NPDES AKR10H153 · Clean Water Act
SEWARD HIGHWAY MP90-99 PAVEMENT PRESERVATION PH.I, Girdwood, AK: NPDES AKR10H153 discharge permit, effluent exceedances, inspections, penalties
SEWARD HIGHWAY MP90-99 PAVEMENT PRESERVATION PH.I, Girdwood, Alaska: General permit coverage AKR10H153, held by Ryan Moren; Construction stormwater; Effective; issued June 16, 2026, term to January 31, 2031, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 1,205 were issued before AKR10H153. Ryan Moren holds 32 permits in Alaska.
Other permits held by Ryan Moren
- TAXIWAY R N AND TXLN U DEWATERING, Anchorage: AKG002362, issued 2025-09-26
- PORT OF ALASKA STORM DRAIN SYSTEM 001 AND 002, Anchorage: AKG002408, issued 2026-04-28
- PORT OF ALASKA MODERNIZATION PROGRAM TERMINAL 1, Anchorage: AKG002410, issued 2026-04-28
- POA ELECTRICAL SUBSTATION, Anchorage: AKG002426, issued 2026-08-19
- AMATS DOWNTOWN TRAIL CONNECTION, Anchorage: AKG002432, issued 2026-08-11
- KNIK-GOOSE BAY RD RECONSTRUCTION PHASE 1: FAIRVIEW LOOP TO CENTAUR AVE, Wasilla: AKR10H02E, issued 2025-04-18
- RICHARDSON HIGHWAY MP 128-138 REHABILITATION, N/A: AKR10H08D, issued 2024-04-16
- GLENN HWY PARKS TO S. INNER SPRINGER LOOP (PHASE II), Palmer: AKR10H0DC, issued 2026-03-11
- SEWARD HIGHWAY MP75-90 PH III, Girdwood: AKR10H0JK, issued 2025-05-07
- NORTHERN LIGHTS BLVD, LAKE OTIS TO BRAGAW, Anchorage: AKR10H0N0, issued 2024-08-01
Coverages issued nearest AKR10H153
- 2026-06-10: FORT WAINWRIGHT - SANTIAGO AVENUE, Fort Wainwright: AKR10H14X, held by Rosemary Myrick
- 2026-06-11: KODIAK REZANOF DRIVE RESURFACING: W. MARINE WAY TO AIRPORT, Kodiak: AKR10H14Y, held by Vicky Roberts
- 2026-06-15: CONE GRAVEL PIT, Kenai: AKR10H150, held by TODD PORTER
- 2026-06-15: HEALY CENTER PIT RD, Healy: AKR10H151, held by Ryan Moren
- 2026-06-15: VALDEZ PAVEMENT MANAGEMENT - PHASE IV, Valdez: AKR10H152, held by Bruce Van Buskirk
- 2026-06-18: SEWARD HIGHWAY MP 90-99 PAVEMENT PRESERVATION PH.I, Girdwood: AKR10H155, held by Katherine Keith
- 2026-06-18: BIRCH MEADOWS, Anchorage: AKR10H156, held by Brandyn Roth
- 2026-06-19: JOHNSON BIVOUAC, Salcha: AKR10H157, held by Angie Hawks
- 2026-06-19: EAGLE RIVER UNDERGROUND: CITATION DR AND VFW LOOPING, Eagle River: AKR10H158, held by Josh Henrick
- 2026-06-22: CEA BELUGA SOLAR EXPANSION DISTRIBUTION, Beluga: AKR10H15A, held by Kcie Kolbeck
SEWARD HIGHWAY MP90-99 PAVEMENT PRESERVATION PH.I among its neighbors
19 discharge permits are in the Turnagain Arm subwatershed (HUC 190203020705); AKR10H153 is one. Its county: 555, 4 major; AKR10H153 is minor permit.
Other permits in the Turnagain Arm subwatershed (HUC 190203020705)
- ALPINE VIEW CHALETS, Girdwood: AKR10H0RB, minor, term to 2026-01-31
- ANCHORAGE AREA DRAINAGE IMPROVEMENTS, Anchorage: AKR10H03Q, minor, term to 2026-01-31
- ANCHORAGE AREA DRAINAGE IMPROVEMENTS FY2019, Anchorage: AKR10H03M, minor, term to 2026-01-31
- BIRD CREEK, Bird Creek: AKR10H0UA, minor, term to 2026-01-31
- GWID TRANSMISSION LINE GIRDWOOD TO INDIAN, Girdwood: AKR10H104, minor, term to 2031-01-31
- HOPE HIGHWAY MP 12.9 PIPE REPLACEMENT, Hope: AKR10H0Y6, minor, term to 2031-01-31
- HOPE HIGHWAY MP 12.9 PIPE REPLACEMENT, Hope: AKR10H0YD, minor, term to 2031-01-31
- HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage: AKR10GI41, minor, term to 2026-01-31
- HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage: AKR10GI51, minor, term to 2026-01-31
- QUARTZ CREEK TRANSMISSION LINE REBUILD GIRDWOOD TO INDIAN, Anchorage: AKR10H0G0, minor, term to 2026-01-31
What stands out
- Its term runs 4 years and 229 days, June 16, 2026 to January 31, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SEWARD HIGHWAY MP90-99 PAVEMENT PRESERVATION PH.I |
|---|---|
| Permittee | Ryan Moren |
| NPDES ID | AKR10H153 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 16, 2026 |
| Expires | January 31, 2031 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Girdwood, AK 99587 |
| Subwatershed | Turnagain Arm (HUC 190203020705) |
NPDES AKR10H153: effluent limits and exceedances
SEWARD HIGHWAY MP90-99 PAVEMENT PRESERVATION PH.I (NPDES AKR10H153): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H153: no pollutant row on file.
NPDES AKR10H153: inspections, violations and enforcement
NPDES AKR10H153 (SEWARD HIGHWAY MP90-99 PAVEMENT PRESERVATION PH.I): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H153
NPDES AKR10H153: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H153
NPDES AKR10H153: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.