NPDES FLR20CC28 · Clean Water Act
POWERLINE SUBSTATION, Crystal River, FL: NPDES FLR20CC28 discharge permit, effluent exceedances, inspections, penalties
POWERLINE SUBSTATION, Crystal River, Florida: General permit coverage FLR20CC28, held by Duke Energy Florida, LLC; Construction stormwater; Effective; issued May 18, 2018, term to May 17, 2023, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 493 were issued before FLR20CC28. Duke Energy Florida, LLC holds 10 permits in Florida.
Other permits held by Duke Energy Florida, LLC
- DUKE ENERGY FLORIDA - BARTOW PLANT, St Petersburg: FL0000132, issued 2016-01-05
- DUKE ENERGY FLORIDA - SUWANNEE RIVER POWER PLANT, Live Oak: FL0000183, issued 2016-10-06
- BARTOW POWER PLANT, St Petersburg: FLR05G904, issued 2019-08-08
- OSPREY ENERGY CENTER, Auburndale: FLR05I046, issued 2017-01-09
- NEWBERRY SUBSTATION, Trenton: FLR10YR36, issued 2026-08-15
- 16TH STREET SUBSTATION, Saint Petersburg: FLR20CI50, issued 2018-09-14
- BAILEY MILL RENEWABLE ENERGY CENTER, Monticello: FLR20IP56, issued 2025-09-21
- DUKE ENERGY MAXIMO SUBSTATION, Saint Petersburg: FLR20JO57, issued 2026-09-07
- TIGER BAY COGENERATION PLANT, Fort Meade: FLRNEE394, issued 2020-06-12
Coverages issued nearest FLR20CC28
- 2018-04-26: PORT EVERGLADES SOUTHPORT TURNINGNOTCH/CRANE RAIL, Fort Lauderdale: FLR20CA90, held by MOSS/KIEWIT, A JOINT VENTURE
- 2018-04-28: WILDBLUESOUTHWEST, Fort Myers: FLR20CB12, held by Pulte Home Company LLC
- 2018-05-04: PARKDALE PLACE, Oviedo: FLR20CB51, held by Park Square Enterprises, LLC
- 2018-05-14: PROVIDENCE-CAMDEN PARK, Davenport: FLR10RW20, held by Lennar Homes, LLC
- 2018-05-18: HIGHLAND RANCH CANYONS PHASE 5, Clermont: FLR10RW45, held by Taylor Morrison of Florida Inc
- 2018-05-20: MIROMAR LAKES, Miromar Lakes: FLR10RW54, held by Lyons Housing LLC
- 2018-06-01: THE ISLES AT LAKEWOOD RANCH, Lakewood Ranch: FLR10RX17, held by Toll Brothers Inc
- 2018-06-08: NEW PLACE, Sarasota: FLR20CD36, held by New Place
- 2018-06-14: LEXINGTON NORTH PHASES 2-5, Bradenton: FLR10RX86, held by Ryan Homes
- 2018-06-15: BAR HARBOUR SHOPS, Bal Harbour: FLR10RY35, held by Bal Harbour Shops LLLP
POWERLINE SUBSTATION among its neighbors
7 discharge permits are in the Little Rocky Creek-Cedar Creek Frontal subwatershed (HUC 031002070101); FLR20CC28 is one. Its county: 90, 2 major; FLR20CC28 is minor permit.
Other permits in the Little Rocky Creek-Cedar Creek Frontal subwatershed (HUC 031002070101)
- CITRUS COMBINED CYCLE PB1 PB2, Crystal River: FL0000159, major, term to 2025-03-12
- CRYSTAL RIVER SYNTHETIC GYPSUM STORAGE & HANDLING FACILITY, Crystal River: FLR05H686, minor, term to 2024-05-25
- CRYSTAL RIVER UNIT 3, Crystal River: FL0A00004, minor, term to 2025-02-11
- CRYSTAL RIVER UNIT 3 FORMER NUCLEAR POWER PLANT, Crystal River: FLR05I568, minor, term to 2025-10-14
- DUKE ENERGY FLORIDA - CRYSTAL RIVER 4 5, Crystal River: FL0036366, major, term to 2016-07-17
- FLORIDA POWER CORP, Crystal River: FLR05H479, minor, term to 2018-02-28
What stands out
- Its term runs 4 years and 364 days, May 18, 2018 to May 17, 2023; the term ended 1,217 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | POWERLINE SUBSTATION |
|---|---|
| Permittee | Duke Energy Florida, LLC |
| NPDES ID | FLR20CC28 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 18, 2018 |
| Expires | May 17, 2023 |
| Agency | Florida Department of Environmental Protection |
| Address | Crystal River, FL 34428 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Little Rocky Creek-Cedar Creek Frontal (HUC 031002070101) |
NPDES FLR20CC28: effluent limits and exceedances
POWERLINE SUBSTATION (NPDES FLR20CC28): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20CC28: no pollutant row on file.
NPDES FLR20CC28: inspections, violations and enforcement
NPDES FLR20CC28 (POWERLINE SUBSTATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20CC28
NPDES FLR20CC28: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20CC28
NPDES FLR20CC28: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.