Clean Water Act discharge permit · NPDES VAR10S028
ARCOLA CENTER PHASE I, Dulles, VA: NPDES VAR10S028 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
ARCOLA CENTER PHASE I, held by St John Properties Inc, holds NPDES permit VAR10S028, which discharges to Cub Run. EPA’s file records it issued July 1, 2019 and expiring June 30, 2024. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for ARCOLA CENTER PHASE I: its NPDES ID, its permit type and status, its dates, its address in Dulles, Virginia, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES VAR10S028.
What stands out
- Its term runs 4 years and 365 days, July 1, 2019 to June 30, 2024; the term ended 807 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,137 discharge permits on the register in Virginia; 6,257 of them (48%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | ARCOLA CENTER PHASE I |
|---|---|
| Permittee as filed | St John Properties Inc |
| NPDES ID | VAR10S028 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | July 1, 2019 |
| Expiration date | June 30, 2024 |
| Issuing agency | VA DEQ |
| Address | Dulles, VA 20166 |
| Receiving water | Cub Run |
| Subwatershed | Lenah Run-Broad Run (HUC 020700080901) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES VAR10S028.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES VAR10S028.
Inspections
EPA’s inspection file holds no inspection for NPDES VAR10S028.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES VAR10S028.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, VAR10S028.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID VAR10S028 there.
ARCOLA CENTER PHASE I, Dulles, Virginia: Coverage under a general permit VAR10S028, held by St John Properties Inc; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued July 1, 2019, term to June 30, 2024, by VA DEQ; discharges to Cub Run.
Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 4 were issued before VAR10S028.
Coverages issued nearest VAR10S028
- 2019-07-01: BOSCOBEL TRACE SUBDIVISION, Manakin-Sabot: VAR10S019, held by Spuce Homes, LLC
- 2019-07-01: DOLLAR TREE, Ruckersville: VAR10S020, held by HJB Construction Inc.
- 2019-07-01: CRIST FARM TRAIL, Bridgewater: VAR10S022, held by Momentum Earthworks, LLC
- 2019-07-01: WELLS ENTERPRISES, Fishersville: VAR10S023, held by Ridgetop Excavating LLC
- 2019-07-01: VDOT FAIRFAX 0029 029 350 UPC 110329, Fairfax County: VAR10S025, held by Virginia Department of Transportation
- 2019-07-01: PRN: 19523 SITE PLAN, South Hill: VAR10S030, held by Glover Construction Co, Inc
- 2019-07-01: GAINESVILLE TECH PARK, Bristow: VAR10S031, held by SJP Bristow Investors LLC
- 2019-07-01: BYRD MILL RUN SUBDIVISION, Louisa: VAR10S034, held by Monarch Land LLC
- 2019-07-01: HCA AT GATEWAY SQUARE, Richmond: VAR10S042, held by Eagle Construction of VA., LLC
- 2019-07-01: VALLEY HEALTH MEDICAL OFFICE BUILDING, Strasburg: VAR10S047, held by Shenandoah Memorial Hospital
ARCOLA CENTER PHASE I among its neighbors
75 discharge permits are in the Lenah Run-Broad Run subwatershed (HUC 020700080901); VAR10S028 is one.
Other permits in the Lenah Run-Broad Run subwatershed (HUC 020700080901)
- 41859 MOSBY PROPERTIES LLC, Aldie: VAR10S545, minor, term to 2024-06-30
- ALLEGRO NORTH CAMPUS, Aldie: VAR10X098, minor, term to 2029-06-30
- ALLEGRO NORTH CAMPUS - BUILDING 2A, Aldie: VAR10W483, minor, term to 2029-06-30
- AMAZON COM SERVICES LLC - DDC4, Sterling: VAR052420, minor, term to 2024-06-30
- AMAZON COM SERVICES LLC - DDC4 1, Sterling: VAR052461, minor, term to 2024-06-30
- ARCOLA CENTER PHASE II, Dulles: VAR10U944, minor, term to 2029-06-30
- ARCOLA MILLS LANDSCAPING, Sterling: VAR10R910, minor, term to 2024-06-30
- AVENTON MOOREFIELD II, Ashburn: VAR10W264, minor, term to 2029-06-30
- BARRISTER STREET AT SILVER DISTRICT, Ashburn: VAR10S118, minor, term to 2024-06-30
- BELMONT RIDGE ROAD AND ARCOLA MILLS DRIVE INTERIM, Ashburn: VAR10V600, minor, term to 2029-06-30
Nearby on the register
- Discharge permits in Dulles
- Every permit record in Dulles, A to Z
- Discharge permits in Virginia
- Every permit record in Virginia, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
ARCOLA CENTER PHASE I is among the 20 storm water construction permits in Dulles on EPA's NPDES register, and 0.0% of those carry a violation on file. The Lenah Run-Broad Run subwatershed (HUC 020700080901) holds 75 NPDES permits, counting the coverage held by St John Properties Inc.