NPDES WAR310870 · Clean Water Act
SWEDISH FIRST HILL NORTH TOWER, Seattle, WA: NPDES WAR310870 discharge permit, effluent exceedances, inspections, penalties
SWEDISH FIRST HILL NORTH TOWER, Seattle, Washington: General permit coverage WAR310870, held by Swedish Health Services; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
2 of the 38 pollutants listed for NPDES WAR310870 have no violation or effluent exceedance.
- Total Petroleum Hydrocarbons - Waste Oil: 1 limit, 45 violations of any kind.
- Naphthalene: 1 limit, 13 violations of any kind.
- Transparency: 1 limit, 5 violations of any kind.
- Arsenic, total [as As]: 1 limit, 1 violation of any kind.
- Chromium, total [as Cr]: 1 limit, 1 violation of any kind.
- Lead, total [as Pb]: 1 limit, 1 violation of any kind.
- Silver, dissolved [as Ag]: 1 limit, 1 violation of any kind.
- Selenium, total [as Se]: 1 limit, 1 violation of any kind.
- Benzene, ethylbenzene, toluene, xylene combination: 1 limit, 1 violation of any kind.
- Acenaphthylene: 1 limit, 1 violation of any kind.
- Acenaphthene: 1 limit, 1 violation of any kind.
- Anthracene: 1 limit, 1 violation of any kind.
- Benzo[b]fluoranthene: 1 limit, 1 violation of any kind.
- Benzo[k]fluoranthene: 1 limit, 1 violation of any kind.
- Benzo[a]pyrene: 1 limit, 1 violation of any kind.
- Chrysene: 1 limit, 1 violation of any kind.
- Fluoranthene: 1 limit, 1 violation of any kind.
- Fluorene: 1 limit, 1 violation of any kind.
- Indeno[1,2,3-cd]pyrene: 1 limit, 1 violation of any kind.
- Methylene chloride: 1 limit, 1 violation of any kind.
- Phenanthrene: 1 limit, 1 violation of any kind.
- Pyrene: 1 limit, 1 violation of any kind.
- Tetrachloroethylene: 1 limit, 1 violation of any kind.
- Benzo[ghi]perylene: 1 limit, 1 violation of any kind.
- Benzo[a]anthracene: 1 limit, 1 violation of any kind.
- Dibenz[a,h]anthracene: 1 limit, 1 violation of any kind.
- Total Petroleum Hydrocarbons - Diesel: 1 limit, 1 violation of any kind.
- 1,2,4-Trimethylbenzene: 1 limit, 1 violation of any kind.
- Isopropylbenzene: 1 limit, 1 violation of any kind.
- n-Propylbenzene: 1 limit, 1 violation of any kind.
- 1,3,5-Trimethylbenzene: 1 limit, 1 violation of any kind.
- n-Butylbenzene: 1 limit, 1 violation of any kind.
- tert-Butylbenzene: 1 limit, 1 violation of any kind.
- 2-Methylnaphthalene: 1 limit, 1 violation of any kind.
- 1-Methylnaphthalene: 1 limit, 1 violation of any kind.
- Trichloroethene: 1 limit, 1 violation of any kind.
- pH: 2 limits.
- Turbidity: 1 limit.
- March 18, 2026: Evaluation (S).
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR310870.
Coverages issued nearest WAR310870
- 2020-11-18: CARTER PROPERTY SUBDIVISION, Vancouver: WAR310811, held by Carvel LLC
- 2020-11-18: DUSTY TO COLFAX-ADD CLIMBING LANES, Colfax: WAR310823, held by WSDOT
- 2020-11-18: SOCIETY PLACE PHASE II, Centralia: WAR310832, held by The Foster Group, Inc.
- 2020-11-18: BLOCK 95, Seattle: WAR310861, held by Mortenson
- 2020-11-18: CREEKSIDE COMMONS, Federal Way: WAR310863, held by LGI Homes- Washington LLC
- 2020-11-18: LOPEZ LANDING, Lopez Island: WAR310880, held by Land Resources NW, LLC
- 2020-11-18: QUAIL RIDGE, East Wenatchee: WAR310910, held by Selland Construction, Inc.
- 2020-11-18: MAPLES INVESTMENT, Kettle Falls: WAR310915
- 2020-11-18: ALLIANCE FREEZE DRY (USA) INC., Lynden: WAR310919, held by Fisher Construction Group
- 2020-11-18: SOUTH MOUNT VERNON BUSINESS PARK LOTS 2,3,6&7, Mount Vernon: WAR310927, held by Chad Fisher Construction LLC
SWEDISH FIRST HILL NORTH TOWER among its neighbors
475 discharge permits are in the Lake Washington-Sammamish River subwatershed (HUC 171100120400); WAR310870 is one.
Other permits in the Lake Washington-Sammamish River subwatershed (HUC 171100120400)
- 10400 NE 52ND STREET, Kirkland: WAR127048, minor, term to 2015-12-31
- 11040 MAIN STREET, Bellevue: WAR315164, minor, term to 2025-12-31
- 115 KV LINE SEATTLE, Seattle: WAR303474, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2, Bellevue: WAR302269, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2, Bellevue: WAR302988, minor, term to 2015-12-31
- 120TH AVE NE STAGE 2 - A, Bellevue: WAR302686, minor, term to 2015-12-31
- 124TH AVE NE PEDESTRIAN SAFETY IMPROVEMENTS, Kirkland: WAR313048, minor, term to 2025-12-31
- 145TH STREET AND I5 INTERCHANGE IMPROVEMENTS, Shoreline: WAR312278, minor, term to 2025-12-31
- 150TH AVENUE SE AT I90 ROADWAY PROJECT, Bellevue: WAR314605, minor, term to 2025-12-31
- 1740 NW MARKET ST, Seattle: WAR315491, minor, term to 2030-12-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 258 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is an inspection on March 18, 2026, 181 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SWEDISH FIRST HILL NORTH TOWER |
|---|---|
| Permittee | Swedish Health Services |
| NPDES ID | WAR310870 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Seattle, WA 98122 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lake Washington-Sammamish River (HUC 171100120400) |
NPDES WAR310870: effluent limits and exceedances
SWEDISH FIRST HILL NORTH TOWER (NPDES WAR310870): 38 pollutants on file, 38 limited; 36 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Total Petroleum Hydrocarbons - Waste Oil | 1 | 45 | 0 | ||
| Naphthalene | 1 | 13 | 0 | ||
| Transparency | 1 | 5 | 0 | ||
| Arsenic, total [as As] | 1 | 1 | 0 | ||
| Chromium, total [as Cr] | 1 | 1 | 0 | ||
| Lead, total [as Pb] | 1 | 1 | 0 | ||
| Silver, dissolved [as Ag] | 1 | 1 | 0 | ||
| Selenium, total [as Se] | 1 | 1 | 0 | ||
| Benzene, ethylbenzene, toluene, xylene combination | 1 | 1 | 0 | ||
| Acenaphthylene | 1 | 1 | 0 | ||
| Acenaphthene | 1 | 1 | 0 | ||
| Anthracene | 1 | 1 | 0 | ||
| Benzo[b]fluoranthene | 1 | 1 | 0 | ||
| Benzo[k]fluoranthene | 1 | 1 | 0 | ||
| Benzo[a]pyrene | 1 | 1 | 0 | ||
| Chrysene | 1 | 1 | 0 | ||
| Fluoranthene | 1 | 1 | 0 | ||
| Fluorene | 1 | 1 | 0 | ||
| Indeno[1,2,3-cd]pyrene | 1 | 1 | 0 | ||
| Methylene chloride | 1 | 1 | 0 | ||
| Phenanthrene | 1 | 1 | 0 | ||
| Pyrene | 1 | 1 | 0 | ||
| Tetrachloroethylene | 1 | 1 | 0 | ||
| Benzo[ghi]perylene | 1 | 1 | 0 | ||
| Benzo[a]anthracene | 1 | 1 | 0 | ||
| Dibenz[a,h]anthracene | 1 | 1 | 0 | ||
| Total Petroleum Hydrocarbons - Diesel | 1 | 1 | 0 | ||
| 1,2,4-Trimethylbenzene | 1 | 1 | 0 | ||
| Isopropylbenzene | 1 | 1 | 0 | ||
| n-Propylbenzene | 1 | 1 | 0 | ||
| 1,3,5-Trimethylbenzene | 1 | 1 | 0 | ||
| n-Butylbenzene | 1 | 1 | 0 | ||
| tert-Butylbenzene | 1 | 1 | 0 | ||
| 2-Methylnaphthalene | 1 | 1 | 0 | ||
| 1-Methylnaphthalene | 1 | 1 | 0 | ||
| Trichloroethene | 1 | 1 | 0 | ||
| pH | 2 | 0 | 0 | ||
| Turbidity | 1 | 0 | 0 |
NPDES WAR310870: inspections, violations and enforcement
NPDES WAR310870: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| March 18, 2026 | Evaluation | S |
NPDES WAR310870 (SWEDISH FIRST HILL NORTH TOWER): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR310870
NPDES WAR310870: one email when its EPA record changes — $99/month.
Permits near NPDES WAR310870
NPDES WAR310870: 38 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.