluent limits and exceedances
38 SMITHFIELD (NPDES UTRH10969): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRH10969: no pollutant row on file.
NPDES UTRH10969: inspections, violations and enforcement
NPDES UTRH10969 (38 SMITHFIELD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRH10969
NPDES UTRH10969: one email when its EPA record changes — $99/month.
Permits near NPDES UTRH10969
NPDES UTRH10969: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.