NPDES AZR10I0S8 · Clean Water Act
NA-19-U94 CAMERON/GREY MOUNTAIN CISTERNS, Cameron, AZ: NPDES AZR10I0S8 discharge permit, effluent exceedances, inspections, penalties
NA-19-U94 CAMERON/GREY MOUNTAIN CISTERNS, Cameron, Arizona: General permit coverage AZR10I0S8, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Administratively continued; issued December 30, 2021, term to February 15, 2022, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 84 were issued before AZR10I0S8. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 145 permits in Arizona.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- N2007 (1-1) 1,2,4: 1389 NAVAJO, AZ BRIDGE AND ROAD CONSTRUCTION, Navajo: AZR10I01C, issued 2017-04-26
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, issued 2018-07-02
- NA-17-W09 SIHASIN OAK SPRINGS EAST CISTERNS, Oak Springs: AZR10I0H6, issued 2019-09-20
- NA-17-W08 SHIASIN OAK SPRINGS SOUTH CISTERNS, Oak Springs: AZR10I0H7, issued 2019-09-20
- NA-18-F70 FORT DEFIANCE MEDICAL REFERRALS 2018, Ganado: AZR10I0H9, issued 2019-09-20
- NA-17-F50 FORT DEFIANCE WEST HOUSING 2017, Burnside: AZR10I0HB, issued 2019-09-20
- NA-15-T56 TEESTO SAND DUNES EXTENSION, Teesto: AZR10I0HF, issued 2019-09-20
- NA-17-U02/ NA-21-W01/ NA-21-W71 LEUPP TO DILKON WATER TRANSMISSION LINE, Dilkon: AZR10I0HH, issued 2019-09-20
- NA-17-Q84/XO2/W28 HOUCK BURNTWATER WASH-HOUCK COMMUNITY WATER SYSTEM, Houck: AZR10I0I9, issued 2019-11-13
- NDOT RFP 18-10-1940LE: NECA 1402 WHEATFIELDS TO TSAILE WIDEN ROAD CONSTRUCTION, Wheatfields: AZR10I0ID, issued 2019-11-18
Coverages issued nearest AZR10I0S8
- 2021-11-01: NA-13-XB4/XD4/T37 DENNEHOTSO GARNET RIDGE EXTENSION, Dennehotso: AZR10I0RC, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2021-11-10: VAMORI WASH HIGH WATER CROSSING, San Miguel: AZR10I0RG, held by Meridian Engineering Co.
- 2021-11-19: RANCHO SOLANO, Scottsdale: AZR10I0RK, held by JS Waltz Construction
- 2021-11-23: PAPAGO FARMS FOB RENOVATION, Sells: AZR10I0RN, held by Walter Tom Berrett Jr.
- 2021-12-23: GRAYMOUNTAIN CISTERNS U94, Cameron: AZR10I0S3, held by Navajo Area Indian Health Services
- 2022-02-09: NA-18-F76 2018 WINSLOW SCATTERED, Winslow: AZR10I0SF, held by Navajo Area Indian Health Service
- 2022-03-14: ROUTE 6 (CUTTER ROAD) SEGMENT C4 MP 4.7 TO 7.1, San Carlos: AZR10I0ST, held by Hatch Construction & Paving, Inc
- 2022-03-15: NA-18-F76 WINSLOW SCATTERED 2018, Dilkon: AZR10I0SU, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2022-03-22: NA-16-T96-MEXICAN WATER SOUTHWEST WATERLINE EXTENSION, Mexican Water: AZR10I0SX, held by Navajo Area Indian Health Service
- 2022-03-24: NA-17-F53, KAYENTA SU SCATTERED HOUSING 2017, Kayenta: AZR10I0SY, held by Navajo Area Indian Health Services
NA-19-U94 CAMERON/GREY MOUNTAIN CISTERNS among its neighbors
37 discharge permits are in the Kerley Valley-Moenkopi Wash (Local Drainage) subwatershed (HUC 150200181004); AZR10I0S8 is one.
Other permits in the Kerley Valley-Moenkopi Wash (Local Drainage) subwatershed (HUC 150200181004)
- MOENKOPI WASH DRAINAGE IMPROVEMENTS, Tuba City: AZR10I1DN
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, minor, term to 2022-02-15
- NA-15-T46/XG1 CAMERON SCATTERED WATERLINE EXT, Tuba City: AZR10I0WH, minor, term to 2027-02-16
- NA-15-T46/XG1 CAMERON SCATTERED WATERLINE EXTENSIONS, Cameron: AZR10I0WX, minor, term to 2027-02-16
- NA-17-U03 GAP WASH CROSSING PHASE 2, The Gap: AZR10I0ZA, minor, term to 2027-02-16
- NA-17-U03, GAP WASH CROSSINGS, PHASE 2, Tuba City: AZR10I0Z5, minor, term to 2027-02-16
- NA-17-W14 TUBA CITY FAILED DRAINFIELDS, Tuba City: AZR10I0PO, minor, term to 2022-02-15
- NA-17-W14, TUBA CITY FAILED DRAINFIELD, Tuba City: AZR10I0PH, minor, term to 2022-02-15
- NA-17-XP2, COALMINE CANYON GOLDSPRINGS EXT, PHASE 1, Tuba City: AZR10I16S, minor, term to 2027-02-16
- NA-17-XQ2 GAP WASH CROSSING PHASE 1, Gap: AZR10I0ZB, minor, term to 2027-02-16
What stands out
- Its term runs 47 days, December 30, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-19-U94 CAMERON/GREY MOUNTAIN CISTERNS |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I0S8 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 30, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Cameron, AZ 86020 |
| Subwatershed | Kerley Valley-Moenkopi Wash (Local Drainage) (HUC 150200181004) |
NPDES AZR10I0S8: effluent limits and exceedances
NA-19-U94 CAMERON/GREY MOUNTAIN CISTERNS (NPDES AZR10I0S8): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I0S8: no pollutant row on file.
NPDES AZR10I0S8: inspections, violations and enforcement
NPDES AZR10I0S8 (NA-19-U94 CAMERON/GREY MOUNTAIN CISTERNS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I0S8
NPDES AZR10I0S8: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I0S8
NPDES AZR10I0S8: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.