NPDES AKR10H0X2 · Clean Water Act
DALTON HIGHWAY MP 90-104 RESURFACING, Fairbanks, AK: NPDES AKR10H0X2 discharge permit, effluent exceedances, inspections, penalties
DALTON HIGHWAY MP 90-104 RESURFACING, Fairbanks, Alaska: General permit coverage AKR10H0X2, held by Kodi Long; Construction stormwater; Administratively continued; issued November 5, 2025, term to January 31, 2026, by Alaska Department of Environmental Conservation; Highway, Street, and Bridge Construction.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 940 were issued before AKR10H0X2. Kodi Long holds 8 permits in Alaska.
Other permits held by Kodi Long
- RUSSIAN RIVER CAMPGROUND ACCESS PHASE 2, Cooper Landing: AKR10H062, issued 2024-10-24
- CURRY QUARRY BALLAST PRODUCTION - 2023, Curry: AKR10H07Y, issued 2023-10-25
- ELLIOTT HIGHWAY MILEPOST 51-63 REHABILITATION PROJECT NO. 0651032/NFHWY00420, Livengood: AKR10H0CM, issued 2023-08-09
- ALASKA HIGHWAY MP 1235-1268 REHABILITATION (CONST MP 1252-1268), Northway: AKR10H0NJ, issued 2025-07-11
- RUBY SLOUGH ROAD REHABILITATION, Ruby: AKR10H0UL, issued 2025-05-26
- RUBY SLOUGH ROAD CONTRACTOR-PROVIDED SUPPORT SITES, Ruby: AKR10H0UM, issued 2025-05-26
- ELLIOTT HIGHWAY MP 43-51 RESURFACING, Livwengood: AKR10H149, issued 2026-06-02
Coverages issued nearest AKR10H0X2
- 2025-10-30: DEEP CREEK SRA FACILITY REHABILITATION, Ninilchik: AKR10H0WZ, held by Rys Miranda
- 2025-10-30: KASILOF RIVER SRS PARKING IMPROVEMENTS 2025, Kasilof: AKR10H0Y0, held by Rys Miranda
- 2025-10-30: STIBIUM TRAIL, Skwentna: AKR10H0ZX, held by Hans Hoffman
- 2025-11-03: INDIAN PASS TRAIL, Indian: AKR10H0ZZ, held by Jon Underwood
- 2025-11-04: RECONSTRUCT NORTH HELEN LANE, Wasilla: AKR10H0VA, held by Morgan Jordan
- 2025-11-06: NC MACHINERY, Anchorage: AKR10H100, held by Scott Dunlap
- 2025-11-07: MANH CHOH MINE DEVELOPMENT, Tok: AKR10H08S, held by Kirk Rich
- 2025-11-10: KOKHANOK SOLAR PV, Kokhanok: AKR10H101, held by Lysa Aguiar
- 2025-11-11: AOGCC ORPHAN WELL PLUGGING AND REMEDIATION PROGRAM ROSETTA AND CORE HOLE SITES P, Houston: AKR10H0QA, held by Jeff Miller
- 2025-11-12: LEGACY HILLS ESTATE, Wasilla: AKR10H070, held by Tod Blohm
DALTON HIGHWAY MP 90-104 RESURFACING among its neighbors
Its county: 111, 0 major; AKR10H0X2 is minor permit.
Other permits in the county
- ALAN R. NEWBY SR / LITTLE BOULDER CREEK, Unknown: AKG370430, minor, term to 2010-10-07
- ARMSTRONG NOLAN CREEK MINE SITE, Bettles: AKG370D89, minor, term to 2026-02-28
- BARRY L. CLAY / SWIFT CREEK (SETTLING POND), Unknown: AKG370384, minor, term to 2010-10-07
- BARRY LAMBETH / JENNI CREEK, Unknown: AKG370574, minor, term to 2005-10-03
- BEATON PATH NUGGET CREEK MINE SITE, Circle: AKG370A31, minor, term to 2014-10-31
- BENNETT LONG CREEK DRAINAGE MINE SITE, Ruby: AKG370C88, minor, term to 2020-07-31
- BLACKWELL K-12 RENOVATION PHASE 1, Anvik: AKR10H0QZ, minor, term to 2026-01-31
- BOREAL RESOURCES INC / JIM PUP CREEK, Unknown: AKG370404, minor, term to 2014-10-31
- BRADY GOLD DUST CREEK MINE SITE, Central: AKG370C44, minor, term to 2020-07-31
- CHALKYITSIK AIRPORT IMPROVEMENTS, Chalkyitsik: AKR10H0HK, minor, term to 2026-01-31
What stands out
- Its term runs 87 days, November 5, 2025 to January 31, 2026; the term ended 256 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DALTON HIGHWAY MP 90-104 RESURFACING |
|---|---|
| Permittee | Kodi Long |
| NPDES ID | AKR10H0X2 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 5, 2025 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Fairbanks, AK 99701 |
| NAICS | 237310 – Highway, Street, and Bridge Construction |
| SIC | 1611 – Highway And Street Construction |
NPDES AKR10H0X2: effluent limits and exceedances
DALTON HIGHWAY MP 90-104 RESURFACING (NPDES AKR10H0X2): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H0X2: no pollutant row on file.
NPDES AKR10H0X2: inspections, violations and enforcement
NPDES AKR10H0X2 (DALTON HIGHWAY MP 90-104 RESURFACING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H0X2
NPDES AKR10H0X2: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H0X2
NPDES AKR10H0X2: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.