The Pay Desk is the free weekly executive pay briefing — one company at a time, every number traceable to a public filing.You’ll confirm on The Pay Desk’s sign-up page.
Watershed · by permit class
General discharge permits in subbasin 16030001
- 19Permits
- 19Permits in the subbasin
- 1States the subbasin touches
19 of the 19 Clean Water Act discharge permits in hydrologic subbasin 16030001 are filed as General. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in UT.
A cut is one value of one dimension of a subbasin — General, under permit class. This page holds the permits in subbasin 16030001 that carry that value: 19 of the 19 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- UT 19 permits in the subbasin
Other cuts of subbasin 16030001
- program: Storm Water Construction 12
- program: Storm Water Industrial 4
- major or minor: Minor dischargers 17
- permit type: General permit coverage 19
Every discharge permit in subbasin 16030001 →
Figures from EPA’s ICIS-NPDES download.