NPDES WAR10F09M · Clean Water Act
FY24 MDTF DOUBLE BARRACKS, Jblm, WA: NPDES WAR10F09M discharge permit, effluent exceedances, inspections, penalties
FY24 MDTF DOUBLE BARRACKS, Jblm, Washington: General permit coverage WAR10F09M, held by Absher Construction; Construction stormwater; Effective; issued July 16, 2024, term to February 16, 2027, by U.S. EPA.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 3,842 were issued before WAR10F09M. Absher Construction holds 10 permits in Washington.
Other permits held by Absher Construction
- FY24 P891 SHIPYARD ELECTRICAL BACKBONE, Bremerton: WAR10F0AI, issued 2025-02-12
- FY24 P891 ELECTRICAL BACKBONE, Bremerton: WAR10F0AV, issued 2025-04-11
- P982 ARMORED FIGHTING VEHICLE SUPPORT FACILITY, Silverdale: WAR10F0BJ, issued 2025-11-11
- FY24 SOF CONSOLIDATED RIGGING FACILITY, Joint Base Lewis Mcchord: WAR10F0BU, issued 2025-12-26
- TACOMA TOWN CENTER, Tacoma: WAR306067, issued 2015-11-18
- LYNNWOOD LINK EXTENSION, Shoreline: WAR313891, issued 2020-11-18
- SOUTH WHIDBEY ELEMENTARY SCHOOL, Langley: WAR315118, issued 2020-11-18
- SOUTH WHIDBEY HIGH SCHOOL MIDDLE SCHOOL, Langley: WAR315189, issued 2020-11-18
- WSU FRUIT TREE RESEARCH PLANT GROWTH FACILITY, Wenatchee: WAR315477, issued 2025-11-19
Coverages issued nearest WAR10F09M
- 2024-04-10: RHOADS BORROW, Wellpinit: WAR10I037, held by Dawn Mining Company
- 2024-04-30: P260-P8A AIRFIELD IMPROVEMENTS, Oak Harbor: WAR10F097, held by NAS Whidbey Island
- 2024-05-02: AMPERE DEMOLITION AND SITE PREPARATION, Vancouver: WAR10F099, held by Bonneville Power Administration Sean Joyce Director of Facilities Services
- 2024-05-24: US 101 / QUINAULT RESERVATION - REMOVE FISH BARRIERS, Queets: WAR10I039, held by Kiewit Infrastructure Co.
- 2024-06-04: MOUNT SAINT HELENS SPIRIT LAKE TUNNEL INTAKE, Cougar: WAR10F09F, held by Advanced American Construction
- 2024-07-22: SR 105 / GRAVEYARD SPIT DYNAMIC REVETMENT AND DUNE RESTORATION, Tokeland: WAR10I03B, held by Washington State Department of Transportation
- 2024-07-25: DEMOLISH AND CONSTRUCT CRESCENT HARBOR ELEMENTARY SCHOOL, Oak Harbor: WAR10F09N, held by Tiger Construction Ltd
- 2024-07-29: STREAMBANK STABILIZATION FOR 45PO412, Usk: WAR10I03D, held by Kalispel Indian Community of the Kalispel Reservation
- 2024-07-31: DEMOLISH AND CONSTRUCT CRESCENT HARBOR ELEMENTARY SCHOOL, Oak Harbor: WAR10F09S, held by NAS Whidbey Island
- 2024-08-14: REPAIR PERIMETER ROAD BRIDGE, Mcchord Afb: WAR10F09U, held by Tribal One Technology
FY24 MDTF DOUBLE BARRACKS among its neighbors
21 discharge permits are in the Nisqually River-Frontal Puget Sound subwatershed (HUC 171100150307); WAR10F09M is one.
Other permits in the Nisqually River-Frontal Puget Sound subwatershed (HUC 171100150307)
- AFFINITY AT DUPONT, Dupont: WAR314337, minor, term to 2025-12-31
- DEUTSCHER YELM COMMERCIAL, Yelm: WAR314665, minor, term to 2025-12-31
- FAIRFIELD INN & SUITES, Dupont: WAR303494, minor, term to 2015-12-31
- FY23 PN97456 UEPH BARRACKS, Joint Base Lewis Mcchord: WAR10F08P, minor, term to 2027-02-16
- FY24 SOF CONSOLIDATED RIGGING FACILITY, Joint Base Lewis Mcchord: WAR10F0BU, minor, term to 2027-02-16
- HOFFMAN HILL WATER TREATMENT FACILITY, Dupont: WAG641029, minor, term to 2029-08-31
- JBLM DES MICROGRID, Joint Base Lewis-Mcchord: WAR10F0BP, minor, term to 2027-02-16
- JBLM GAAF MICROGRID, Joint Base Lewis-Mcchord: WAR10F0C3, minor, term to 2027-02-16
- JBLM SUPPLY STORAGE ACTIVITY WAREHOUSE, Joint Base Lewis-Mcchord: WAR10F0CD, minor, term to 2027-02-16
- JOINT BASE LEWIS-MCCHORD, Jblm: WAL021954, minor, term to 2025-12-31
What stands out
- Its term runs 2 years and 215 days, July 16, 2024 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FY24 MDTF DOUBLE BARRACKS |
|---|---|
| Permittee | Absher Construction |
| NPDES ID | WAR10F09M |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 16, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Jblm, WA 98433 |
| Subwatershed | Nisqually River-Frontal Puget Sound (HUC 171100150307) |
NPDES WAR10F09M: effluent limits and exceedances
FY24 MDTF DOUBLE BARRACKS (NPDES WAR10F09M): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES WAR10F09M: no pollutant row on file.
NPDES WAR10F09M: inspections, violations and enforcement
NPDES WAR10F09M (FY24 MDTF DOUBLE BARRACKS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR10F09M
NPDES WAR10F09M: one email when its EPA record changes — $99/month.
Permits near NPDES WAR10F09M
NPDES WAR10F09M: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.