NPDES WAR10F0CF · Clean Water Act
FRYINGPAN CREEK BRIDGE WA NP MORA 11(1), Packwood, WA: NPDES WAR10F0CF discharge permit, effluent exceedances, inspections, penalties
FRYINGPAN CREEK BRIDGE WA NP MORA 11(1), Packwood, Washington: General permit coverage WAR10F0CF, held by FHWA, Western Federal Lands Highway Division; Construction stormwater; Effective; issued March 30, 2026, term to February 16, 2027, by U.S. EPA.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 4,629 were issued before WAR10F0CF. FHWA, Western Federal Lands Highway Division holds 7 permits in Washington.
Other permits held by FHWA, Western Federal Lands Highway Division
- REHABILITATE STEVENS CANYON ROAD, MP 5.0 THROUGH 14.0, WA NPS MORA 13(7), Near Longmire: WAR10F052, issued 2020-04-08
- WA NPS NOCA 10(7), STEHEKIN VALLEY ROAD EMERGENCY REROUTE, Chelan: WAR10F06S, issued 2021-11-04
- REHABILITATE STEVENS CANYON ROAD, MP 5.0 THROUGH 14.0, WA NPS MORA 13(7), Near Longmire: WAR10F07G, issued 2022-07-07
- WA NP MORA 123(2), LAUGHINGWATER CREEK TO PANTHER CREEK BRIDGE, Packwood: WAR10F08M, issued 2023-11-15
- MOUNT RAINIER ERFO REPAIRS 2022, Carbonado: WAR10F0AH, issued 2025-02-11
- REPAIR STORM DAMAGE ON MORA ROAD, La Push: WAR10I03W, issued 2025-07-22
Coverages issued nearest WAR10F0CF
- 2026-03-20: RM18-1806 REPAIR RAILROAD CULVERTS PHASE 3, Bremerton: WAR10F0CB, held by Port Madison Construction Corporation
- 2026-03-23: RM18-1806 REPAIR RAILROAD CULVERTS PHASE 3, Bremerton: WAR10F0CC, held by NAVFAC NW
- 2026-03-25: JBLM SUPPLY STORAGE ACTIVITY WAREHOUSE, Joint Base Lewis-Mcchord: WAR10F0CD, held by STG Pacific, LLC
- 2026-03-27: MSH SEDIMENT RETENTION STRUCTURE CREST RAISE, Cowlitz County: WAR10F0CE, held by Odin Environmental Solutions LLC
- 2026-03-27: NEW TAHOLAH SCHOOL K-12, Taholah: WAR10I042, held by Akana
- 2026-03-31: WEBBER CANYON SUBSTATION PROJECT - P03589, Prosser: WAR10F0CH, held by Bonneville Power Administration
- 2026-03-31: NEW TAHOLAH K12 SCHOOL, Taholah: WAR10I043, held by FORMA Construction Company
- 2026-04-06: JBLM PARACHUTE SURVIVAL TRAINING FACILITY, Jblm: WAR10F0CI, held by PacWest-Korte JV
- 2026-04-09: HISTORIC OXBOW REACTIVATION AND RESTORATION PROJECT, La Push: WAR10I044, held by BCI Contracting, Inc.
- 2026-04-17: NAVFAC SEISMIC REPAIR DD4 BREMERTON - TOPSIDE PAVING, Bremerton: WAR10F0CJ, held by Kiewit-Alberici Joint Venture
FRYINGPAN CREEK BRIDGE WA NP MORA 11(1) among its neighbors
1 discharge permits are in the Headwaters White River subwatershed (HUC 171100140301); WAR10F0CF is one.
What stands out
- Its term runs 323 days, March 30, 2026 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FRYINGPAN CREEK BRIDGE WA NP MORA 11(1) |
|---|---|
| Permittee | FHWA, Western Federal Lands Highway Division |
| NPDES ID | WAR10F0CF |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 30, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Packwood, WA 98361 |
| Subwatershed | Headwaters White River (HUC 171100140301) |
NPDES WAR10F0CF: effluent limits and exceedances
FRYINGPAN CREEK BRIDGE WA NP MORA 11(1) (NPDES WAR10F0CF): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES WAR10F0CF: no pollutant row on file.
NPDES WAR10F0CF: inspections, violations and enforcement
NPDES WAR10F0CF (FRYINGPAN CREEK BRIDGE WA NP MORA 11(1)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR10F0CF
NPDES WAR10F0CF: one email when its EPA record changes — $99/month.
Permits near NPDES WAR10F0CF
NPDES WAR10F0CF: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.