NPDES AKR10H151 · Clean Water Act
HEALY CENTER PIT RD, Healy, AK: NPDES AKR10H151 discharge permit, effluent exceedances, inspections, penalties
HEALY CENTER PIT RD, Healy, Alaska: General permit coverage AKR10H151, held by Ryan Moren; Construction stormwater; Effective; issued June 15, 2026, term to January 31, 2031, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 1,202 were issued before AKR10H151. Ryan Moren holds 32 permits in Alaska.
Other permits held by Ryan Moren
- TAXIWAY R N AND TXLN U DEWATERING, Anchorage: AKG002362, issued 2025-09-26
- PORT OF ALASKA STORM DRAIN SYSTEM 001 AND 002, Anchorage: AKG002408, issued 2026-04-28
- PORT OF ALASKA MODERNIZATION PROGRAM TERMINAL 1, Anchorage: AKG002410, issued 2026-04-28
- POA ELECTRICAL SUBSTATION, Anchorage: AKG002426, issued 2026-08-19
- AMATS DOWNTOWN TRAIL CONNECTION, Anchorage: AKG002432, issued 2026-08-11
- KNIK-GOOSE BAY RD RECONSTRUCTION PHASE 1: FAIRVIEW LOOP TO CENTAUR AVE, Wasilla: AKR10H02E, issued 2025-04-18
- RICHARDSON HIGHWAY MP 128-138 REHABILITATION, N/A: AKR10H08D, issued 2024-04-16
- GLENN HWY PARKS TO S. INNER SPRINGER LOOP (PHASE II), Palmer: AKR10H0DC, issued 2026-03-11
- SEWARD HIGHWAY MP75-90 PH III, Girdwood: AKR10H0JK, issued 2025-05-07
- NORTHERN LIGHTS BLVD, LAKE OTIS TO BRAGAW, Anchorage: AKR10H0N0, issued 2024-08-01
Coverages issued nearest AKR10H151
- 2026-06-09: FNSB ANIMAL SHELTER, Fairbanks: AKR10H14U, held by David Bredlie
- 2026-06-10: KODIAK REZANOF DRIVE RESURFACING: W. MARINE WAY TO AIRPORT, Kodiak: AKR10H14W, held by Louis Rocheleau
- 2026-06-10: FORT WAINWRIGHT - SANTIAGO AVENUE, Fort Wainwright: AKR10H14X, held by Rosemary Myrick
- 2026-06-11: KODIAK REZANOF DRIVE RESURFACING: W. MARINE WAY TO AIRPORT, Kodiak: AKR10H14Y, held by Vicky Roberts
- 2026-06-15: CONE GRAVEL PIT, Kenai: AKR10H150, held by TODD PORTER
- 2026-06-15: VALDEZ PAVEMENT MANAGEMENT - PHASE IV, Valdez: AKR10H152, held by Bruce Van Buskirk
- 2026-06-16: SEWARD HIGHWAY MP90-99 PAVEMENT PRESERVATION PH.I, Girdwood: AKR10H153, held by Ryan Moren
- 2026-06-18: SEWARD HIGHWAY MP 90-99 PAVEMENT PRESERVATION PH.I, Girdwood: AKR10H155, held by Katherine Keith
- 2026-06-18: BIRCH MEADOWS, Anchorage: AKR10H156, held by Brandyn Roth
- 2026-06-19: JOHNSON BIVOUAC, Salcha: AKR10H157, held by Angie Hawks
HEALY CENTER PIT RD among its neighbors
Its county: 33, 2 major; AKR10H151 is minor permit.
Other permits in the county
- ALASKA WASTE HEALY, Healy: AKNOE0189, minor, term to 2023-08-24
- BATES TOTATLANIKA RIVER DRAINAGE MINE SITE, Healy: AKG370D63, minor, term to 2026-02-28
- CLR046-048 REPAIR WATER AND WASTEWATER SYSTEMS, Clear: AKR10GN75, minor, term to 2026-01-31
- CRIPPLE CREEK PIT RECLAMATION PHASE I 52959-3, Healy: AKR10GI14, minor, term to 2026-01-31
- CRIPPLE CREEK PIT RECLAMATION PHASE II, Healy: AKR10H0M8, minor, term to 2026-01-31
- CRIPPLE CREEK PIT RECLAMATION PHASE II, Healy: AKR10H0M9, minor, term to 2031-01-31
- CRIPPLE CREEK ROAD STABILIZATION & COAL CREEK CROSSING PROJECT NO. 52959-5, Healy: AKR10H0AA, minor, term to 2026-01-31
- DENALI GRIZZLY BEAR RESORT WWTF, Denali: AKG572012, minor, term to 2022-09-30
- DENALI NATIONAL PARK - FRONT COUNTRY WASTEWATER TREATMENT LAGOON, Denali National Park: AK0053775, minor, term to 2024-08-31
- DENALI PARK VILLAGE RESORT WWTF, Denali: AKG572059, minor, term to 2027-12-31
What stands out
- Its term runs 4 years and 230 days, June 15, 2026 to January 31, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HEALY CENTER PIT RD |
|---|---|
| Permittee | Ryan Moren |
| NPDES ID | AKR10H151 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 15, 2026 |
| Expires | January 31, 2031 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Healy, AK 99743 |
NPDES AKR10H151: effluent limits and exceedances
HEALY CENTER PIT RD (NPDES AKR10H151): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H151: no pollutant row on file.
NPDES AKR10H151: inspections, violations and enforcement
NPDES AKR10H151 (HEALY CENTER PIT RD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H151
NPDES AKR10H151: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H151
NPDES AKR10H151: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.