Velarion Records
Free: one email when NPDES WAR304717 changes. Unsubscribe any time.

NPDES WAR304717 · Clean Water Act

RIVERFRONT PARK SPOKANE PROJECT, Spokane, WA: NPDES WAR304717 discharge permit, effluent exceedances, inspections, penalties

RIVERFRONT PARK SPOKANE PROJECT, Spokane, Washington: General permit coverage WAR304717, held by City of Spokane; Construction stormwater; Administratively continued; issued November 18, 2015, term to December 31, 2020, by State.

  • pH: 2 limits, 54 violations of any kind.
  • Arsenic, total [as As]: 2 limits, 37 violations of any kind.
  • Cadmium, total [as Cd]: 2 limits, 37 violations of any kind.
  • Chromium, total [as Cr]: 2 limits, 37 violations of any kind.
  • Lead, total [as Pb]: 2 limits, 37 violations of any kind.
  • Acenaphthylene: 2 limits, 37 violations of any kind.
  • Benzo[b]fluoranthene: 2 limits, 37 violations of any kind.
  • Benzo[k]fluoranthene: 2 limits, 37 violations of any kind.
  • Benzo[a]pyrene: 2 limits, 37 violations of any kind.
  • Chrysene: 2 limits, 37 violations of any kind.
  • Fluoranthene: 2 limits, 37 violations of any kind.
  • Indeno[1,2,3-cd]pyrene: 2 limits, 37 violations of any kind.
  • Phenanthrene: 2 limits, 37 violations of any kind.
  • Pyrene: 2 limits, 37 violations of any kind.
  • Benzo[ghi]perylene: 2 limits, 37 violations of any kind.
  • Benzo[a]anthracene: 2 limits, 37 violations of any kind.
  • Polychlorinated biphenyls [PCBs]: 2 limits, 37 violations of any kind.
  • Total Petroleum Hydrocarbons - Diesel: 2 limits, 37 violations of any kind.
  • Turbidity: 1 limit, 20 violations of any kind.

Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,530 were issued before WAR304717. City of Spokane holds 7 permits in Washington.

Other permits held by City of Spokane

Coverages issued nearest WAR304717

RIVERFRONT PARK SPOKANE PROJECT among its neighbors

96 discharge permits are in the Chester Creek-Spokane River subwatershed (HUC 170103050402); WAR304717 is one.

Other permits in the Chester Creek-Spokane River subwatershed (HUC 170103050402)

What stands out

  • Its term runs 5 years and 43 days, November 18, 2015 to December 31, 2020; the term ended 2,084 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityRIVERFRONT PARK SPOKANE PROJECT
PermitteeCity of Spokane
NPDES IDWAR304717
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedNovember 18, 2015
ExpiresDecember 31, 2020
AgencyState
AddressSpokane, WA 99201
Receiving water impaired303(D) Listed
SubwatershedChester Creek-Spokane River (HUC 170103050402)

NPDES WAR304717: effluent limits and exceedances

RIVERFRONT PARK SPOKANE PROJECT (NPDES WAR304717): 19 pollutants on file, 19 limited; 19 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
pH2540
Arsenic, total [as As]2370
Cadmium, total [as Cd]2370
Chromium, total [as Cr]2370
Lead, total [as Pb]2370
Acenaphthylene2370
Benzo[b]fluoranthene2370
Benzo[k]fluoranthene2370
Benzo[a]pyrene2370
Chrysene2370
Fluoranthene2370
Indeno[1,2,3-cd]pyrene2370
Phenanthrene2370
Pyrene2370
Benzo[ghi]perylene2370
Benzo[a]anthracene2370
Polychlorinated biphenyls [PCBs]2370
Total Petroleum Hydrocarbons - Diesel2370
Turbidity1200

NPDES WAR304717: inspections, violations and enforcement

NPDES WAR304717 (RIVERFRONT PARK SPOKANE PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES WAR304717

NPDES WAR304717: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES WAR304717

NPDES WAR304717: 19 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.