NPDES WAR313888 · Clean Water Act
US 101 SR 116 NORTH OLYMPIC PENINSULA REMOVE FISH BARRIER (TUMWATER CREEK), Port Angeles, WA: NPDES WAR313888 discharge permit, effluent exceedances, inspections, penalties
US 101 SR 116 NORTH OLYMPIC PENINSULA REMOVE FISH BARRIER (TUMWATER CREEK), Port Angeles, Washington: General permit coverage WAR313888, held by Kiewit Infrastructure West Co.; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
No violation or effluent exceedance is on file for any of the 3 pollutants listed for NPDES WAR313888.
- pH: 2 limits.
- Turbidity: 1 limit.
- Transparency: 1 limit.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR313888. Kiewit Infrastructure West Co. holds 10 permits in Washington.
Other permits held by Kiewit Infrastructure West Co.
- US 101 / GRADER & UNT TO PACIFIC OCEAN - REMOVE FISH BARRIERS (SITE 21), Forks: WAR10F09V, issued 2024-08-26
- US 101 / GRADER & UNT TO PACIFIC OCEAN - REMOVE FISH BARRIERS (SITE 21) - 01, Forks: WAR10F0BC, issued 2025-07-28
- MUD MOUNTAIN FISH PASSAGE FACILITY, Buckley: WAR10I03M, issued 2024-10-28
- SR 109/OCEAN CITY TO TAHOLAH - REMOVE FISH BARRIERS (SITES 8, 12 & 14), Moclips: WAR10I041, issued 2026-01-05
- MICROSOFT 520 BRIDGE, Redmond: WAR307891, issued 2015-11-18
- FEDERAL WAY LINK EXTENSION, Kent: WAR307947, issued 2020-11-18
- US 101 SR 116 NORTH OLYMPIC PENINSULA REMOVE FISH BARRIER (CHIMACUM CREEK), Chimacum: WAR313413, issued 2020-11-18
- US 101 SR 116 NORTH OLYMPIC PENINSULA REMOVE FISH BARRIER LEES CREEK, Port Angeles: WAR314033, issued 2020-11-18
- US 101 SR 116 NORTH OLYMPIC PENINSULA REMOVE FISH BARRIER ENNIS CREEK, Port Angeles: WAR314172, issued 2020-11-18
Coverages issued nearest WAR313888
- 2020-11-18: I-5 GRAVELLY THORNE CONNECTOR PROJECT, Lakewood: WAR313875, held by Ceccanti, Inc.
- 2020-11-18: HARMONY AT ARLINGTON, Arlington: WAR313878, held by BYK Construction, Inc.
- 2020-11-18: MILL CREEK TERRACE SUBDIVISION, Ridgefield: WAR313884, held by HSR DEV - JMA LLC
- 2020-11-18: AUTO SUPPLY STORE, Wenatchee: WAR313886, held by EGN Legacy LLC
- 2020-11-18: THE ENCLAVE AT OAK TREE, Olympia: WAR313887, held by DR Horton
- 2020-11-18: N 148TH ST NONMOTORIZED BRIDGE PH1, Shoreline: WAR313889, held by Massana Construction, Inc.
- 2020-11-18: BOTHELL 231ST SHORT PLAT, Bothell: WAR313890, held by Pentex Homes
- 2020-11-18: LYNNWOOD LINK EXTENSION, Shoreline: WAR313891, held by Absher Construction
- 2020-11-18: GLACIER POINTE AT TEHALEH - DR HORTON, Bonney Lake: WAR313892, held by SSHI, LLC dba D.R. Horton
- 2020-11-18: ROGNLIN'S RUSH ROAD PLAT, Napavine: WAR313894, held by NAPAVINE INVESTORS LLC
US 101 SR 116 NORTH OLYMPIC PENINSULA REMOVE FISH BARRIER (TUMWATER CREEK) among its neighbors
59 discharge permits are in the Ennis Creek-Frontal Port Angeles Harbor subwatershed (HUC 171100200405); WAR313888 is one. Its county: 108, 2 major; WAR313888 is minor permit.
Other permits in the Ennis Creek-Frontal Port Angeles Harbor subwatershed (HUC 171100200405)
- 10TH & M STREET PROPERTY, Port Angeles: WAR311815, minor, term to 2025-12-31
- AIRPORT ROAD LOGYARD, Port Angeles: WAR302477, minor, term to 2024-12-31
- ALPINE AUTO INC, Port Angeles: WAR003282, minor, term to 2024-12-31
- BLACK DIAMOND QUARRY, Port Angeles: WAG501513, minor, term to 2026-03-31
- BRIX MARINE, Port Angeles: WAR316046, minor, term to 2030-12-31
- CLALLAM COUNTY PW MORSE CREEK PIT, Port Angeles: WAG501282, minor, term to 2026-03-31
- CLALLAM TRANSIT SYSTEM ADM MTCE OP, Port Angeles: WAR001767, minor, term to 2024-12-31
- CSO PHASE 2/FRONT STREET STORMWATER, Port Angeles: WAR302671, minor, term to 2015-12-31
- DELHUR INDUSTRIES ANGELES CONCRETE, Port Angeles: WAG501485, minor, term to 2026-03-31
- ECLIPSE LOG YARD EVERGREEN FIBRE IN, Port Angeles: WAR000861, minor, term to 2024-12-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 287 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | US 101 SR 116 NORTH OLYMPIC PENINSULA REMOVE FISH BARRIER (TUMWATER CREEK) |
|---|---|
| Permittee | Kiewit Infrastructure West Co. |
| NPDES ID | WAR313888 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Port Angeles, WA 98363 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Ennis Creek-Frontal Port Angeles Harbor (HUC 171100200405) |
| SIC | 1794 – Excavation Work |
NPDES WAR313888: effluent limits and exceedances
US 101 SR 116 NORTH OLYMPIC PENINSULA REMOVE FISH BARRIER (TUMWATER CREEK) (NPDES WAR313888): 3 pollutants on file, 3 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 2 | 0 | 0 | ||
| Turbidity | 1 | 0 | 0 | ||
| Transparency | 1 | 0 | 0 |
NPDES WAR313888: inspections, violations and enforcement
NPDES WAR313888 (US 101 SR 116 NORTH OLYMPIC PENINSULA REMOVE FISH BARRIER (TUMWATER CREEK)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES WAR313888