Velarion Records
Free: one email when NPDES WAR314130 changes. Unsubscribe any time.

NPDES WAR314130 · Clean Water Act

BIG QUILCENE RIVER BRIDGE REPLACEMENT PROJECT, Quilcene, WA: NPDES WAR314130 discharge permit, effluent exceedances, inspections, penalties

BIG QUILCENE RIVER BRIDGE REPLACEMENT PROJECT, Quilcene, Washington: General permit coverage WAR314130, held by Jamestown S'Klallam Tribe; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.

  • pH: 6 limits, 18 violations of any kind.
  • Transparency: 3 limits, 13 violations of any kind.
  • Turbidity: 3 limits, 9 violations of any kind.

Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR314130.

Coverages issued nearest WAR314130

Other permits in Quilcene

What stands out

  • Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 287 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityBIG QUILCENE RIVER BRIDGE REPLACEMENT PROJECT
PermitteeJamestown S'Klallam Tribe
NPDES IDWAR314130
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedNovember 18, 2020
ExpiresDecember 31, 2025
AgencyState
AddressQuilcene, WA 98376
SIC1794 – Excavation Work

NPDES WAR314130: effluent limits and exceedances

BIG QUILCENE RIVER BRIDGE REPLACEMENT PROJECT (NPDES WAR314130): 3 pollutants on file, 3 limited; 3 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
pH6180
Transparency3130
Turbidity390

NPDES WAR314130: inspections, violations and enforcement

NPDES WAR314130 (BIG QUILCENE RIVER BRIDGE REPLACEMENT PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES WAR314130

NPDES WAR314130: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES WAR314130

NPDES WAR314130: 3 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.