NPDES WAR314131 · Clean Water Act
PARCEL 105 DREDGE MATERIAL MANAGEMENT PROJECT, Tacoma, WA: NPDES WAR314131 discharge permit, effluent exceedances, inspections, penalties
PARCEL 105 DREDGE MATERIAL MANAGEMENT PROJECT, Tacoma, Washington: General permit coverage WAR314131, held by Port of Tacoma; Construction stormwater; Administratively continued; issued November 18, 2020, term to December 31, 2025, by State.
- pH: 2 limits, 2 violations of any kind.
- Turbidity: 1 limit, 1 violation of any kind.
- September 16, 2026: State CWA Non Penalty AO (State).
- September 2, 2026: State CWA Non Penalty AO (State).
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR314131. Port of Tacoma holds 11 permits in Washington.
Other permits held by Port of Tacoma
- MAYTOWN AGGREGATES, Tenino: WAG501520, issued 2021-02-17
- PORT OF TACOMA PARCEL 88 NORTH, Tacoma: WAG501539, issued 2021-02-17
- EAST BLAIR 1 TERMINAL, Tacoma: WAR011540, issued 2019-11-20
- NORTH INTERMODAL YARD & TERMINAL 7, Tacoma: WAR012408, issued 2019-11-20
- SOUTH INTERMODAL YARD, Tacoma: WAR125126, issued 2019-11-20
- MARSHALL AVE AUTO FACILITY PAVEMENT REPAIR PROJECT, Tacoma: WAR315654, issued 2025-11-19
- ARKEMA INTERIM ACTION PHASE 1 CONTAINMENT WALL, Tacoma: WAR315655, issued 2025-11-19
- HYLEBOS MARSH INTERIM ACTION, Tacoma: WAR315656, issued 2025-11-19
- HUSKY TERMINAL AREAS A5 & A6 PAVEMENT REPAIR PROJECT, Tacoma: WAR315747, issued 2025-11-19
- PARCEL 12 SITE CLEANUP AND TREE REMOVAL PROJECT, Tacoma: WAR315791, issued 2025-11-19
Coverages issued nearest WAR314131
- 2020-11-18: BICKFORD MOTORS SHOP - 23F040, Snohomish: WAR314124, held by Fisher Construction Group, Inc.
- 2020-11-18: BIG PICTURE SCHOOL, Bellevue: WAR314125, held by Bellevue School District
- 2020-11-18: US 2 SEXTON CREEK TO PILCHUCK RIVER FISH PASSAGE, Snohomish: WAR314127, held by Scarsella Bros., Inc.
- 2020-11-18: BELLIS FAIR BUILDING 1 – FAMILY HOUSING & ELC, Bellingham: WAR314128, held by Dawson Construction
- 2020-11-18: BIG QUILCENE RIVER BRIDGE REPLACEMENT PROJECT, Quilcene: WAR314130, held by Jamestown S'Klallam Tribe
- 2020-11-18: GARFIELD SUPER BLOCK, Seattle: WAR314132, held by Seattle Parks & Recreation
- 2020-11-18: ERICKSON ESTATES, Kent: WAR314133, held by Soma Homes LLC
- 2020-11-18: SE 172ND ST WATER QUALITY RETROFIT PROJECT, Renton: WAR314135, held by OMA Construction, Inc.
- 2020-11-18: BURHANI SHORT PLAT, Redmond: WAR314137, held by PSR Redmond, LLC
- 2020-11-18: VRFA FIRE STATION 36, Auburn: WAR314138, held by Swinerton Builders
PARCEL 105 DREDGE MATERIAL MANAGEMENT PROJECT among its neighbors
166 discharge permits are in the Hylebos Creek-Frontal Commencement Bay subwatershed (HUC 171100190205); WAR314131 is one. Its county: 662, 9 major; WAR314131 is minor permit.
Other permits in the Hylebos Creek-Frontal Commencement Bay subwatershed (HUC 171100190205)
- 1ST AVE DEVELOPMENT, Federal Way: WAR313591, minor, term to 2025-12-31
- 1ST AVE S AT S 328TH STREET INTERSECTION, Federal Way: WAR303102, minor, term to 2015-12-31
- 4TH STREET FILL AND GRADE, Fife: WAR126965, minor, term to 2020-12-30
- ACD GRADE & FILL, Bonney Lake: WAR303454, minor, term to 2015-12-31
- AERIE CREST, Milton: WAR302511, minor, term to 2015-12-31
- AMAZON.COM SERVICES LLC SWA4, Federal Way: WAR315229, minor, term to 2029-12-31
- AMERICOLD, Fife: WAR126724, minor, term to 2024-12-31
- AMSA 137/PIER 23, Tacoma: WANOEFA07, minor, term to 2030-07-14
- ARCLIN SURFACES, Tacoma: WAR001441, minor, term to 2024-12-31
- ARCTIC GLACIER, Fife: WAR125686, minor, term to 2024-12-31
What stands out
- Its term runs 5 years and 43 days, November 18, 2020 to December 31, 2025; the term ended 258 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a formal enforcement action on September 16, 2026.
- In the 365 days to September 15, 2026, it was dated 1 formal enforcement action.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 8,573 discharge permits on the register in Washington; 4,744 of them (55%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PARCEL 105 DREDGE MATERIAL MANAGEMENT PROJECT |
|---|---|
| Permittee | Port of Tacoma |
| NPDES ID | WAR314131 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2020 |
| Expires | December 31, 2025 |
| Agency | State |
| Address | Tacoma, WA 98421 |
| Subwatershed | Hylebos Creek-Frontal Commencement Bay (HUC 171100190205) |
NPDES WAR314131: effluent limits and exceedances
PARCEL 105 DREDGE MATERIAL MANAGEMENT PROJECT (NPDES WAR314131): 2 pollutants on file, 2 limited; 2 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| pH | 2 | 2 | 0 | ||
| Turbidity | 1 | 1 | 0 |
NPDES WAR314131: inspections, violations and enforcement
NPDES WAR314131: 2 formal enforcement actions
0 of them with a penalty assessed. How penalties are shown.
| Date | What EPA recorded | Agency | Federal penalty | State or local penalty |
|---|---|---|---|---|
| September 16, 2026 | State CWA Non Penalty AO | State | ||
| September 2, 2026 | State CWA Non Penalty AO | State |
NPDES WAR314131 (PARCEL 105 DREDGE MATERIAL MANAGEMENT PROJECT): no single-event violation, inspection and informal enforcement action on file.
Watch NPDES WAR314131
NPDES WAR314131: one email when its EPA record changes — $99/month.
Permits near NPDES WAR314131
NPDES WAR314131: 2 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.