NPDES AKR10H149 · Clean Water Act
ELLIOTT HIGHWAY MP 43-51 RESURFACING, Livwengood, AK: NPDES AKR10H149 discharge permit, effluent exceedances, inspections, penalties
ELLIOTT HIGHWAY MP 43-51 RESURFACING, Livwengood, Alaska: General permit coverage AKR10H149, held by Kodi Long; Construction stormwater; Effective; issued June 2, 2026, term to January 31, 2031, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 1,178 were issued before AKR10H149. Kodi Long holds 8 permits in Alaska.
Other permits held by Kodi Long
- RUSSIAN RIVER CAMPGROUND ACCESS PHASE 2, Cooper Landing: AKR10H062, issued 2024-10-24
- CURRY QUARRY BALLAST PRODUCTION - 2023, Curry: AKR10H07Y, issued 2023-10-25
- ELLIOTT HIGHWAY MILEPOST 51-63 REHABILITATION PROJECT NO. 0651032/NFHWY00420, Livengood: AKR10H0CM, issued 2023-08-09
- ALASKA HIGHWAY MP 1235-1268 REHABILITATION (CONST MP 1252-1268), Northway: AKR10H0NJ, issued 2025-07-11
- RUBY SLOUGH ROAD REHABILITATION, Ruby: AKR10H0UL, issued 2025-05-26
- RUBY SLOUGH ROAD CONTRACTOR-PROVIDED SUPPORT SITES, Ruby: AKR10H0UM, issued 2025-05-26
- DALTON HIGHWAY MP 90-104 RESURFACING, Fairbanks: AKR10H0X2, issued 2025-11-05
Coverages issued nearest AKR10H149
- 2026-05-28: KRSMA KENAI RIVER FLATS, Kenai: AKR10H0YS, held by Rys Miranda
- 2026-05-28: GLOBALSTAR WASILLA GATEWAY EXPANSION, Wasilla: AKR10H146, held by Randi Bernier
- 2026-05-29: MATSON FAIRBANKS, Fairbanks: AKR10H147, held by Dave O'Donnell
- 2026-06-01: WHITTIER STANDBY GENERATORS, Portage Valley: AKR10H148, held by Doug Fell
- 2026-06-02: SEARHC HAINES MEDICAL CAMPUS, Haines: AKR10H0ZP, held by Dakota LaFramboise
- 2026-06-02: JBR050 AKARNG MAINTENANCE HANGAR, Jber: AKR10H14A, held by Jim Jeffords
- 2026-06-02: NOME TO HOMER T3-T4, King Salmon: AKR10H14B, held by Kurt Anderson
- 2026-06-02: WHITTIER TUNNEL STANDBY GENERATORS, Portage Valley: AKR10H14C, held by Eric Hershey
- 2026-06-02: TAXIWAY K TUG RD IMPROVEMENTS, Anchorage: AKR10H14D, held by Stephanie Lewinski
- 2026-06-02: SHAW ELEMENTARY FOXTROT EXTENSION, Wasilla: AKR10H14E, held by Ryan Moren
ELLIOTT HIGHWAY MP 43-51 RESURFACING among its neighbors
Its county: 111, 0 major; AKR10H149 is minor permit.
Other permits in the county
- ALAN R. NEWBY SR / LITTLE BOULDER CREEK, Unknown: AKG370430, minor, term to 2010-10-07
- ARMSTRONG NOLAN CREEK MINE SITE, Bettles: AKG370D89, minor, term to 2026-02-28
- BARRY L. CLAY / SWIFT CREEK (SETTLING POND), Unknown: AKG370384, minor, term to 2010-10-07
- BARRY LAMBETH / JENNI CREEK, Unknown: AKG370574, minor, term to 2005-10-03
- BEATON PATH NUGGET CREEK MINE SITE, Circle: AKG370A31, minor, term to 2014-10-31
- BENNETT LONG CREEK DRAINAGE MINE SITE, Ruby: AKG370C88, minor, term to 2020-07-31
- BLACKWELL K-12 RENOVATION PHASE 1, Anvik: AKR10H0QZ, minor, term to 2026-01-31
- BOREAL RESOURCES INC / JIM PUP CREEK, Unknown: AKG370404, minor, term to 2014-10-31
- BRADY GOLD DUST CREEK MINE SITE, Central: AKG370C44, minor, term to 2020-07-31
- CHALKYITSIK AIRPORT IMPROVEMENTS, Chalkyitsik: AKR10H0HK, minor, term to 2026-01-31
What stands out
- Its term runs 4 years and 243 days, June 2, 2026 to January 31, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ELLIOTT HIGHWAY MP 43-51 RESURFACING |
|---|---|
| Permittee | Kodi Long |
| NPDES ID | AKR10H149 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 2, 2026 |
| Expires | January 31, 2031 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Livwengood, AK 99790 |
NPDES AKR10H149: effluent limits and exceedances
ELLIOTT HIGHWAY MP 43-51 RESURFACING (NPDES AKR10H149): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H149: no pollutant row on file.
NPDES AKR10H149: inspections, violations and enforcement
NPDES AKR10H149 (ELLIOTT HIGHWAY MP 43-51 RESURFACING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H149
NPDES AKR10H149: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H149
NPDES AKR10H149: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.