Clean Water Act discharge permit · NPDES VAR10M853
WINCHESTER PARK PEDESTRIAN BRIDGE, Winchester, VA: NPDES VAR10M853 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
WINCHESTER PARK PEDESTRIAN BRIDGE, held by Vision Restoration and Contracting LLC, holds NPDES permit VAR10M853, which discharges to Abrams Creek. EPA’s file records it issued July 1, 2019 and expiring June 30, 2024. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for WINCHESTER PARK PEDESTRIAN BRIDGE: its NPDES ID, its permit type and status, its dates, its address in Winchester, Virginia, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES VAR10M853.
What stands out
- Its term runs 4 years and 365 days, July 1, 2019 to June 30, 2024; the term ended 836 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | WINCHESTER PARK PEDESTRIAN BRIDGE |
|---|---|
| Permittee as filed | Vision Restoration and Contracting LLC |
| NPDES ID | VAR10M853 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | July 1, 2019 |
| Expiration date | June 30, 2024 |
| Issuing agency | VA DEQ |
| Address | Winchester, VA 22601 |
| Receiving water | Abrams Creek |
| Subwatershed | Abrams Creek (HUC 020700040902) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES VAR10M853.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES VAR10M853.
Inspections
EPA’s inspection file holds no inspection for NPDES VAR10M853.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES VAR10M853.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, VAR10M853.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID VAR10M853 there.
WINCHESTER PARK PEDESTRIAN BRIDGE, Winchester, Virginia: Coverage under a general permit VAR10M853, held by Vision Restoration and Contracting LLC; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued July 1, 2019, term to June 30, 2024, by VA DEQ; discharges to Abrams Creek.
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 4 were issued before VAR10M853.
Coverages issued nearest VAR10M853
- 2019-07-01: MADISON VINES RV RESORT AND COTTAGES, Madison: VAR10M835, held by RV Managment Services DC LLC
- 2019-07-01: LAUREL HILL PHASE 2A, Lorton: VAR10M838, held by Brookfield Washington LLC
- 2019-07-01: GRASSMERE LOT 4, Augusta: VAR10M846, held by Long Shots LLC
- 2019-07-01: EAST GATE TOWNHOMES, Radford: VAR10M850, held by Collegiate Development Dalton LLC
- 2019-07-01: MT HEBRON CEMETARY MAUSOLEUM, Winchester: VAR10M851, held by Mount Hebron Cemetery
- 2019-07-01: CREEKSIDE AT MOSBY RIDGE, Manassas Park: VAR10M858, held by Jose Morais
- 2019-07-01: BENNETTS CREEK QUARTER PHASE I, Suffolk: VAR10M860, held by Bennetts Creek Quarter LLC
- 2019-07-01: DOOMS REGIONAL LAYDOWN YARD, Augusta: VAR10M863, held by Virginia Electric and Power Co
- 2019-07-01: VIRGINIA VARSITY STORAGE BUILDING, Roanoke: VAR10M864, held by LDG LLC
- 2019-07-01: BRADDOCK GATEWAY PHASE III, Alexandria: VAR10M865, held by CP VI Braddock Station LLC
WINCHESTER PARK PEDESTRIAN BRIDGE among its neighbors
48 discharge permits are in the Abrams Creek subwatershed (HUC 020700040902); VAR10M853 is one.
Other permits in the Abrams Creek subwatershed (HUC 020700040902)
- 135 IMBODEN DRIVE PROJECT, Winchester: VAR10O455, minor, term to 2024-06-30
- ABRAMS CREEK STREAM RESTORATION, Winchester: VAR10W982, minor, term to 2029-06-30
- ABRAMS CROSSING LOT 1, Winchester: VAR10T970, minor, term to 2024-06-30
- ABRAMS CROSSING LOT 5, Winchester: VAR10T975, minor, term to 2024-06-30
- ABRAMS POINTE SECTION 3, Winchester: VAR10Q735, minor, term to 2024-06-30
- ABRAMS POINTE SUBDIVISION SECTIONS 2A, 2B, 4A, 4B, Winchester: VAR10P886, minor, term to 2024-06-30
- CAMERON SQUARE - SITE PLAN, Winchester: VAR10V540, minor, term to 2029-06-30
- CAMERON STREET REDEVELOPMENT - REVISED SITE DEVELO, Winchester: VAR10U128, minor, term to 2029-06-30
- CENTRAL DOWNTOWN INFRASTRUCTURE IMPROVEMENTS PROJE, Winchester: VAR10N512, minor, term to 2024-06-30
- ESTES EXPRESS LINES - 005 WINCHESTER, Winchester: VAR052646, minor, term to 2029-06-30
Nearby on the register
- Discharge permits in Winchester
- Every permit record in Winchester, A to Z
- Discharge permits in Virginia
- Every permit record in Virginia, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
WINCHESTER PARK PEDESTRIAN BRIDGE is among 92 storm water construction permits in Winchester, where 0.0% carry a violation on file. The Abrams Creek subwatershed holds 48 NPDES permits, counting this permit. Within Winchester's 92 storm water construction permits, 0.0% were issued earlier than this permit.