NPDES AKR10H0AY · Clean Water Act
SELAWIK BARGE LANDING ACCESS ROAD & BOARDWALK IMPROVEMENTS, Selawik, AK: NPDES AKR10H0AY discharge permit, effluent exceedances, inspections, penalties
SELAWIK BARGE LANDING ACCESS ROAD & BOARDWALK IMPROVEMENTS, Selawik, Alaska: General permit coverage AKR10H0AY, held by Joseph P. Kemp, P.E.; Construction stormwater; Effective; issued June 30, 2023, term to January 31, 2026, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 433 were issued before AKR10H0AY. Joseph P. Kemp, P.E. holds 3 permits in Alaska.
Other permits held by Joseph P. Kemp, P.E.
- POINT HOPE AIRPORT REALIGNMENT, Point Hope: AKR10H05V, issued 2023-03-07
- COPPER RIVER BOAT LAUNCH FACILITIES IMPROVEMENTS, Chitina: AKR10H0D9, issued 2023-08-18
Coverages issued nearest AKR10H0AY
- 2023-06-23: NIL003 NINILCHIK HARBOR REVETMENT REPLACEMENT, Ninilchick: AKR10H03T, held by James Sauceda
- 2023-06-23: HN2325 2023-2025 MAINTENANCE DREDGING HOMER&NINILCHIK, Homer: AKR10H06M, held by James Sauceda
- 2023-06-23: COSTCO #10 - DIMOND, Anchorage: AKR10H0AM, held by Mostafa Ahanchi
- 2023-06-28: GLENN PARKS INTERCHANGE REPAIRS NOV 2018 EQ PR, Palmer: AKR10GO51, held by John Binder
- 2023-06-28: MULDOON ROAD - DEBARR RD TO E 36TH AVE PAVEMENT PRESERVATION, Anchorage: AKR10H04K, held by John Binder
- 2023-07-06: NAVIGATION CENTER MOA, Anchorage: AKR10H04F, held by Shay Throop
- 2023-07-06: FUNNY RIVER RD. & COHOE LOOP RD. PAVEMENT PRESERVATION, Soldotna: AKR10H089, held by Troy Gray
- 2023-07-06: BEACH ROAD REPAIRS, Haines: AKR10H0B1, held by Roger Schnabel
- 2023-07-07: KENAI LAKE WORK CENTER: WATER AND WASTEWATER SYSTEM IMPROVEMENTS, Seward: AKR10H0B6, held by Royce Drennon
- 2023-07-07: BEACH ROAD REPAIRS, Haines: AKR10H0B8, held by Ed Coffland
SELAWIK BARGE LANDING ACCESS ROAD & BOARDWALK IMPROVEMENTS among its neighbors
Its county: 54, 1 major; AKR10H0AY is minor permit.
Other permits in the county
- ALASKA AIRLINES KOTZEBUE STATION, Kotzebue: AKR06AC05, minor, term to 2025-03-31
- AMBLER GRAVEL QUARRY, ROAD AND FUEL TANK FARM PROJECTS, Ambler: AKR10GM80, minor, term to 2026-01-31
- ANARRAAQ AND AKTIGIRUQ EXPLORATION ACCESS ROAD, Kivalina: AKR06AF84, minor, term to 2025-03-31
- ASRC SKW ESKIMOS INC WWTF, Kivalina: AKG572096, minor, term to 2022-09-30
- BI NIMIUK POINT MATERIAL SITE, Kotzebue: AKR10H15Y, minor, term to 2031-01-31
- BUCKLAND AIRPORT IMPROVEMENTS, Buckland: AKR10H161, minor, term to 2031-01-31
- BUCKLAND AIRPORT IMPROVEMENTS, Buckland: AKR10H165, minor, term to 2031-01-31
- BUCKLAND LAGOON, Buckland: AKG573028, minor, term to 2023-08-31
- COMMUNITY WIDE DRAINAGE PROJECT, Kiana: AKR10H0VF, minor, term to 2026-01-31
- DEERING AIRPORT IMPROVEMENTS, Deering: AKR10H10P, minor, term to 2031-01-31
What stands out
- Its term runs 2 years and 215 days, June 30, 2023 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SELAWIK BARGE LANDING ACCESS ROAD & BOARDWALK IMPROVEMENTS |
|---|---|
| Permittee | Joseph P. Kemp, P.E. |
| NPDES ID | AKR10H0AY |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 30, 2023 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Selawik, AK 99770 |
NPDES AKR10H0AY: effluent limits and exceedances
SELAWIK BARGE LANDING ACCESS ROAD & BOARDWALK IMPROVEMENTS (NPDES AKR10H0AY): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H0AY: no pollutant row on file.
NPDES AKR10H0AY: inspections, violations and enforcement
NPDES AKR10H0AY (SELAWIK BARGE LANDING ACCESS ROAD & BOARDWALK IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H0AY
NPDES AKR10H0AY: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H0AY
NPDES AKR10H0AY: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.