NPDES AKR10H155 · Clean Water Act
SEWARD HIGHWAY MP 90-99 PAVEMENT PRESERVATION PH.I, Girdwood, AK: NPDES AKR10H155 discharge permit, effluent exceedances, inspections, penalties
SEWARD HIGHWAY MP 90-99 PAVEMENT PRESERVATION PH.I, Girdwood, Alaska: General permit coverage AKR10H155, held by Katherine Keith; Construction stormwater; Effective; issued June 18, 2026, term to January 31, 2031, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 1,206 were issued before AKR10H155. Katherine Keith holds 40 permits in Alaska.
Other permits held by Katherine Keith
- DALTON HIGHWAY MP 289 TO 305 REHABILITATION _2, Deadhorse: AKR10GP96, issued 2023-11-30
- NOORVIK AIRPORT REHABILITATION, Noorvik: AKR10H00U, issued 2024-10-14
- SAINT MARY'S AIRPORT IMPROVEMENTS, St Mary'S: AKR10H051, issued 2024-10-25
- NENANA-TOTCHAKET RD, Nenana: AKR10H05A, issued 2025-06-26
- RICHARDON HWY MP 359 RAILROAD GRADE SEPERATED FACILITY & RICHARDSON HWY MP 357-3, Fairbanks: AKR10H05U, issued 2023-03-03
- DALTON HIGHWAY MP 18-37 RECONSTRUCTION, Livengood: AKR10H06G, issued 2023-03-24
- ALASKA HIGHWAY PASSING LANES MP 1330-1400, Tok: AKR10H07D, issued 2024-08-15
- ELLIOTT HIGHWAY MP 51-63 REHABILITATION, Livengood: AKR10H0CS, issued 2023-08-10
- GLENN HWY PARKS TO S. INNER SPRINGER LOOP (PHASE II), Palmer: AKR10H0DN, issued 2026-03-02
- MARSHALL AIRPORT IMPROVEMENTS, Marshall: AKR10H0GC, issued 2024-04-02
Coverages issued nearest AKR10H155
- 2026-06-11: KODIAK REZANOF DRIVE RESURFACING: W. MARINE WAY TO AIRPORT, Kodiak: AKR10H14Y, held by Vicky Roberts
- 2026-06-15: CONE GRAVEL PIT, Kenai: AKR10H150, held by TODD PORTER
- 2026-06-15: HEALY CENTER PIT RD, Healy: AKR10H151, held by Ryan Moren
- 2026-06-15: VALDEZ PAVEMENT MANAGEMENT - PHASE IV, Valdez: AKR10H152, held by Bruce Van Buskirk
- 2026-06-16: SEWARD HIGHWAY MP90-99 PAVEMENT PRESERVATION PH.I, Girdwood: AKR10H153, held by Ryan Moren
- 2026-06-18: BIRCH MEADOWS, Anchorage: AKR10H156, held by Brandyn Roth
- 2026-06-19: JOHNSON BIVOUAC, Salcha: AKR10H157, held by Angie Hawks
- 2026-06-19: EAGLE RIVER UNDERGROUND: CITATION DR AND VFW LOOPING, Eagle River: AKR10H158, held by Josh Henrick
- 2026-06-22: CEA BELUGA SOLAR EXPANSION DISTRIBUTION, Beluga: AKR10H15A, held by Kcie Kolbeck
- 2026-06-23: JOHNSON TRACTS SITE INFRASTRUCTURE PORTAL ACCESS ROAD, Tuxedni Bay: AKR10H15B, held by Cap Shafer
SEWARD HIGHWAY MP 90-99 PAVEMENT PRESERVATION PH.I among its neighbors
19 discharge permits are in the Turnagain Arm subwatershed (HUC 190203020705); AKR10H155 is one. Its county: 555, 4 major; AKR10H155 is minor permit.
Other permits in the Turnagain Arm subwatershed (HUC 190203020705)
- ALPINE VIEW CHALETS, Girdwood: AKR10H0RB, minor, term to 2026-01-31
- ANCHORAGE AREA DRAINAGE IMPROVEMENTS, Anchorage: AKR10H03Q, minor, term to 2026-01-31
- ANCHORAGE AREA DRAINAGE IMPROVEMENTS FY2019, Anchorage: AKR10H03M, minor, term to 2026-01-31
- BIRD CREEK, Bird Creek: AKR10H0UA, minor, term to 2026-01-31
- GWID TRANSMISSION LINE GIRDWOOD TO INDIAN, Girdwood: AKR10H104, minor, term to 2031-01-31
- HOPE HIGHWAY MP 12.9 PIPE REPLACEMENT, Hope: AKR10H0Y6, minor, term to 2031-01-31
- HOPE HIGHWAY MP 12.9 PIPE REPLACEMENT, Hope: AKR10H0YD, minor, term to 2031-01-31
- HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage: AKR10GI41, minor, term to 2026-01-31
- HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage: AKR10GI51, minor, term to 2026-01-31
- QUARTZ CREEK TRANSMISSION LINE REBUILD GIRDWOOD TO INDIAN, Anchorage: AKR10H0G0, minor, term to 2026-01-31
What stands out
- Its term runs 4 years and 227 days, June 18, 2026 to January 31, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SEWARD HIGHWAY MP 90-99 PAVEMENT PRESERVATION PH.I |
|---|---|
| Permittee | Katherine Keith |
| NPDES ID | AKR10H155 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 18, 2026 |
| Expires | January 31, 2031 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Girdwood, AK 99587 |
| Subwatershed | Turnagain Arm (HUC 190203020705) |
NPDES AKR10H155: effluent limits and exceedances
SEWARD HIGHWAY MP 90-99 PAVEMENT PRESERVATION PH.I (NPDES AKR10H155): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10H155: no pollutant row on file.
NPDES AKR10H155: inspections, violations and enforcement
NPDES AKR10H155 (SEWARD HIGHWAY MP 90-99 PAVEMENT PRESERVATION PH.I): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10H155
NPDES AKR10H155: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10H155
NPDES AKR10H155: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.