NPDES WAR310880 · Clean Water Act
LOPEZ LANDING, Lopez Island, WA: NPDES WAR310880 discharge permit, effluent exceedances, inspections, penalties
LOPEZ LANDING, Lopez Island, Washington: General permit coverage WAR310880, held by Land Resources NW, LLC; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
No violation or effluent exceedance is on file for any of the 3 pollutants listed for NPDES WAR310880.
- pH: 6 limits.
- Turbidity: 3 limits.
- Transparency: 3 limits.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR310880.
Coverages issued nearest WAR310880
- 2020-11-18: DUSTY TO COLFAX-ADD CLIMBING LANES, Colfax: WAR310823, held by WSDOT
- 2020-11-18: SOCIETY PLACE PHASE II, Centralia: WAR310832, held by The Foster Group, Inc.
- 2020-11-18: BLOCK 95, Seattle: WAR310861, held by Mortenson
- 2020-11-18: CREEKSIDE COMMONS, Federal Way: WAR310863, held by LGI Homes- Washington LLC
- 2020-11-18: SWEDISH FIRST HILL NORTH TOWER, Seattle: WAR310870, held by Swedish Health Services
- 2020-11-18: QUAIL RIDGE, East Wenatchee: WAR310910, held by Selland Construction, Inc.
- 2020-11-18: MAPLES INVESTMENT, Kettle Falls: WAR310915
- 2020-11-18: ALLIANCE FREEZE DRY (USA) INC., Lynden: WAR310919, held by Fisher Construction Group
- 2020-11-18: SOUTH MOUNT VERNON BUSINESS PARK LOTS 2,3,6&7, Mount Vernon: WAR310927, held by Chad Fisher Construction LLC
- 2020-11-18: CHE RESIDENCE, Issaquah: WAR310939
LOPEZ LANDING among its neighbors
5 discharge permits are in the Lopez Island subwatershed (HUC 171100030200); WAR310880 is one.
Other permits in the Lopez Island subwatershed (HUC 171100030200)
- FRIENDS OF LOPEZ ISLAND POOL, Lopez Island: WAR307694, minor, term to 2025-12-31
- ISLANDS MARINE CTR, Lopez: WAG030072, minor, term to 2021-07-31
- LOPEZ READY MIX INC, Lopez Island: WAG503284, minor, term to 2026-03-31
- LOPEZ SAND & GRAVEL LLC, Lopez Island: WAG503278, minor, term to 2026-03-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 258 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LOPEZ LANDING |
|---|---|
| Permittee | Land Resources NW, LLC |
| NPDES ID | WAR310880 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Lopez Island, WA 98261 |
| Subwatershed | Lopez Island (HUC 171100030200) |
NPDES WAR310880: effluent limits and exceedances
LOPEZ LANDING (NPDES WAR310880): 3 pollutants on file, 3 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 6 | 0 | 0 | ||
| Turbidity | 3 | 0 | 0 | ||
| Transparency | 3 | 0 | 0 |
NPDES WAR310880: inspections, violations and enforcement
NPDES WAR310880 (LOPEZ LANDING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR310880
NPDES WAR310880: one email when its EPA record changes — $99/month.
Permits near NPDES WAR310880
NPDES WAR310880: 3 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.