Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water | Status and term |
|---|---|---|---|---|---|
| ARCOLA CENTER PHASE I | VAR10S028 | Construction stormwater | Minor | Cub Run | Administratively continued, 2019-07-01 to 2024-06-30 |
| ARCOLA CENTER PHASE II | VAR10U944 | Construction stormwater | Minor | Broad Run-Lenah Run | Effective, 2024-07-01 to 2029-06-30 |
| CONCOURSE A-B SE APRON & TLE 1 RECONSTRUCTION | VAR10T618 | Construction stormwater | Minor | Horsepen Run | Administratively continued, 2019-07-01 to 2024-06-30 |
| CONSTRUCT NEW TAXILANES W&W3 AND RECONSTRUCT TAXIL | VAR10W904 | Construction stormwater | Minor | Horsepen Run | Effective, 2024-07-01 to 2029-06-30 |
| DULLES SOLAR AND BATTERY PROJECT PHASE I | VAR10T008 | Construction stormwater | Minor | Cub Run | Administratively continued, 2019-07-01 to 2024-06-30 |
| DULLES SOLAR AND BATTERY PROJECT PHASE II | VAR10T302 | Construction stormwater | Minor | Cub Run | Administratively continued, 2019-07-01 to 2024-06-30 |
| DULLES TIER 2 CONCOURSE (CENTER) | VAR10X117 | Construction stormwater | Minor | Potomac River-Tank Creek | Effective, 2024-07-01 to 2029-06-30 |
| DULLES TIER 2 CONCOURSE (EAST) | VAR10T099 | Construction stormwater | Minor | Cub Run | Administratively continued, 2019-07-01 to 2024-06-30 |
| DULLES TOWN CENTER PHASE 1 | VAR10V633 | Construction stormwater | Minor | Broad Run-Beaverdam Run | Effective, 2024-07-01 to 2029-06-30 |
| DULLES TOWN CENTER PHASE 2 PART 2 | VAR10V873 | Construction stormwater | Minor | Broad Run-Beaverdam Run | Effective, 2024-07-01 to 2029-06-30 |
| EDGECORE MORAN DUCT BANK EXTENSION | VAR10W552 | Construction stormwater | Minor | Broad Run-Beaverdam Run | Effective, 2024-07-01 to 2029-06-30 |
| IAD 03 DUCT BANK EXTENSION | VAR10V894 | Construction stormwater | Minor | Broad Run-Beaverdam Run | Effective, 2024-07-01 to 2029-06-30 |
| IAD 251 SPAN 7 OLD OX ROAD CONNECTION | VAR10W566 | Construction stormwater | Minor | Horsepen Run | Effective, 2024-07-01 to 2029-06-30 |
| IAD11 DATA CENTER | VAR10P668 | Construction stormwater | Minor | Broad Run-Lenah Run | Administratively continued, 2019-07-01 to 2024-06-30 |
| METROPOLITAN WASHINGTON AIRPORTS AUTHORITY - WASHINGTON DULLES INTERNATIONAL AIR | DCPIU0006 | Minor | Effective, 2023-12-01 to 2027-11-30 | ||
| MWAA E LINE SANITARY SEWER SYSTEM IMPROVEMENTS | VAR10V275 | Construction stormwater | Minor | Horsepen Run | Effective, 2024-07-01 to 2029-06-30 |
| NORTHROP GRUMMAN SYSTEMS CORPORATION | DCPIU000I | Minor | Effective, 2024-05-01 to 2029-04-30 | ||
| NORTHWOODS | VAR103973 | Construction stormwater | Minor | Horsepen Run | Administratively continued, 2019-07-01 to 2024-06-30 |
| RECONSTRUCT TAXI LANE D, TAXIWAY F & TAXIWAY Z IAD | VAR10V583 | Construction stormwater | Minor | Horsepen Run | Effective, 2024-07-01 to 2029-06-30 |
| SNOW REMOVAL EQUIPMENT AREA & GATE 225A (DULLES TI | VAR10T724 | Construction stormwater | Minor | Cub Run | Administratively continued, 2019-07-01 to 2024-06-30 |
| VA MTR#2 TO VANTAGE (320 CIRCUIT) | VAR10V677 | Construction stormwater | Minor | Broad Run-Beaverdam Run | Effective, 2024-07-01 to 2029-06-30 |
| WATERSIDE | VAR10L800 | Construction stormwater | Minor | Horsepen Run | Administratively continued, 2019-07-01 to 2024-06-30 |
Other cities in Virginia
- Dillwyn 17
- Dinwiddie 5
- Disputanta 6
- Dixiana 12
- Doswell 21
- Drakes Branch 4
- Drill 3
- Dry Fork 3
- Dublin 33
- Duffield 36
- Dumfries 36
- Dunbar 11
- Dungannon 11
- Eagle Rock 9
- Earlysville 5
- Edinburg 50
- Elkton 47
- Elkwood 12
- Elliston 8
- Emporia 35
What this page shows
This page covers Clean Water Act discharge permits in the EPA NPDES register for DULLES. It lists 22 permits.