NPDES WAR012526 · Clean Water Act
WELLESLEY AVENUE REHABILITATION FROM MAPLE TO DIVISION, Spokane, WA: NPDES WAR012526 discharge permit, effluent exceedances, inspections, penalties
WELLESLEY AVENUE REHABILITATION FROM MAPLE TO DIVISION, Spokane, Washington: General permit coverage WAR012526, held by City of Spokane; Construction stormwater; Administratively continued; issued November 16, 2005, term to December 16, 2010, by State.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 19 were issued before WAR012526. City of Spokane holds 7 permits in Washington.
Other permits held by City of Spokane
- NELSON ST & SURROUNDING STREETS, Spokane: WAR012524, issued 2005-11-16
- SPOKANE CITY, Spokane: WAR046505, issued 2019-07-01
- RIVERFRONT PARK SPOKANE PROJECT, Spokane: WAR304717, issued 2015-11-18
- NSC EUCLID AVE SEWER & WATER, Spokane: WAR307439, issued 2015-11-18
- FISH LAKE TRAIL PHASE 1, Spokane: WAR315949, issued 2025-11-19
- DRISCOLL BLVD SIDEWALK GARLAND TO WELLESLEY, Spokane: WAR316000, issued 2025-11-19
Coverages issued nearest WAR012526
- 2005-11-16: GRAPEVIEW LOOP ROAD REALIGNMENT, Shelton: WAR012395, held by Mason County Public Works
- 2005-11-16: MP 37.10 RESERVOIR, Sunnyside: WAR012396, held by Sunnyside Valley Irrigation Dist
- 2005-11-16: THE GREENS, Federal Way: WAR012472, held by DR Horton Seattle Division
- 2005-11-16: WILDWOOD RESORT, Sedro-Woolley: WAR012522, held by Faber Brothers Construction Corp
- 2005-11-16: NELSON ST & SURROUNDING STREETS, Spokane: WAR012524, held by City of Spokane
- 2005-11-16: OLD TOWN STORMWATER WETLAND PROJECT, Arlington: WAR012527, held by City of Arlington
- 2005-11-16: WILLOW PARK, Marysville: WAR012530, held by Encore Homes
- 2005-11-16: MIDDLE BRANCH LE CLERC CREEK CULVERT REPLACEMENT, (Unspecified): WAR012531, held by Pend Oreille County
- 2005-11-16: WA DOT I-5 DOWNTOWN BELLINGHAM ON/OFF RAMPS, (Unspecified): WAR012534, held by Washington State Department of Transportation
- 2005-11-16: BNSF STANWOOD SIDING CROSSOVER & EXTENSION PROJECT, Stanwood: WAR012552, held by BNSF Railway
WELLESLEY AVENUE REHABILITATION FROM MAPLE TO DIVISION among its neighbors
24 discharge permits are in the Nine Mile Reservoir-Spokane River subwatershed (HUC 170103070105); WAR012526 is one. Its county: 141, 3 major; WAR012526 is minor permit.
Other permits in the Nine Mile Reservoir-Spokane River subwatershed (HUC 170103070105)
- ADAMS TRACTOR, Spokane: WAR314959, minor, term to 2025-12-31
- AIRWAY HEIGHTS WATER RECLAMATION, Airway Heights: WAL011457, minor, term to 2025-12-31
- CENTRAL PRE MIX CONCRETE HAYFORD SITE, Spokane: WAG507107, minor, term to 2026-03-31
- CSO 6 CONTROL FACILITY, Spokane: WAR302585, minor, term to 2015-12-31
- CSO 6 CONTROL FACILITY PHASE 2, Spokane: WAR302862, minor, term to 2015-12-31
- DRISCOLL BLVD SIDEWALK GARLAND TO WELLESLEY, Spokane: WAR316000, minor, term to 2030-12-31
- FRANCIS ASSEMBLY STREET UTILITY PROJECT, Spokane: WAR314566, minor, term to 2025-12-31
- HABIT BURGER GRILL, Spokane: WAR315736, minor, term to 2030-12-31
- KFO SPO CROSSDOCK, Airway Heights: WAR315294, minor, term to 2030-12-31
- MCKINSTRY SHOP 2, Spokane: WAR315766, minor, term to 2030-12-31
What stands out
- Its term runs 5 years and 30 days, November 16, 2005 to December 16, 2010; the term ended 5,752 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WELLESLEY AVENUE REHABILITATION FROM MAPLE TO DIVISION |
|---|---|
| Permittee | City of Spokane |
| NPDES ID | WAR012526 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 16, 2005 |
| Expires | December 16, 2010 |
| Agency | State |
| Address | Spokane, WA 99205 |
| Subwatershed | Nine Mile Reservoir-Spokane River (HUC 170103070105) |
NPDES WAR012526: effluent limits and exceedances
WELLESLEY AVENUE REHABILITATION FROM MAPLE TO DIVISION (NPDES WAR012526): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES WAR012526: no pollutant row on file.
NPDES WAR012526: inspections, violations and enforcement
NPDES WAR012526 (WELLESLEY AVENUE REHABILITATION FROM MAPLE TO DIVISION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR012526
NPDES WAR012526: one email when its EPA record changes — $99/month.
Permits near NPDES WAR012526
NPDES WAR012526: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.