NPDES VAR10Q369 · Clean Water Act
GLEBE SUBSTATION TO POTOMAC YARD LINE #2023 & #248, Arlington, VA: NPDES VAR10Q369 discharge permit, effluent exceedances, inspections, penalties
GLEBE SUBSTATION TO POTOMAC YARD LINE #2023 & #248, Arlington, Virginia: General permit coverage VAR10Q369, held by Virginia Electric and Power Co d/b/a Dominion Ener; Construction stormwater; Administratively continued; issued July 1, 2019, term to June 30, 2024, by VA DEQ; discharges to Potomac River-Fourmile Run.
- September 1, 2026: Evaluation (S).
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 4 were issued before VAR10Q369. Virginia Electric and Power Co d/b/a Dominion Ener holds 68 permits in Virginia.
Other permits held by Virginia Electric and Power Co d/b/a Dominion Ener
- FLAT CREEK SUBSTATION, Burkeville: VAR10O915, issued 2019-07-01
- VARINA SUBSTATION ON FERGUS BLVD, Henrico: VAR10P021, issued 2019-07-01
- CRYSTAL SUBSTATION EXPANSION & MODERNIZATION, Arlington: VAR10P445, issued 2019-07-01
- LINES 53 AND 72 TRANSMISSION LINE REBUILD, Richmond: VAR10Q530, issued 2019-07-01
- MOUNT STORM TO VALLEY 500 KV TRANSMISSION LINE 550, Fulks Run: VAR10Q549, issued 2019-07-01
- WAKEMAN SUBSTATION & TRANSMISSION TAP LINE, Manassas: VAR10Q663, issued 2019-07-01
- SEBERA RD SOLAR, Prince George County: VAR10Q791, issued 2019-07-01
- LINE 100 HARROWGATE LOCKS 115 KV TRANSMISSION LINE, Colonial Heights: VAR10R014, issued 2019-07-01
- WALNUT SOLAR - PART 2, Saluda: VAR10R081, issued 2019-07-01
- GRAPE VINE SUBSTATION, Palmyra: VAR10R292, issued 2019-07-01
Coverages issued nearest VAR10Q369
- 2019-07-01: NAPARLO CARWASH, Chesapeake: VAR10Q359, held by Andujar Construction
- 2019-07-01: CHAPMAN -BEVERLEY MILL, Broad Run: VAR10Q361, held by Blue Run Preserve Inc
- 2019-07-01: SAFFORD MAZDA, Fredericksburg: VAR10Q363, held by Gramm & Bethard LLC
- 2019-07-01: LADYSMITH VILLAGE, Ruther Glen: VAR10Q364, held by Walton Virginia LLC
- 2019-07-01: ORCHARD HILL SQUARE, Staunton: VAR10Q367, held by Triangle Services, LLC
- 2019-07-01: CEDAR MILL SUBDIVISION, Warrenton: VAR10Q372, held by RFI CM, LC
- 2019-07-01: DUNKIN' BAKERY, Manassas: VAR10Q374, held by Vigario's Bakery LLC
- 2019-07-01: SPOTSYLVANIA MIDDLE SCHOOL PARKING LOT, Spotsylvania: VAR10Q376, held by Spotsylvania County School Board
- 2019-07-01: LOUDOUN CROSSROADS, Chantilly: VAR10Q378, held by Blue Summit LLC
- 2019-07-01: GREGORY LUMBER, Java: VAR10Q379, held by Gregory Lumber Inc
GLEBE SUBSTATION TO POTOMAC YARD LINE #2023 & #248 among its neighbors
124 discharge permits are in the Fourmile Run-Potomac River subwatershed (HUC 020700100301); VAR10Q369 is one.
Other permits in the Fourmile Run-Potomac River subwatershed (HUC 020700100301)
- 4600 FAIRFAX DRIVE, Arlington: VAR10W570, minor, term to 2029-06-30
- 624 N GLEBE RD, Arlington: VAR10O720, minor, term to 2024-06-30
- 901 NORTH FAIRFAX, Alexandria: VAR10M123, minor, term to 2024-06-30
- 901 PITT STREET, Alexandria: VAR10S425, minor, term to 2024-06-30
- ACE BUILDING RAZE, Alexandria: VAR10S976, minor, term to 2024-06-30
- AHDC GLEBE MOUNT VERNON, Alexandria: VAG830610, minor, term to 2028-02-29
- AHDC GLEBE/MT.VERNON, Alexandria: VAR10S111, minor, term to 2024-06-30
- AHDC SEMINARY ROAD, Alexandria: VAR10R749, minor, term to 2024-06-30
- ALABAMA AVENUE APARTMENTS, Washington, D.C.: DCR1000BR, minor, term to 2027-02-16
- ALEXAN COLUMBIA PIKE, Arlington: VAR10X283, minor, term to 2029-06-30
What stands out
- Its term runs 4 years and 365 days, July 1, 2019 to June 30, 2024; the term ended 836 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on September 1, 2026, 43 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GLEBE SUBSTATION TO POTOMAC YARD LINE #2023 & #248 |
|---|---|
| Permittee | Virginia Electric and Power Co d/b/a Dominion Ener |
| NPDES ID | VAR10Q369 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 1, 2019 |
| Expires | June 30, 2024 |
| Agency | VA DEQ |
| Address | Arlington, VA 22022 |
| Receiving water | Potomac River-Fourmile Run |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Fourmile Run-Potomac River (HUC 020700100301) |
NPDES VAR10Q369: effluent limits and exceedances
GLEBE SUBSTATION TO POTOMAC YARD LINE #2023 & #248 (NPDES VAR10Q369): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES VAR10Q369: no pollutant row on file.
NPDES VAR10Q369: inspections, violations and enforcement
NPDES VAR10Q369: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| September 1, 2026 | Evaluation | S |
NPDES VAR10Q369 (GLEBE SUBSTATION TO POTOMAC YARD LINE #2023 & #248): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES VAR10Q369
NPDES VAR10Q369: one email when its EPA record changes — $99/month.
Permits near NPDES VAR10Q369
NPDES VAR10Q369: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.