NPDES AZR10I08P · Clean Water Act
UPPER VILLAGE OF MOENKOPI SEWER PHASE 2, Tuba City, AZ: NPDES AZR10I08P discharge permit, effluent exceedances, inspections, penalties
UPPER VILLAGE OF MOENKOPI SEWER PHASE 2, Tuba City, Arizona: General permit coverage AZR10I08P, held by Indian Health Services; Construction stormwater; Administratively continued; issued May 7, 2018, term to February 15, 2022, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 5 were issued before AZR10I08P.
Coverages issued nearest AZR10I08P
- 2013-09-23: U-HAUL OF SAVANNAH (CHATHAM COUNTY), Phoenix: GAR149247, held by AMERCO REAL ESTATE CO.
- 2017-04-26: N2007 (1-1) 1,2,4: 1389 NAVAJO, AZ BRIDGE AND ROAD CONSTRUCTION, Navajo: AZR10I01C, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2017-08-28: N2007(1-1)1,2,4 NAVAJO, AZ, Navajo: AZR10I04L, held by Navajo Region Division of Transportation
- 2017-10-04: T44/XF6 CHINLE SCATTERED, Many Farms: AZR10I05H, held by Navajo Area Indain Health Service
- 2018-04-09: LSCS K-6 SCHOOL PROJECT / LITTLE SINGER COMMUNITY SCHOOL, Winslow: AZR10I08D, held by Keyah Construction Inc
- 2018-06-22: GRAY MOUNTAIN WATERLINE EXTENSION - PHASE 1(XB9,XC1,T30), Cameron: AZR10I09P, held by Navajo Area Indian Health Service
- 2018-07-02: NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2018-08-20: JEDDITO MEMBER EXT. P4 (T42,XE1), Jeddito: AZR10I0AW, held by Navajo Area Indian Health Service
- 2019-03-26: GANADO AREA SCATTERED(U10), Ganado: AZR10I0EK, held by Navajo Area Indian Health Service
- 2019-06-24: LEUPP TO DILKON TRANSMISSION MAIN (U02), Dilkon: AZR10I0FG, held by NAVAJO AREA INDIAN HEALTH SERVICE
UPPER VILLAGE OF MOENKOPI SEWER PHASE 2 among its neighbors
37 discharge permits are in the Kerley Valley-Moenkopi Wash (Local Drainage) subwatershed (HUC 150200181004); AZR10I08P is one.
Other permits in the Kerley Valley-Moenkopi Wash (Local Drainage) subwatershed (HUC 150200181004)
- MOENKOPI WASH DRAINAGE IMPROVEMENTS, Tuba City: AZR10I1DN
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, minor, term to 2022-02-15
- NA-15-T46/XG1 CAMERON SCATTERED WATERLINE EXT, Tuba City: AZR10I0WH, minor, term to 2027-02-16
- NA-15-T46/XG1 CAMERON SCATTERED WATERLINE EXTENSIONS, Cameron: AZR10I0WX, minor, term to 2027-02-16
- NA-17-U03 GAP WASH CROSSING PHASE 2, The Gap: AZR10I0ZA, minor, term to 2027-02-16
- NA-17-U03, GAP WASH CROSSINGS, PHASE 2, Tuba City: AZR10I0Z5, minor, term to 2027-02-16
- NA-17-W14 TUBA CITY FAILED DRAINFIELDS, Tuba City: AZR10I0PO, minor, term to 2022-02-15
- NA-17-W14, TUBA CITY FAILED DRAINFIELD, Tuba City: AZR10I0PH, minor, term to 2022-02-15
- NA-17-XP2, COALMINE CANYON GOLDSPRINGS EXT, PHASE 1, Tuba City: AZR10I16S, minor, term to 2027-02-16
- NA-17-XQ2 GAP WASH CROSSING PHASE 1, Gap: AZR10I0ZB, minor, term to 2027-02-16
What stands out
- Its term runs 3 years and 284 days, May 7, 2018 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | UPPER VILLAGE OF MOENKOPI SEWER PHASE 2 |
|---|---|
| Permittee | Indian Health Services |
| NPDES ID | AZR10I08P |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 7, 2018 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Tuba City, AZ 86045 |
| Subwatershed | Kerley Valley-Moenkopi Wash (Local Drainage) (HUC 150200181004) |
NPDES AZR10I08P: effluent limits and exceedances
UPPER VILLAGE OF MOENKOPI SEWER PHASE 2 (NPDES AZR10I08P): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I08P: no pollutant row on file.
NPDES AZR10I08P: inspections, violations and enforcement
NPDES AZR10I08P (UPPER VILLAGE OF MOENKOPI SEWER PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I08P
NPDES AZR10I08P: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I08P
NPDES AZR10I08P: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.